CPUC Seal

PDF: Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC.

LARGE FILES: Files 3 MB or larger have sizes shown in parentheses. For best results when displaying large files, right-click the link and click "Save Target As". This will download the file to your computer. Browse to the save location and double-click the file to open it.

WEBSITE INFO: If you have any problems with this website, please report the issue to the Energy Division web coordinator.

Introduction and Background

Welcome to the California Public Utilities Commission (CPUC) website for California Environmental Quality Act (CEQA) review of the Southern California Edison Company (SCE) Valley–Ivyglen Subtransmission Line and Fogarty Substation Project.

Table 1 outlines the background for the Valley–Ivyglen Subtransmission Line and Fogarty Substation Project.

Table 1. Background for the proposed Valley–Ivyglen Project
January 16, 2007 SCE filed an application (No. 07-01-031) and Proponent’s Environmental Assessment with the CPUC for a Permit to Construct the Valley–Ivyglen 115-kV Subtransmission Line.
April 30, 2007 SCE filed an application (No. 07-04-028) and Proponent’s Environmental Assessment with the CPUC for a Permit to Construct for the Fogarty Substation.
June 7, 2007 CPUC determined that the Valley–Ivyglen 115-kV Subtransmission Line and Fogarty Substation applications would be consolidated into a single proceeding for CEQA analysis.
December 21, 2007 CPUC deemed the Valley–Ivyglen 115-kV Subtransmission Line and Fogarty Substation applications complete.
June 2009 CPUC released the Draft Environmental Impact Report (EIR) for the Valley–Ivyglen 115-kV Subtransmission Line and Fogarty Substation Project.
May 2010 CPUC released the Final EIR for the Valley–Ivyglen 115-kV Subtransmission Line and Fogarty Substation Project.
August 12, 2010 CPUC issued Decision 10-08-009 granting SCE a Permit to Construct the Valley–Ivyglen Subtransmission Line and Fogarty Substation Project.
June 2011 through January 2012 SCE substantially constructed Fogarty Substation.
April 2, 2013 SCE filed a Petition for Modification (PFM) for the Valley–Ivyglen Subtransmission Line and Fogarty Substation Project.
August 2013 CPUC determined it was in the public’s best interest to consolidate the environmental reviews of the Valley–Ivyglen Subtransmission Line Project and SCE Alberhill System Project Certificate of Public Convenience and Necessity (CPCN) application (A. 09-09-022; proposed Alberhill Project) into one EIR.
March 26, 2014 SCE filed a Motion to Bifurcate consideration of the modifications proposed to complete Fogarty Substation from consideration of the modifications proposed to start construction of the Valley–Ivyglen Subtransmission Line.
August 28, 2014 CPUC approved bifurcation of Fogarty Substation from the Valley–Ivyglen Subtransmission Line Project.
May 23, 2014 SCE filed an amended PFM for the Valley–Ivyglen Subtransmission Line Project (proposed Valley–Ivyglen Project).
April 28, 2015 CPUC deemed the PFM for proposed Valley–Ivyglen Project complete.
May 6, 2015 CPUC released an NOP for the proposed Alberhill Project and proposed Valley–Ivyglen Project

Project Overview

This section describes the proposed Valley–Ivyglen Project components as currently proposed in the 2014 PFM as amended by responses from SCE to CPUC requests for additional information.

The proposed Valley–Ivyglen Project would involve:

The alignment of the proposed Valley–Ivyglen Project would generally follow the route approved in 2010 by CPUC Decision 10-08-009, with modifications to address erosion and landslide activity that occurred in the area. The modified route would traverse unincorporated Riverside County and the cities of Menifee, Perris, and Lake Elsinore.

In addition to route realignment, the proposed Valley–Ivyglen Project would include the following modifications compared to the 2010 approved project: SCE anticipates that construction of the proposed Valley–Ivyglen Project would take approximately 27 months.

A description of the proposed Alberhill Project is located on the Alberhill website.

Environmental Review Process

SCE’s proposed Valley–Ivyglen Project and proposed Alberhill Project would be constructed within the same right-of-way (ROW) from the intersection of Collier Avenue and Third Street in the City of Lake Elsinore northwest approximately 6.5 miles to the proposed Alberhill Substation site. Within this ROW, the 115-kV conductor required for the proposed Alberhill Project would be installed on the 115-kV structures constructed as part of the proposed Valley–Ivyglen Project. Because the components of the proposed Valley-Ivyglen Project are required for construction of the proposed Alberhill Project, and the two proposed projects would be constructed during the same period, the CPUC determined that it would be in the public’s best interest to consolidate the CEQA analyses for the proposed Alberhill System Project CPCN application and the proposed Valley–Ivyglen Project PFM application into a single CEQA document.

