The Nevada Hydro Company's Talega-Escondido/Valley-Serrano 500 kV Interconnect Project

(Application A.07-10-005)


Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat

Welcome to the California Public Utilities Commission (CPUC) website for the California Environmental Quality Act (CEQA) review of the proposed construction of The Nevada Hydro Company Inc.'s (TNHC) Talega-Escondido/Valley-Serrano (TE/VS) 500 kV Interconnect Project. An application for this project was submitted to the CPUC on October 9, 2007 (A.07-10-005). This site provides access to public documents and information relevant to the CEQA review process.

Background

TNHC has filed an application for a Certificate of Public Convenience and Necessity (CPCN) with the CPUC to construct the TE/VS 500 kV Interconnect Project. The CPUC is the CEQA lead agency for the TE/VS transmission line project .

The TE/VS project is necessary in order to:

  1. Provide a transmission interconnection from the proposed Lake Elsinore Advanced Pumped Storage (LEAPS) hydroelectric facility to the transmission systems of Southern California Edison (SCE) and San Diego Gas & Electric (SDG&E);

  2. Interconnect the SCE and SDG&E transmission systems and facilitate wholesale bulk power transfers between those systems and from neighboring areas and those systems.

The TE/VS 500 kV Transmission Line, as proposed by TNHC will be a 500 kV alternating current regional interconnection transmission line with a nominal design capacity of 1,000 MW. The transmission line will be approximately 30 miles in length and will extend from the proposed LEAPS facility in Lake Elsinore, southward to SDG&E's existing 230 kV Talega-Escondido transmission line in San Diego County, and northward to SCE's existing 500 kV Valley Serrano transmission line in Riverside County. The interconnection with SDG&E will be between SDG&E's existing Talega and Escondido substations at a new substation in the vicinity of Camp Pendleton. The interconnection with SCE's network will be at a point between SCE's Valley and Serrano Substations, at a new substation in the vicinity of Lee Lake. In addition to the improvements described above, TNHC's TE/VS Interconnect Project will require numerous upgrades to the networks of SDG&E and SCE.

Application and Proponent's Environmental Assessment (PEA)

The application and the Draft PEA for the TE/VS project were filed with the CPUC on October 9, 2007. The documents may be viewed here. The CPUC sent a comment letter on the Draft PEA on November 16, 2007. The applicant revised the PEA and filed a Final PEA to the CPUC on February 8, 2008. The CPUC formally reviewed the PEA for completeness, and sent a deficiency letter on March 6, 2008. After a subsequent meeting with the Applicant, the CPUC sent a letter regarding needed biological surveys on March 25, 2008.

For Additional Information

To request additional information regarding this project, please contact the following:

Billie Blanchard - CPUC Project Manager
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CA 94102
Tel. (415) 703-2068
Fax. (415) 703-2200
Email: bcb@cpuc.ca.gov
   