Welcome to the California Public Utilities Commission (CPUC) website
for the California Environmental Quality Act (CEQA) review of Pacific
Gas and Electric's (PG&E) proposed replacement of steam generators
at Diablo Canyon Power Plant (DCPP). An application for this project
was submitted to the CPUC on January 9, 2004. This site provides
access to public documents and information relevant to the CEQA
review process.
Background
PG&E has filed an application with the CPUC to replace the
steam generators at DCPP Units 1 and 2. The project would enable
DCPP to remain in service until the ends of the current terms of
the Nuclear Regulatory Commission (NRC) licenses. The current licenses
authorize DCPP Unit 1 to operate until 2021 and Unit 2 to operate
until 2025. However, the existing steam generators have exhibited
degradation and they are currently predicted to reach the end of
their operating life within the next several years. The original
steam generators will eventually reach a state where, under applicable
NRC regulations, either the steam generators must be replaced or
the units must be shut down.
DCPP Units 1 and 2 went into operation in 1985 and 1986, respectively.
DCPP uses eight steam generators, four per unit, which are large
heat exchangers that convert heat from the reactor into steam to
drive the turbine generators and produce electricity. All eight
would be replaced as part of the proposed project. DCPP produces
a combined nominal 2,220 net megawatts of electric power, enough
to power over 2 million homes. The DCPP facility is located on a
remote stretch of coastline in central San Luis Obispo County.
Notice of Preparation and Project
Scoping
The CPUC on October 1, 2004, issued a Notice
of Preparation of an Environmental Impact Report (EIR) for DCPP
Steam Generator Replacement Project. In order to gather information
on public and agency concerns about the project as proposed and
recommendations about alternatives, two public scoping meetings
have been scheduled for October 27, 2004, at the following
times and location:
Date |
October 27, 2004 |
Times |
2:30 - 4:30 p.m. and 7:00 - 9:00 p.m. |
Location |
San Luis Obispo Library
Community Room
995 Palm Street
San Luis Obispo, CA 93401 |
Comments on specific topics and alternatives that should be included
in the EIR can be mailed to:
Nicolas Procos
California Public Utilities Commission
c/o Aspen Environmental Group
235 Montgomery Street, Suite 935
San Francisco, CA 94104
Comments can also be submitted by fax: (805) 888-2750. Email comments
can be sent to the following address: diablocanyon@aspeneg.com.
All comments must be postmarked by November 1, 2004.
Proponent's Environmental Assessment
(PEA)
The PEA may be viewed here. It should
be noted that there have been a number of data requests and data
responses for this project, which have provided additional clarification
on project components as well as construction and operation activities.
The latest information for this project will be provided in the
project description of the Draft EIR that is currently being prepared
for the DCPP Steam Generator Replacement Project.
Draft Environmental Impact Report
The CPUC is currently preparing a Draft EIR for the proposed project.
When completed, the Draft EIR will be released for public review
and will be available on this website.
For Additional Information
The CPUC, through its Environmental Review Team, is conducting
an environmental review of the project. The CPUC's Project Manager
is:
Nicolas Procos, CPUC Project Manager
California Public Utilities Commission
505 Van Ness Avenue
San Francisco CA 94102
Tel. (415) 703-5289
Fax (415) 703-2200
Email: NBP@cpuc.ca.gov
To request additional information or to be added to the mailing
list, please contact us by email, fax, or phone, as follows:
Project email: diablocanyon@aspeneg.com
Project fax and voicemail: (805) 888-2750
|