These files are in Portable Document Format (PDF).
To view them, you will need to download the free Adobe
Acrobat Reader if it is not already installed on your PC.
Note: For faster results in displaying the largest files
(see sizes in parentheses for files over 5.0MB), right-click
the file's link, click "Save Target As" to download
the file to your hard drive, then double-click the downloaded file.
The most recent documents
appear at the top of this list.
Weed Control
Plan (25.4MB)
RECON Environmental, 9/2/10; compliance with
Mitigation Measure B-3a
Historical Properties Management Plan:
ASM Affiliates, Inc., July 2010
Final
Historical Properties Management Plan
Appendix
A: Programmatic Agreement
Appendix
B: Mitigation Monitoring, Compliance, and Reporting Program,
with appendices (24.9MB)
Appendix
C: Research Design
Appendix
D: Impacts Analysis
- Summary
Table of Archaeological Sites Identified within the SRPL Survey
Corridor with Assigned Dates
- Table
1: Proposed Eligibility Testing Methods and Data Potential Matrix
for Sunrise Sites Subject to Impacts
- Table
2: Proposed Environmentally Sensitive Area (ESA) and Monitoring
Mitigation for the SRPL FESSR
Appendix
E: Evaluation and Monitoring Methods
Appendix
F: Curation Agreement - to be included at a later date
Appendix
G: Native American Graves Protection and Repatriation Act (NAGPRA)
Regulations
Appendix
H: Resumes of Preparers
Appendix
I: Native American Consultation
Final
Paleontological Monitoring Treatment Plan
(9.1MB)
Department of PaleoServices, San Diego Natural History
Museum, 6/17/10; compliance with Mitigation Measures PAL-1a
and PAL-1b
Fire
Mitigation Funds Utilization Plan
SDG&E, 6/1/10; compliance with Mitigation Measures
F-1e and F-3a
Sampling
and Testing Plan
SDG&E, 3/24/10; compliance with Mitigation Measures
P-2a and P-7a and APM HS-APM-5
Hazard
Communication Plan
SDG&E, 3/21/10; compliance with Mitigation
Measure P-1a and APMs HS-APM-1 and HS-APM-3
Construction
Notification Plan
SDG&E, 3/1/10; compliance with Mitigation Measures
L-1a, S-2a, and F-3b, and APMs LU-APM-1
and LU-APM-4
Creek Crossing Scour and Erosion Protection Plan
SDG&E, Initial
Submittal, 2/22/10; compliance with Mitigation Measure H-8a
SDG&E, Response,
4/16/10; compliance with Mitigation Measure H-8a
SDG&E, Response,
6/10/10; compliance with Mitigation Measure H-8a
Construction
Emissions Monitoring Plan
SDG&E, 1/21/10; compliance with Mitigation Measures
AQ-1b and AQ-1h, and APMs AQ-APM-4 and
AQ-APM-5
Mountain Springs Grade Storm
Water Pollution Prevention Plan
TRC, 12/15/09; compliance with Mitigation Measures
H-1a, H-1b, and H-6a, and APMs WQ-APM-4 and WQ-APM-14
Addendum No. 3
to Phase I Environmental Site Assessment
Geosyntec Consultants, 12/3/09; compliance with
Mitigation Measures P-2a and P-7a and
APM HS-APM-5 (16.3MB)
Construction
Fire Prevention Plan
SDG&E, 12/1/09; compliance with Mitigation
Measure F-1a
California
Department of Fish & Game Notification of Lake or Streambed
Alteration Application
WRA Environmental Consultants, 11/30/09
Attachments (717 files) - View a list
of attachments available by email or mailed CD.
Dust
Control Plan
Sempra Energy, 11/09; compliance with Mitigation Measure AQ-1a
and APMs AQ-APM-1, AQ-APM-2, and AQ-APM-3
Cover Letter
Appendix
A - Final Environmentally Superior Southern Route Construction Mapbook
(60.9MB)
Appendix
B - Water Sites Mapbook (6.8MB)
Appendix
C - Dust Control Plan Form
Appendix
D - Daily Log
State Water Resources
Control Board Section 401 Water Quality Certification Application
WRA Environmental Consultants, 10/8/09
Attachments (716 files) - View
a list of attachments available by email or mailed CD.
U.S. Army Corps of Engineers Section 404 Permit Application:
Permit Application
NWP 12
Nationwide Permit Pre-Construction
Notification (PCN) Form
WRA Environmental Consultants, 9/28/09
Attachments (529 files) - View a list
of attachments available by email or mailed CD.
SDG&E
Revised and Updated Preliminary Jurisdiction Determination Report
WRA Environmental Consultants, 7/23/09
Appendices & Attachments (319 files) - View
a list of appendices/attachments available by email or mailed
CD.
Desert
Pavement Protection Plan
Burns & McDonnell Engineering Company, Inc.,
7/09; compliance with Mitigation Measure G-2a
SDG&E
Air Quality Mitigation Program for Construction Air Emissions, including
emission calculations
SDG&E, 6/9/09; compliance with Mitigation Measure
AQ-1h
Subsurface
Utility Report #5 - Sunrise Powerlink Alpine Boulevard Project
GeoSyntec Consultants, 4/14/09
Subsurface
Utility Report #1 - Sunrise Powerlink Coastal Link Project
GeoSyntec Consultants, 2/20/08
|