As the lead agency, the CPUC will prepare one Draft and one Final EIR to evaluate the environmental impacts of both projects in accordance with the criteria, standards, and procedures of CEQA (Public Resources Code Sections 21000 et seq. and California Code of Regulations Title 14, sections 15000 et seq.).

Application and Proponent’s Environmental Assessment

CPUC reviewed SCE’s application (A. 07-01-031) for a Permit to Construct the Valley–Ivyglen Project, and Proponent’s Environmental Assessment (PEA) and associated appendices. The PEA provides information required to begin the independent environmental review process conducted by the CPUC.

NOP and Public Scoping

The CPUC circulated an NOP for the proposed Valley–Ivyglen Project (with project changes as described in the amended 2014 PFM) and proposed Alberhill Project on May 6, 2015, which opened a 30-day scoping period. The scoping period ended on June 5, 2015.

The CPUC hosted two scoping meetings for the proposed projects on May 18, 2015. One meeting was held at the Cesar E. Chavez Library in Perris from 1:00 to 2:30 pm. The second meeting was held at the Lake Elsinore Cultural Arts Center in Lake Elsinore from 6:00 to 7:30 p.m. Each meeting began with a brief presentation, followed by a period to answer specific questions about the proposed projects. Click the following links to view materials provided at the meetings:

The public and agencies were invited to submit written comments until the scoping period ended on June 5, 2015. The CPUC based the information and extent of analysis to be presented in the Draft EIR on input and comments received during public scoping.

Draft Environmental Impact Report (EIR) and Public Comment Period

As the CEQA Lead Agency, the CPUC prepared a Draft EIR for the proposed project in accordance with CEQA. Links to view the Notice of Completion, Notice of Availability, and Draft EIR are provided below.

Hardcopies of the Draft EIR are available at the following repositories:

Lake Elsinore Library
600 West Graham Avenue
Lake Elsinore, CA 92530
(951) 674-4517
Paloma Valley Library
31375 Bradley Road
Menifee, CA 92584
(951) 301-3682
Canyon Lake Library
31516 Railroad Canyon Road
Canyon Lake, CA 92587
(951) 244-9181
City of Perris Cesar E. Chavez Library
163 East San Jacinto Avenue
Perris, CA 92570
(951) 657-2358
Wildomar Library
34303 Mission Trail
Wildomar, CA 92595
(951)471-3855

The CPUC’s original public review period forthe Draft EIR was April 14, 2016 through May 31, 2016. The CPUC approved an extension of the public review period to July 15, 2016. The Notice of Extension of the Public Review Period for the Draft EIR can be found here. Written comments on the Draft EIR may be submitted using any of the following methods:

Email: VIG.ASP@ene.com
Fax: (415) 398-5326
Mail: California Public Utilities Commission
RE: VIG/ASP
c/o Ecology and Environment, Inc.
505 Sansome Street, Suite #300
San Francisco, CA 94111

The CPUC held public meetings on May 11 and 12, 2016, to explain the proposed projects, discuss the proposed projects’ significant impacts, and receive comments on the Draft EIR from the public. The first meeting was held at the Lake Elsinore Cultural Arts Center in Lake Elsinore from 6:00 to 8:00 p.m. on May 11, 2016. The second was held at the Cesar E. Chavez Library in Perris from 12:30 to 2:30 pm on May 12, 2016. Each meeting began with a brief presentation, followed by a period to answer specific questions about the proposed projects, and then an oral public comment period. Click the following links to view materials provided at the meetings:

The public and agencies were invited to submit written comments until the public review period ended on July 15, 2016. The CPUC will base the information and extent of analysis to be presented in the Final EIR on input and comments received during the public review period.

Final EIR

The Final EIR, including responses to comments, was released in April 2017. The CPUC will issue separate proposed decisions on SCE’s applications for the proposed Valley–Ivyglen Project and the proposed Alberhill Project.

