Executive
Summary...................................................................................
ES-1
A. Introduction
A.1 Purpose
and Authority............................................................................
A-1
A.2 CPUC
Regulatory Authority ....................................................................
A-1
A.3 Lead
and Responsible Agencies................................................................
A-2
A.4 Project
Background...............................................................................
A-2
A.5 Overview
of the EIR Process...................................................................
A-6
A.6 CPUC
Application Process .....................................................................
A-8
A.7 Public
Participation .............................................................................
A-10
A.8 Focus
of Analysis................................................................................
A-11
A.9 EIR
Content and Organization.................................................................
A-12
B. Project
Description
B.1
Introduction.........................................................................................
B-1
B.2
Project Overview.................................................................................
B-1
B.3
Project Location...................................................................................
B-2
B.4
Project Applicant..................................................................................
B-2
B.5
Project Objectives.................................................................................
B-5
B.6
Project Components...............................................................................
B-6
B.6.1 Domestic Water Transmission Line..................................................
B-6
B.6.2 On-site Water Facilities...............................................................
B-16
B.6.3 Wastewater Collection Facilities....................................................
B-20
B.7
Project Construction.............................................................................
B-24
B.7.1 Domestic
Water Transmission Line.................................................
B-24
B.7.2 On-site
Water Facilities...............................................................
B-33
B.7.3 Wastewater
Collection Facilities....................................................
B-36
B.8
Operation and Maintenance....................................................................
B-36
B.8.1 Domestic
Water Transmission Line.................................................
B-36
B.8.2 On-site
Water Facilities...............................................................
B-36
B.8.3 Wastewater Collection Facilities....................................................
B-37
B.9
Intended Uses of the EIR and Anticipated Agency Actions................................
B-37
B.10
References........................................................................................
B-38
C.
Environmental Impact Analysis.......................................................
C-1
C.1
Air Quality.......................................................................................
C.1-1
C.1.1 Environmental
Baseline and Regulatory Setting.................................
C.1-1
C.1.2 Environmental
Impacts and Mitigation Measures...............................
C.1-8
C.1.3 References..........................................................................
C.1-14
C.2 Noise.............................................................................................
C.2-1
C.2.1 Environmental
Baseline and Regulatory Setting.................................
C.2-1
C.2.2 Environmental
Impacts and Mitigation Measures...............................
C.2-9
C.2.3 References..........................................................................
C.2-13
C.3 Traffic
and Circulation.........................................................................
C.3-1
C.3.1 Environmental
Baseline and Regulatory Setting.................................
C.3-1
C.3.2
Environmental Impacts and Mitigation Measures.............................
C.3-10
C.4
Environmental Contamination.................................................................
C.4-1
C.4.1 Environmental
Baseline and Regulatory Setting.................................
C.4-1
C.4.2 Environmental
Impacts and Mitigation Measures...............................
C.4-7
C.4.3 References..........................................................................
C.4-11
C.5 Geology
and Soils...............................................................................
C.5-1
C.5.1 Environmental
Baseline and Regulatory Setting.................................
C.5-1
C.5.2 Environmental
Impacts and Mitigation Measures...............................
C.5-9
C.5.3 References..........................................................................
C.5-13
C.6 Hydrology
and Water Quality.................................................................
C.6-1
C.6.1 Environmental
Baseline and Regulatory Setting.................................
C.6-1
C.6.2 Environmental
Impacts and Mitigation Measures.............................
C.6-13
C.6.3 References..........................................................................
C.6-19
C.7 Cultural
Resources.............................................................................
C.7-1
C.7.1 Environmental
Baseline and Regulatory Setting.................................
C.7-1
C.7.2 Environmental
Impacts and Mitigation Measures.............................
C.7-13
C.7.3 Bibliography.........................................................................
C.7-17
C.8 Biological
Resources...........................................................................
C.8-1
C.8.1 Environmental
Baseline and Regulatory Setting.................................
C.8-1
C.8.2 Environmental
Impacts and Mitigation Measures...............................
C.8-6
C.8.3 References............................................................................
C.8-9
C.9 Land
Use and Recreation......................................................................
C.9-1
C.9.1 Environmental
Baseline and Regulatory Setting..................................
C.9-1
C.9.2 Environmental
Impacts and Mitigation Measures..............................
C.9-14
C.9.3 References............................................................................
C.9-17
C.10 Public
Services and Utilities.................................................................
C.10-1
C.10.1 Environmental
Baseline and Regulatory Setting................................
C.10-1
C.10.2 Environmental
Impacts and Mitigation Measures............................
C.10-12
C.10.3 References.........................................................................
C.10-18
D.
Alternatives Description and Comparison
D.1
Alternatives Process Overview ................................................................
D-1
D.2 Alternatives
Selected For Comparative Evaluation ........................................
