Pre-compliance reports, permit applications, and other documents
(File sizes are large, please be patient as the files download.)
MM BIO-1d Compensatory Mitigation Plan
MM BIO-1d Habitat Restoration Plan
MM BIO-3a Noxious Weeds and Invasive Species Control Plan
MM BIO-4a Dust Control Plan
MM BIO-7j Nesting Bird Management, Monitoring and Reporting Plan
MM BIO-10b Avian Protection Plan
MM HAZ-1b and MM HAZ-4a Health and Safety Program and Safety Assessment
MM FF-1 Construction Fire Prevention Plan
MM FF-2 Wildland Fire Prevention Standard
MM FF-4 Fire Protection Plan
MM HAZ-1a and MM HAZ-1c Hazardous Materials and Waste Management Plan
MM HAZ-2a Sampling and Testing Plan
MM HAZ-3 Lead Sampling Report
MM HYD-1 Linear SWPPP
MM HYD-1 ECO Substation SWPPP
MM-HYD-3 Water Supply Plan
MM-HYD-3 Amended Construction Water Supply Plan
MM HYD-6 Horizontal Directional Drill
Contingency Plan
MM LU-1a Construction Notification Plan
MM NOI-1, MM NOI-4, and MM HAZ-4b Blasting Plan
MM Paleo-1b Paleontological Monitoring & Treatment Plan
MM TRA-1 ECO Substation Traffic Control Plan
MM VIS-3b Construction Lighting Mitigation Plan
MM VIS-3g Surface Treatment Plan
MM VIS-3h Boulevard Substation Landscape Screening Plan
MM VIS-3m Tree Replacement Plan
MM VIS-4a Lighting Mitigation Plan
This page contains tables and is
best viewed with Internet Explorer. Please report any problems to
the Energy Division web
coordinator.
ECO Project Home Page -
CPUC Environmental Information - CPUC Home |