STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Southern California Edison's
Eldorado-Lugo-Mohave Series Capacitor Project

Application A.18-05-007, filed May 2, 2018

   
 

   
Draft Initial Study/Mitigated Negative Declaration

These files are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 10MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat.
Entire document in one file (89MB)

Notice of Intent and Notice of Availability
Cover
Title Page
Contents
List of Acronyms

1. Mitigated Negative Declaration
1.1 Project Objectives
1.2 Introduction
1.3 Project Description
1.4 Initial Study
1.5 Applicant Proposed Measures and Mitigation Measures
2. Environmental Determination
2.1 Environmental Factors Potentially Affected
2.2 Environmental Determination
3. Introduction to the Initial Study
3.1 Proposed Project Overview
3.2 Environmental Analysis
4. Project Description (26MB)
4.1 Project Information
4.2 Project Capacity and Objectives
4.3 Project Location
4.4 Project Components - Overview
4.5 Project Components by System
4.6 Right-of-Way Requirements
4.7 Construction
4.8 Operation and Maintenance
4.9 Applicant-Proposed Measures and Standard Practices
4.10 Electric and Magnetic Fields
4.11 References
Figure 4-1. Proposed Project Regional Overview Map
Figure 4-2. Project Overview
Figure 4-3. Ludlow Series Capacitor Detail
Figure 4-4. Newberry Springs Series Capacitor Detail
Figure 4-5. Ludlow-Newberry Springs Distribution/Telecom Detail
Figure 4-6. Barstow Repeater Detail
Figure 4-7. Kelbaker Repeater Detail
Figure 4-8. Lanfair Repeater Detail
Figure 4-9. Underground Telecommunication Line Detail
Figure 4-10. Lugo Substation Detail
Figure 4-11. Mohave Substation Detail
Figure 4-12. Eldorado Substation Detail
Figure 4-13. Typical Site Plan for the Fiber Optic Repeater Sites
Figure 4-14. Typical Elevation for the Fiber Optic Repeater Sites
Figure 4-15. Typical Single-circuit 500 kV Dead-End Tower
Figure 4-16. Typical Single-circuit 500 kV Suspension Tower
Figure 4-17. Typical Tubular Steel Pole
Figure 4-18. Use of a Body Extension to Raise a Tower
Figure 4-19. Use of Ground Wire Peak (GWP) and Body Modifications to Support OPGW Installation
Figure 4-20. Typical Subtransmission Structures
Figure 4-21. Typical Telecommunication Duct Bank
Figure 4-22. Typical Manhole
Figure 4-23. Typical Mid-line Series Capacitor Layout
Figure 4-24. Typical Mid-line Series Capacitor Profile


Attachment 4.A. Discrepancy Work Areas
Attachment 4.B. Tower Modifications Associated with Optical Ground Wire Installation
Attachment 4.C. Construction Equipment and Workforce Estimates

5. Environmental Analysis (61MB)
Introduction
Format of Environmental Resource Sections

5.1 Aesthetics
Figure 5.1-1. Devers-Red Bluff 500 kV Mid-Line Capacitor
Figure 5.1-2. Viewpoint Locations


Attachment 5.1A. Characterization Photographs
Attachment 5.1B. BLM Visual Contrast Rating Worksheets
Attachment 5.1C. Visual Simulations


5.2 Agriculture and Forestry Resources

5.3 Air Quality

5.4 Biological Resources

5.5 Cultural Resources

5.6 Energy

5.7 Geology and Soils
Figure 5.7-1. Geological Formations in the Proposed Project Area
Figure 5.7-2. Active and Potentially Active Faults in the Proposed Project Area


5.8 Greenhouse Gas Emissions

5.9 Hazards and Hazardous Materials

5.10 Hydrology and Water Quality

5.11 Land Use and Planning
Figure 5.11-1. Primary Land Jurisdictions Along the Proposed Project

5.12 Mineral Resources

5.13 Noise

5.14 Population and Housing

5.15 Public Services
Figure 5.15-1. Public Services within the Vicinity of the Proposed Project

5.16 Recreation
Figure 5.16-1. Recreational Facilities Within 1 Mile of the Proposed Project

5.17 Transportation
Figure 5.17-1. Roadway Network in the Vicinity of the Proposed Project

5.18 Tribal Cultural Resources

5.19 Utilities and Service Systems

5.20 Wildfire
Figure 5.20-1. Fire Risk

5.21 Mandatory Findings of Significance
Figure 5.21-1. Cumulative Projects within 5 Miles of the Proposed Project

6. Mitigation Monitoring Plan
6.1 Minor Project Refinements
6.2 Dispute Resolution
7. Response to Comments (reserved for Final IS/MND)
Appendices
Appendix A. List of Preparers
Appendix B. Air Quality-Greenhouse Gas Emissions Data
Appendix C. California Local Regulations
Appendix D. Biological Resources
   

This page contains tables and is best viewed with Firefox or Internet Explorer. Please report any problems to the Energy Division web coordinator.

   
 
Project Home Page - CPUC Environmental Information - CPUC Home