Welcome to the California Public Utilities Commission (CPUC) website
for the California Environmental Quality Act (CEQA) review of proposed
construction of the DeversPalo Verde 500 kV No. 2 Project
transmission line. An application for this project was submitted
to the CPUC on April 11, 2005. The application is currently being
reviewed for completeness and compliance with CPUC requirements.
This site provides access to public documents and information relevant
to the CEQA review process.
Background
SCE has filed an application with the CPUC to construct the DeversPalo
Verde 500 kV No. 2 Project (DPV2). The CPUC is the CEQA lead
agency and the U.S. Bureau of Land Management is the lead agency
under the National Environmental Policy Act (NEPA). This project
was approved by the California Independent System Operator (CAISO)
in February 2005.
The DPV2 Project as proposed by SCE includes a new 230-mile 500
kV line from the Harquahala Substation (in Arizona, near the Palo
Verde nuclear power plant) to SCE's Devers Substation (in North
Palm Springs, California). The 500 kV portion would follow the existing
SCE 500 kV transmission line, DeversPalo Verde No. 1
(DPV1).
The DPV2 Project also includes upgrades to an additional 50 miles
of 230 kV transmission lines west of the Devers Substation. Forty
miles of 230 kV transmission line from Devers Substation to San
Bernardino Junction at the western end of San Timoteo Canyon would
be reconfigured and two separate 230-kV corridors, from San Bernardino
Junction to SCE's Mountain View Substation and from San Bernardino
Junction to SCE's Vista Substation would be reconductored. To view
a map of the project location, click here.
Proponent's Environmental Assessment
(PEA)
The PEA may be viewed here. It should
be noted that there will be a number of data requests and data responses
for this project, which will provide additional clarification on
project components as well as construction and operation activities.
The latest information for this project will be provided in the
project description of the Draft EIR/EIS that will be prepared for
the DPV2 Project.
Notice of Preparation/Notice
of Intent and Project Scoping
After the application is found to be complete, a Notice of Preparation
of an Environmental Impact Report (EIR) and Notice of Intent to
prepare an Environmental Impact Statement (EIS) for the DeversPalo
Verde 500 kV No. 2 Project will be posted on this website,
and a series of public scoping meetings will be held. The purpose
of the public scoping meetings is to gather information on public
and agency concerns about the project as proposed and also to hear
recommendations about alternatives. When the scoping meetings are
set up, the schedule for the public scoping meetings will be posted
here along with the Notice of Preparation/Notice of Intent.
Draft Environmental Impact Report/Environmental
Impact Statement
The CPUC will prepare a Draft EIR/EIS for the proposed project. When completed, the Draft EIR/EIS will be released for public review and will be available on this website.
For Additional Information
The CPUC, through its Environmental Review Team, is conducting
an environmental review of the project. To request additional information
or to be added to the mailing list, please contact us by email,
fax, or phone, as follows:
The CPUC's Project Manager is:
Billie Blanchard, CPUC Project Manager
California Public Utilities Commission
505 Van Ness Avenue
San Francisco CA 94102
Tel. (415) 703-2068
Fax (415) 703-2200
Email: bcb@cpuc.ca.gov
|