Cover
TOC
Executive Summary
Chapter 1.0 – Introduction
Chapter 2.0 – Description of the Proposed Projects
Chapter 3.0 – Description of Alternatives
Chapter 4.0 – Introduction to the Environmental Analysis
Section 4.1 – Aesthetics
Section 4.2 – Agriculture and Forestry
Section 4.3 – Air Quality
Section 4.4 – Biological Resources
Section 4.5 – Cultural Resources
Section 4.6 – Geology, Soils, and Minerals
Section 4.7 – Greenhouse Gases
Section 4.8 – Hazards and Hazardous Materials
Section 4.9 – Hydrology and Water Quality
Section 4.10 – Land Use
Section 4.11 – Noise and Vibration
Section 4.12 – Population and Housing
Section 4.13 – Public Services and Utilities
Section 4.14 – Recreation
Section 4.15 – Traffic and Transportation
Chapter 5.0 – Comparison of Alternatives
Chapter 6.0 – Cumulative Impacts
Chapter 7.0 – Other CEQA Considerations
Chapter 8.0 – List of Preparers
Chapter 9.0 – Mitigation Monitoring Compliance and Reporting Plan
Appendix A – Public Scoping Report
Appendix B – Air Quality and GHG Emissions Appendix C: Best Management Practices: 2011 Weed Abatement and Demolition Activities
Appendix D: Alternatives Screening Report and Addendum
Appendix E: Biological Surveys
Appendix F: Biological Technical Reports
Appendix G: Special Status Plant Occurrence
Appendix H: MSHCP BMPs and Species-Specific Mitigation Measures
Appendix I: Native American Consultation Materials
Appendix J: Traffic Impact Analysis
Appendix K: Updated Electrical Forecasting and Support for Alternatives Analyses
Appendix L: Responses to Comments
Appendix M: Comments Received on the Draft EIR

Final EIR Errata

An Errata for the Final EIR was issued in February 2018.

Final EIR Errata #2

A second Errata was issued in June 2018.

Other Available Documents

Petitions for Modification

Valley–Ivyglen Subtransmission Line

The following 2014 Petition for Modification and Project Modification Report supersede the modifications specific to the Valley–Ivyglen Subtransmission Line described in the 2013 Valley–Ivyglen Subtransmission Line and Fogarty Substation Project Petition for Modification and Project Modification Report:

Fogarty Substation

The following Petition for Modification and Project Modification Report supersede the modifications specific to the Fogarty Substation described in the 2013 Valley–Ivyglen Subtransmission Line and Fogarty Substation Project Petition for Modification and Project Modification Report. The applicant’s Motion to Bifurcate is also provided.

Valley–Ivyglen Subtransmission Line and Fogarty Substation Project

Fogarty Substation Construction Notices to Proceed

Notice to Proceed (NTP) with construction of the Fogarty Substation was granted by the CPUC on February 8, 2011. Construction of Fogarty Substation began on May 17, 2011 and was substantially completed by January 2012. The NTPs for Fogarty Substation construction are provided here:

NTPs #1, #3, #4, and #5 were for work at the Fogarty Substation site. NTP #2 was for work associated with Fogarty Substation’s telecommunications system that took place at SCE’s Valley, Elsinore, and Ivyglen substations.

Environmental Impact Reports and Addendum

Fogarty Substation

Valley–Ivyglen Subtransmission Line and Fogarty Substation Project

Applications and Proponent’s Environmental Assessments

Data Requests and Responses

CPUC Application Proceedings Website

The CPUC’s proceedings website provides each of the CPUC ruling and decision documents associated with the Valley–Ivyglen Subtransmission Line and Fogarty Substation. The CPUC proceedings search website is available at: http://delaps1.cpuc.ca.gov/CPUCProceedingLookup. From the proceedings search website:

Note that the Proposed Decision for the two projects was released in April 2018.

For Additional Information

To request additional information or to be added to the mailing list, please contact us by email, fax, or phone, as follows:

Project email: VIG.ASP@ene.com
Project fax: 415-398-5326
Project voicemail: 855-277-9051 (toll free)

The CPUC’s Valley–Ivyglen Project Manager is:

Mr. Jensen Uchida, CPUC Project Manager
California Public Utilities Commission, Energy Division
505 Van Ness Avenue
San Francisco, CA 94102
Email: jensen.uchida@cpuc.ca.gov
Tel.: (415) 703-5484
Fax: (415) 703-2200