STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

San Diego Gas & Electric East County Substation Project

(Application A.09-08-003)

NOTE: Linked files presented on this page are in PDF format. To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For faster results in displaying the larger files, right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file.

 

Pre-compliance reports, permit applications, and other documents

(File sizes are large, please be patient as the files download.)

MM BIO-3a Noxious Weeds and Invasive Species Control Plan

MM BIO-1d Compensatory Mitigation Plan

MM BIO-4a Dust Control Plan

MM BIO-10b Avian Protection Plan

MM HAZ-1b and MM HAZ-4a Health and Safety Program and Safety Assessment

MM FF-7 Statement of Conformance

MM HAZ-1a and MM HAZ-1c Hazardous Materials and Waste Management Plan

MM HAZ-2a Sampling and Testing Plan

MM HYD-1 Linear SWPPP

MM HYD-1 ECO Substation SWPPP

MM LU-1a Construction Notification Plan

MM NOI-1, MM NOI-4, and MM HAZ-4b Blasting Plan

MM Paleo-1b Paleontological Monitoring & Treatment Plan

MM VIS-3b Construction Lighting Mitigation Plan

MM VIS-3g Surface Treatment Plan

MM VIS-3h Boulevard Substation Landscape Screening Plan

MM VIS-3m Tree Replacement Plan

MM VIS-4a Lighting Mitigation Plan

This page contains tables and is best viewed with Netscape or Internet Explorer. Please report any problems to the Energy Division web coordinator.

Project Home Page - CPUC Environmental Information - CPUC Home