Welcome to the California Public Utilities Commission (CPUC) website for the environmental review of the proposed construction of the San Diego Gas & Electric (SDG&E) Tie-Line (TL) 637 Wood-to-Steel Project located in central San Diego County, near the communities of Ramona and Santa Ysabel, California. An application for this project was submitted to the CPUC on March 13, 2013 (Application A.13-03-003). This site provides access to public documents and information relevant to the California Environmental Quality Act (CEQA) review process. BackgroundSDG&E filed an application for a Permit to Construct the TL 637 Wood-to-Steel Project with the CPUC. The CPUC is the CEQA lead agency for this project. The project proposes to fire-harden approximately 14 miles of the existing 69-kilovolt (kV) wood pole power line (TL 637) between the Creelman and Santa Ysabel Substations. SDG&E’s purpose for the project is to increase fire safety and service reliability of the 69 kV power line in a high fire risk area of San Diego County. As proposed by SDG&E, the project would fire-harden the existing system by replacing the existing 69 kV wood pole structures with new weathering steel poles. Work would also be conducted at the Creelman and Santa Ysabel Substations to allow for the wood-to-steel conversions of TL 637. Further, SDG&E is proposing to install a new SDG&E-owned and operated fiber optic cable between the substations on the new TL 637 steel poles. The proposed project is located in unincorporated San Diego County, between the communities of Ramona and Santa Ysabel, in central San Diego County, California. The location of the proposed project is shown in the Project Location Map. Application and Proponents Environmental AssessmentSDG&E's application and proponent's environmental assessment (PEA) for the TL 637 Wood-to-Steel Project was submitted March 13, 2013, and is available online in the following links:
Data RequestsAs needed during the environmental review process, the Environmental Review Team will provide SDG&E with data requests for specific information during preparation of the CEQA document. These requests and SDG&E’s responses will be published below, as they are available. PEA Completeness Review and Data Request No. 1The CPUC deemed SDG&E’s application complete on May 20, 2013. In addition, the CPUC identified additional data needs to support the environmental review process and provided SDG&E with Data Request No. 1. Click the following links to view the letter deeming the application complete and Data Request No. 1, as well as SDG&E’s response.
Environmental ReviewDraft Initial Study/Mitigated Negative Declaration (IS/MND) PublicationOn October 8, 2013, the CPUC released a Notice of Intent (NOI) to Adopt a MND for the TL 637 Project, showing that the proposed project, as mitigated, would not have any significant effects on the environment. The NOI and Draft IS/MND are available by clicking on the following links: Public Involvement and Comment PeriodThe Draft IS/MND is also available for review at the following libraries:
On October 17, 2013, the CPUC conducted a public meeting regarding the Tie-Line 637 Wood-to-Steel Replacement Project MND. The meeting was held at the Ramona Community Center, located at 434 Aqua Lane, Ramona, California. Click the following links to view the meeting agenda and public meeting presentation. In addition, a copy of the written comment form is available here for download. Comments on the Draft IS/MND will be accepted until 5:00 p.m. on November 7, 2013. Please send comments, with the name and address of an appropriate contact person, to: Lon Payne, CPUC Project Manager Or via email to: TL637woodtosteel@dudek.com (subject line “SDG&E TL637”) Commission DecisionThe CPUC's decision on the project will be published here, when available. Construction Progress and Mitigation MonitoringReports issued by the CPUC, reports on construction progress, and reports issued as part of the Mitigation Monitoring Program will be published here, when available. For Additional InformationThe CPUC, through its Environmental Review Team, is conducting an environmental review of the project. To request additional information or to be added to the mailing list, please contact us by email or phone, as follows:
The CPUC's project manager is:Lon Payne
|