STATE
OF CALIFORNIA
|
Environmental ReviewWelcome to the California Public Utilities Commission (CPUC) web site for the Atlantic-Del Mar Reinforcement Project. On October 17, 2001, the CPUC released a Draft Mitigated Negative Declaration and Initial Study (MND/IS) for a 30-day review period. In response to numerous comments on potential visual impacts, the visual resources analysis has been revised and the MND/IS recommends mitigation requiring that the power line be installed underground from a location south of Sunset Boulevard to north of Midas Avenue. As a result, the analysis of all other environmental issue areas was reevaluated. Where potential new impacts were identified, those impacts are described and additional mitigation measures have been added. The Atlantic-Del
Mar Reinforcement Project was approved by the CPUC in Decision Click the links below to view the respective documents. Note: These documents are in Portable Document Format (PDF). To view them, please download the free Adobe Acrobat Reader if it is not already installed on your PC. Final MND/IS
Revised Draft MND/ISMND/IS Table of Contents Construction of the project is scheduled to begin in Spring 2004. Information on proposed construction activities is presented in the MND/IS documents that can be accessed above. Once construction begins, monthly monitoring reports will be posted on this website. For additional information,
contact Nicolas Procos at (415) |
|
This page contains tables and is best viewed with Netscape or Internet Explorer. Please report any problems to the Energy Division web coordinator. |