STATE OF CALIFORNIA
|
These files are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 5.0MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat. |
Welcome to the California Public Utilities Commission (CPUC) website
for the environmental review of Southern California Edison's (SCE's) Ivanpah-Control
Project ( The Proposed Project will be reviewed under the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA). The CPUC is the CEQA lead agency and the Bureau of Land Management (BLM) will be preparing a separate environmental document as the NEPA lead agency. This website provides access to public documents and information relevant to the CEQA environmental review processes. An overview of the proposed Project is provided below. For additional information on the CPUC proceeding, contact the Public Advisor's Office. DESCRIPTION OF THE PROPOSED PROJECT According to SCE, the Project is needed in order to meet the transmission line safety and reliability requirements defined by the CPUC and the North American Electric Reliability Corporation. The Project would involve the demolition and replacement of some or all of SCE's existing 115 kV transmission lines between the Ivanpah and Control Substations. SCE anticipates that the SCE has proposed a "Full-Rebuild Concept" and an alternative with a smaller scope. Alternatives analyzed in the EIR will be formally defined after the Scoping process. The "Full-Rebuild Concept" consists of the following major components:
ENVIRONMENTAL REVIEW Proponent's Environmental Assessment (PEA) and Application SCE filed an application and PEA
for the The CPUC is conducting a completeness/deficiency review of the application and PEA. This review will result in the definition of PEA deficiency items that will be detailed in a letter to SCE. Environmental Review The environmental review process for the
COMMENTS & QUESTIONS If you have comments, complaints, or questions regarding the project,
please contact us using the CPUC's Project e-mail: Ivanpah-Control@aspeneg.com
Project voicemail: 800-535-2572 The CPUC's Project Manager is:
Billie Blanchard, CPUC Project Manager California Public Utilities Commission c/o Aspen Environmental Group 235 Montgomery Street, Suite 640 San Francisco, CA 94104-2920 |
|
This page contains tables and is best viewed with Firefox or Internet Explorer. Please report any problems to the Energy Division web coordinator. |
|
Project Home Page - CPUC
Environmental Information - CPUC Home
|