STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Southern California Edison's
Valley South 115 kV Subtransmission Project

(Application A.14-12-013 filed December 15, 2014)

 

Welcome to the California Public Utilities Commission (CPUC) website for SCE's Valley South 115 kV Subtransmission Project (Valley South). This website provides information on the status of the CPUC's environmental review of the project under the California Environmental Quality Act (CEQA).

SCE submitted an application for a Permit to Construct Electrical Facilities with Voltages between 50 kV and 200 kV to the CPUC on December 15, 2014. Concurrently, SCE also filed its Proponent's Environmental Assessment (PEA) for the project on this date. Based on a review of the application materials and responses to data requests, the CPUC determined that the application was complete in April 2015, which began the environmental review process under CEQA for Valley South.

Proposed Project

The Valley South project is proposed to be located in southwestern Riverside County. The documents provided on this website include more detail regarding the proposed location and key components of the project. A summary of the Proposed Project is provided below:

  • Modification of SCE's existing Valley 500/115 kV Substation would include equipping an existing 115 kV line position and providing protection equipment as required.
  • Construction of a new 115 kV subtransmission line originating at SCE's existing Valley 500/115 kV Substation and terminating at a Tubular Steel Pole (TSP) located at the southeast corner of Leon Road and Benton Road. The TSP is the common point of the three-terminal existing Valley-Auld-Triton 115 kV Subtransmission Line. The new construction and associated reconfiguration would result in the formation of the Valley-Auld No. 2 and Valley-Triton 115 kV Subtransmission Lines. The new 115 kV subtransmission line would be approximately 12 miles in length and is referred to as Segment 1 of the Proposed Project. The majority of the new line would be within existing rights-of-way (ROW), SCE fee-owned ROW (at Valley Substation), and franchise ROW (i.e., roads, streets, sidewalks).
  • Replacement of a segment of overhead conductor of the existing Valley-Auld-Triton 115 kV Subtransmission Line beginning at the TSP located at the southeast corner of Benton Road and Leon Road continuing south to the Terminal TSP located on the south side of Nicolas Road, approximately 250 feet west of Los Chorus Ranch Road in the City of Temecula. This reconductor segment is approximately 3.4 miles in length and is referred to as Segment 2 of the Proposed Project.
  • Relocation of existing distribution and telecommunication lines from old poles to new poles to support installation of Segments 1 and 2 of the new 115 kV subtransmission line.
  • Installation of telecommunication equipment at Triton and Valley Substations to connect the Proposed Project to SCE’s existing telecommunication system.

Final Environmental Impact Report

The CPUC released the Final Environmental Impact Report (Final EIR) for the Valley South Project on June 13, 2016 (Notice of Availability of the Final EIR). The Final EIR has been updated as a result of comments received on the Draft EIR. Appendix 5 of the Final EIR includes responses to all comments received on the Draft EIR during the public review period. Copies of the Final EIR are available for review at the following repository locations:

RepositoryAddress
Grace Mellman
Community Library
41000 County Center
Drive Temecula, CA 92591
Murrieta Public
Library
8 Town Square
Murrieta, CA 92562
Perris Library 163 E. San Jacinto
Perris, CA 92570
Paloma Valley Library 31375 Bradley Road
Menifee, CA 92584
Romoland Library 26001 Briggs Road
Sun City, CA 92585

After release of the Final EIR, Blum Collins LLC submitted a letter on behalf of the Socal Environmental Justice Alliance. A memorandum was prepared to address the comments made in the Blum Collins letter (Supplementary Appendix to Final EIR).

Draft Environmental Impact Report

The CPUC released the Draft Environmental Impact Report (Draft EIR) for Valley South on January 29, 2016 for a 46-day public review period, which ended on March 14, 2016 (Notice of Availability of the Draft EIR).
Hardcopies of the Draft EIR were made available for public review at the repository sites identified above.

Draft EIR Public Meeting

The CPUC held a public meeting on Monday February 22, 2016 from 6:00 to 8:00 p.m. at the Residence Inn Marriott (25407 Madison Avenue, Murrieta, CA). The public meeting provided an opportunity to learn about the Project, ask questions about the content of the Draft EIR, and provide written comments.

Other Project-related Documents (SCE Application and PEA)

This website provides access to public documents and information relevant to the CEQA review of the Valley South Project.

Application

Proponent's Environmental Assessment

For Additional Information

To request additional information or to be added to the mailing list, please contact us by phone or email, as follows:

Project Voicemail/Fax: (888) 400-3930
Project Email: Valley-South-Project@aspeneg.com

The CPUC's Project Manager is:
Eric Chiang, CPUC Project Manager
California Public Utilities Commission
505 Van Ness Avenue
San Francisco CA 94102