D-10
D.3 No
Project Alternative .........................................................................
D-14
D.4 Comparative
Impact Analysis of Alternatives ..............................................
D-15
D.5 Conclusion
.......................................................................................
D-42
D.6 References
.......................................................................................
D-42
E.
Effects of Water Distribution and Wastewater Collection Facilities E-1
F. Other CEQA Considerations................................................................
F-1
G.
List of Preparers.................................................................................
G-1
H.
Persons and Organizations Consulted............................................
H-1
Appendices
Appendix 1: Pipeline
Route Segment Maps
Appendix 2: Notice
of Preparation (NOP) and Initial Study
Appendix 3: Scoping
Meeting Notices
Appendix 4: Air
Quality Calculations
Appendix 5: Storm
and Dry Weather Monitoring: Huntington Watershed and Huntington
Harbour
List of Tables
ES-1 Summary of Project
Components ................................................................. ES-3
ES-2 Summary of Impacts and
Mitigation Measures .................................................
ES-9
B.6-1 Detailed Route Description..........................................................................
B-10
B.7-1 Pipeline Construction Schedule.....................................................................
B-26
B.7-2 Equipment Inventory.................................................................................
B-27
B.7-3 Pipe Jacking Locations...............................................................................
B-33
B.9-1 Required Permits and Approvals .................................................................. B-37
C.1-1 Monthly Temperatures and
Precipitation........................................................ C.1-1
C.1-2 National and California Ambient
Air Quality Standards.......................................
C.1-4
C.1-3 Summary of Health Effects of the
Major Criteria Pollutants.................................
C.1-5
C.1-4 Attainment Status of South Coast
Air Basin.....................................................
C.1-5
C.1-5 Air Quality Summary...............................................................................
C.1-6
C.1-6 SCAQMD Threshold of Significance
for Construction Emission............................
C.1-9
C.1-7 SCAQMD Thresholds of Significance
for Operational Emissions...........................
C.1-9
C.1-8 Applicant Proposed Measures for
Air Quality................................................
C.1-10
C.1-9 Estimated Maximum Daily Pipeline
Construction Emissions...............................
C.1-11
C.1-10 Estimated Quarterly Pipeline Construction
Emissions........................................
C.1-11
C.1-11 Impact and Mitigation Summary – Air Quality................................................
C.1-14
C.2-1 Typical Sound Levels Measured in
the Environment and Industry...........................
C.2-1
C.2-2 Measured Ambient Noise Levels
Along the Proposed Pipeline Route......................
C.2-4
C.2-3 Sensitive Receptors Along the
Proposed Pipeline Route.......................................
C.2-6
C.2-4 Summary of Noise Levels
Identified as Requisite to Protect
Public Health and Welfare With an Adequate Margin of Safety............................. C.2-6
C.2-5 Land Use Compatibility for
Community Noise Environment.................................
C.2-7
C.2-6 Local Agency Ordinance Limits by
Land Use..................................................
C.2-8
C.2-7 Applicant Proposed Measures for
Noise....................................................... C.2-10
C.2-8 Noise Emission Characteristics of
Construction Equipment.................................
C.2-11
C.2-9 Impact and Mitigation Summary –
Noise....................................................... C.2-13
C.3-1 Impact and Mitigation Summary –
Traffic and Circulation..................................
C.3-19
C.4-1 Contaminated Properties Impact
Criteria........................................................ C.4-3
C.4-2
Hazardous Waste Sites With Potential To Impact the Proposed Project....................
C.4-4
C.4-3
Impact and Mitigation Summary – Environmental Contamination.......................... C.4-11
C.5-1
Significant Active Faults...........................................................................
C.5-3
C.5-2
Modified Mercalli Scale...........................................................................
C.5-4
C.5-3
Historic Earthquakes................................................................................
C.5-7
C.5-4
Impact and Mitigation Summary – Geology and Soils........................................
C.5-13
C.6-1
Daily Precipitation Data from Santa Ana, PRFD Station #121............................... C.6-2
C.6-2
Expected Value Discharges for Bolsa Chica Channel (CO2),
San Diego Freeway to Cerritos Avenue.........................................................
C.6-7
C.6-3 Expected Value Discharges for
Bolsa Chica Channel (CO2)
San Diego Freeway to Huntington Harbor Outlet...............................................
C.6-7
C.6-4 Discharges for Anaheim-Barber
City Channel..................................................
C.6-8
C.6-5 Impact and Mitigation Summary –
Hydrology and Water Quality..........................
C.6-18
C.7-1 Refined Coastal Chronology as
Defined by Mason and Peterson (1994)....................
C.7-3
C.7-2 Summary of Impact and Mitigation
– Cultural Resources...................................
C.7-17
C.8-1 Impact and Mitigation Summary –
Biological Resources......................................
