- LEVEL (3) COMMUNICATION INFRASTRUCTURE PROJECT
- MITIGATED NEGATIVE DECLARATION
- AND INITIAL STUDY
- CONTENTS
MITIGATED NEGATIVE DECLARATION
INITIAL STUDY
1. PROJECT OVERVIEW
- 1.1 Project Background
- 1.2 Purpose and Scope of the Initial
Studies
2. PROJECT DESCRIPTION
- 2.1 Introduction
- 2.2 Project Location
- 2.3 Construction and Operation Overview
- 2.4 Required Permits and Approvals
- 2.5 Applicant-Proposed Mitigation
3. ENVIRONMENTAL SETTING
4. ENVIRONMENTAL IMPACT ASSESSMENT SUMMARY
- 4.1 Impact Assessment
Methodology
- 4.2 Cumulative Impact Assessment
Methodology
- 4.3 Impact Conclusion Summary
5. INITIAL STUDY DETERMINATION
6. SOURCES
7. LIST OF PREPARERS
LIST OF TABLES
- 2-1 Long-Haul Network Elements
- 2-2 Attributes of Each Project Facility Relevant to
Impact Assessment
4-1 Additional Mitigation Measures Summary
LIST OF FIGURES
- 1 Level (3) Communications, LLC California
Statewide Statement Network
- 2 Level (3) Communications, LLC California Network
Elements
CONTENTS
APPENDIX A. SITE AND ROUTE ENVIRONMENTAL
CHECKLISTS
- 1.
Tionesta
3R
- 2.
Palo
Cedro ILA
- 3.
Dibble
Creek Workaround
- 4.
Corning
ILA
- 5.
Colusa
ILA
- 6.
Sacramento
Terminal
- 7.
Fairfield
ILA
- 8.
Emeryville
ILA D-Node
- 9.
San
Ardo ILA
- 10.
Cuesta Grade Workaround
- 11.
San Luis Obispo 3R D-Node
- 12.
Gaviota Workaround
[Applicant withdrew this site.]
- 13.
Refugio Workaround
[Applicant withdrew this site.]
- 14.
Santa Barbara ILA
- 15.
Ventura ILA
- 16.
Moorpark ILA
- 17.
Stockton ILA
- 18.
Fresno 3R
- 19.
Hanford ILA
- 20.
Bakersfield ILA
- 21.
San Bernardino Terminal
- 22.
Irvine D-Node
[Applicant withdrew this site.]
- 23.
Corona ILA
- 24.
El Centro ILA