Welcome to the California Public Utilities Commission (CPUC) website
for the California Environmental Quality Act (CEQA) review of Pacific
Gas and Electric's (PG&E) proposed replacement of steam generators
at Diablo Canyon Power Plant (DCPP). An application for this project
was submitted to the CPUC on January 9, 2004. This site provides
access to public documents and information relevant to the CEQA
review process.
Background
PG&E has filed an application with the CPUC to replace the
steam generators at DCPP Units 1 and 2. The project would enable
DCPP to remain in service until the ends of the current terms of
the Nuclear Regulatory Commission (NRC) licenses. The current licenses
authorize DCPP Unit 1 to operate until 2021 and Unit 2 to operate
until 2025. However, the existing steam generators have exhibited
degradation and they are currently predicted to reach the end of
their operating life within the next several years. The original
steam generators will eventually reach a state where, under applicable
NRC regulations, either the steam generators must be replaced or
the units must be shut down.
DCPP Units 1 and 2 went into operation in 1985 and 1986, respectively.
DCPP uses eight steam generators, four per unit, which are large
heat exchangers that convert heat from the reactor into steam to
drive the turbine generators and produce electricity. All eight
would be replaced as part of the proposed project. DCPP produces
a combined nominal 2,220 net megawatts of electric power, enough
to power over 2 million homes. The DCPP facility is located on a
remote stretch of coastline in central San Luis Obispo County.
Proponent's Environmental Assessment
The PEA may be viewed here. It should
be noted that there have been a number of data requests and data
responses for this project, which have provided additional clarification
on project components as well as construction and operation activities.
The latest information for this project is
provided in the Section B
(Project Description) of the Draft EIR.
Notice of Preparation and Project
Scoping
The CPUC on October 1, 2004, issued a Notice
of Preparation of an Environmental Impact Report (EIR) for DCPP
Steam Generator Replacement Project. Scoping meetings were held
in October 2004. The Public Scoping Report
was completed in December 2004.
Draft Environmental Impact Report
The Draft Environmental Impact Report (DEIR) was issued on March
21, 2005 and can be viewed here.
The Notice of Availability describes
the project and the environmental review process.
The CPUC held two Public Workshops to describe the DEIR and its
findings and to hear public comments on the DEIR:
Public Workshops on Draft EIR
|
April 19 and 20, 2005
San Luis Obispo Library
Community Room
995 Palm Street
San Luis Obispo, CA 93401
|
The submittal period for written comments on the Draft EIR ended
May 5, 2005. Copies of the comments received may be viewed
here. Requests for additional information
should be sent to:
Andrew Barnsdale, CPUC Project Manager
c/o Aspen Environmental Group
235 Montgomery Street, Suite 935
San Francisco, CA 94104
Fax: (805) 888-2750
E-mail: diablocanyon@aspeneg.com
|