Table
of Contents
Executive
Summary
- Introduction
- Description of Proposed Project and Alternatives
- 2.1 Figure ES-1 Alternatives
- 2.2 Figure ES-2 Environmentally Superior Project
- Public Participation and Areas of Controversy
- Environmental Impacts and Mitigation Measures
4.1 Introduction
4.2 Air Quality
4.3 Biological Resources
4.4 Cultural Resources
4.5 Geology, Soils, and Paleontology
4.6 Hydrology and Water Quality
- Comparison of Alternatives
- Mitigation Monitoring, Compliance, and Reporting P:rogram
- Impact Summary Tables
A. Introduction/Overview
- A.1 History and Overview of Proposed Project
- A.2 Description of Proposed Project and Alternatives
- A.3 Agency Use of This Document
- A.4 Reader's Guide
-
Figures for Section A: TBP
B. Description
of Proposed Project And Alternatives
B.1 Introduction
B.2 Description of the Proposed Project
B.3 Proposed Project Construction
B.4 Proposed Project Operation and Maintenance Procedures
B.5 Alternatives Overview and Screening
B.6 Description of Project Alternatives Analyzed in this EIR
B.7 No Project Alternative
-
C. Environmental Analysis
D. Comparison
of Alternatives
- D.1 Introduction
- D.2 Comparsion Methodology
- D.3 Environmental Superior "Build" Alternative
D.4 No Project Alternative Compared with the Environmentally Superior
"Build" Scenario
D.5 Detailed Comparisons of Alternatives
-
- E. Other
CEQA Considerations
D.1 Introduction
D.2 Comparison Methodology
D.3 Environmental Superior "Build" Alternative
D.4 No Project Alternative Compared with the Env
F. Mitigation,
Monitoring and Reporting
F.1 Authority for the Mitigation Monitoring, Compliance and Reporting
Program
F.2 Organization of the Final Mitigation Monitoring Plan
F.3 Roles and Responsibilities
F. 4 Enforcement Responsibility
F.5 Mitigation Compliance Responsibility
F.6 Dispute Resolution
F.7 General Monitoring Procedures
F.8 Condition Effectiveness Review
F.9 Mitigation Monitoring Program Tables
G. Public Participation
G.1 Introduction
G.2 Public Participation Program
G.3 Public Review Period
H. Glossary/Abbreviations/List of Preparers
H.1 Glossary
and Abbreviation
H.2 Preparers
of EIR And Their Qualifications
H.3 Draft
EIR Distribution
Appendicies
1. Land Use
Policy Consistency Analysis
Note: Appendices 2 and 3 are only available in hard copy at
the repositories
2. Technology and Environmental Assessment Guide on Underground HV Power
Transmission Year 2000 Update
3. PG&E Co. Information on Underground Transmission Lines
-
-
|