C.8-9
C.9-1 Waterline Length by Jurisdiction.................................................................. C.9-2
C.9-2 Jurisdiction by Population and
Median Income..................................................
C.9-2
C.9-3 Impact and Mitigation Summary –
Land Use..................................................
C.9-16
C.10-1 Fire Stations Serving The Project Area........................................................ C.10-2
C.10-2 Police Departments By City .....................................................................
C.10-4
C.10-3 Schools and School Districts in the Proposed
Project Area..................................
C.10-5
C.10-4 Libraries in the Proposed Project Area......................................................... C.10-7
C.10-5 Utilities Adjacent to the Proposed Route
Alignment by Segment..........................
C.10-10
C.10-6 Impact and Mitigation Summary – Public
Service and Utilities...........................
C.10-18
D.1-1 Alternatives Screening Recommendations......................................................... D-4
D.4-1 Measured Ambient Noise Levels Along the
Anaheim-Barber City
Channel Diagonal Alternative Route..............................................................
D-19
D.4-2 Sensitive Receptors Along
Anaheim-Barber City Channel Diagonal Alternative Route...
D-20
D.4-3 Anaheim-Barber City Channel Diagonal
Alternative Hazardous Waste Sites
With Potential to Impact the Project...............................................................
D-24
D.4-4 Measured Ambient Noise Levels Along the
Springdale Street/Graham Street Route..... D-28
D.4-5 Sensitive Receptors Along the
Springdale Street/Graham Street Route.....................
D-28
D.4-6 Springdale Street/Graham Street
Alternative Hazardous Waste Sites
With Potential to Impact the Project...............................................................
D-33
D.4-7 Measured Ambient Noise Levels Along the
North Seal Beach Wellfields Route...........
D-37
D.4-8 Sensitive Receptors Along the North
Seal Beach Wellfields Route...........................
D.37
D.4-9 North Seal Beach Wellfields Alternative
Hazardous Waste Sites ............................
D-39
D.5-1 Impact Significance of Alternatives............................................................... D-43
D.5-2 Comparison of Alternatives.........................................................................
D-44
F-1 Cumulative
Projects List..............................................................................
F-4
List of Figures
ES-1 Proposed Water Transmission
Line Route.........................................................
ES-2
B-1 Regional Location.......................................................................................
B-3
B-2
Proposed Water Transmission Line Route..........................................................
B-4
B-3
Butterfly Valve Detail..................................................................................
B-7
B-4
Steel Casing Beneath Railroad Crossing.............................................................
B-8
B-5
Water Line Route Segments..........................................................................
B-12
B-6
Proposed Onsite Water Storage and Distribution Facilities..................................... B-17
B-7
Onsite Underground Reservoir Site Plan...........................................................
B-19
B-8
Proposed Wastewater Collection Facilities........................................................
B-22
B-9
Sewage Lift Station Site Plan........................................................................
B-23
B-10
Construction Segment Map...........................................................................
B-25
B-11
Pipeline Construction Diagram (Typical)..........................................................
B-29
B-12
Typical Pipeline Trenching/Bedding Diagram.....................................................
B-31
B-13
Conventional Boring Operation......................................................................
B-34
C.1-1 South
Coast Air Basin................................................................................
C.1-2
C.1-2 Wind
Rose for Newport Beach.....................................................................
C.1-3
C.2-1 Typical Range Of Common Sounds................................................................
C.2-2
C.2-2 Examples of Outdoor Day-Night Average Sound
Levels.......................................
C.2-3
C.2-3 Monitoring and Sensitive Receptor Locations
Along the Proposed and
Alternative Alignments..............................................................................
C.2-5
C.3-1 Roadway
System Travel Lanes and Intersection Controls......................................
C.3-3
C.3-2 1999
Daily Traffic Volumes........................................................................
C.3-4
C.3-3 Existing
Transit Routes..............................................................................
C.3-8
C.4-1 Hazardous Waste Sites with Potential to
Impact the Proposed Project.......................
C.4-5
C.5-1 Known
Active and Potentially Active Faults .....................................................
C.5-5
C.6-1
City of Huntington Beach Flood Hazard Areas...................................................
C.6-3
C.6-2 Watershed
Boundaries...............................................................................
C.6-4
C.6.3
Watersheds and Drainage Channels in Project Area............................................
C.6-5
C.6-4 Huntington
Watershed - Storm and Dry Weather Monitoring Location Map...............
C.6-10
C.6-5 Water
Quality Sampling Site Location Map - Huntington Harbour.......................... C.6-11
C.7-1 Quad
Maps for Cultural Resources Records Check ............................................
C.7-6
C.9-1 Aerial
Photograph of Project Area................................................................
C.9-3
D-1
Alternative Pipeline Routes Considered.............................................................
D-5