Except as noted with an asterisk (*), the following documents are
available at 28 libraries and offices
in the project area.
Comment letters received on
the Modified Route D Alternative from mid-June to October 2007
Comment letters received in
response to the May 16, 2007 Notice on the Modified Route D
Alternative*
CPUC/BLM Notice Regarding
an Additional EIR/EIS Alternative to the Proposed Sunrise Powerlink
Project (May 16, 2007)
Scoping Report, Part 2
(April 2, 2007)
Notice Regarding
Conclusions on EIR/EIS Alternatives to the Proposed Sunrise Powerlink
Project (March 16, 2007)
Figure
1. Imperial Valley Link Alternatives
Figure 2.
Anza-Borrego Link Alternatives
Figure 3. Central
Link Alternatives
Figure 4.
Inland Valley Link Alternatives
Figure
5. Coastal Link Alternatives Retained
Figure
6. Coastal Link Alternatives Eliminated
Figure
7. Southwest Powerlink Alternatives
Notice of Second
Round of Scoping Meetings on Alternatives to the Proposed Sunrise
Powerlink Project (January 22, 2007)
Figure 1.
Sunrise Powerlink Project Overview
Figure 2. Imperial Valley
Link Alternatives
Figure 3. Anza-Borrego Link
Alternatives
Figure 4. Central Link Alternatives
Figure 5. Inland Valley Link
Alternatives
Figure 6. Coastal Link Alternatives
Retained
Figure 7. Coastal Link Alternatives
Eliminated
Figure 8. Southwest Powerlink
Alternatives
Figure 9. Non-Wires Alternatives
Figure 10. System Alternatives
Scoping Report, Part 1
(November 29, 2006)
Notice of Preparation
(NOP) (September 15, 2006)
Figure 1.
Proposed Project Overview
Figure 2. Imperial Valley
Link
Figure 3. Anza-Borrego Link
Figure 4A. Central Link
Figure 4B. Proposed Central
East Substation
Figure 5A. Inland Valley
Link
Figure 5B. Detail of Ramona
Area
Figure 6A. Coastal Link
Figure 6B. Rancho Peñasquitos
Detail
Figure 7. SDG&E Alternatives
Fully Evaluated and Carried Forward in PEA
Figure 8. SDG&E Alternatives
Considered and Eliminated
Notice of Intent
(August 31, 2006)
SDG&E's
Application and Proponent's Environmental Assessment (August 4,
2006).
|