PDF: Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC.

LARGE FILES: Files 3 MB or larger have sizes shown in parentheses. For best results when displaying large files, right-click the link and click "Save Target As". This will download the file to your computer. Browse to the save location and double-click the file to open it in Acrobat.

WEBSITE INFO: This page is best viewed with Mozilla Firefox or Internet Explorer. Please report any problems to the Energy Division web coordinator.

Introduction

Welcome to the California Public Utilities Commission (CPUC) website for the California Environmental Quality Act (CEQA) review of proposed construction of the Mesa 500-kV Substation Project (Mesa Substation Project). On March 13, 2015, SCE filed an application [Application No. A.15-03-003] for a Permit to Construct (PTC) with the CPUC to rebuild and upgrade a portion of its transmission infrastructure primarily within the Western Los Angeles Basin Electrical Needs Area. The majority of work will take place in the City of Monterey Park with some work occurring in nearby cities and portions of unincorporated Los Angeles County. In accordance with CEQA, the CPUC, as the Lead Agency, is preparing an Environmental Impact Report to evaluate the Proposed Project. This site provides access to public documents and information relevant to the CEQA review process.

Quick Links

The CPUC is currently reviewing the Application and Proponent’s Environmental Assessment. Additional Project documentation will be posted as it becomes available.

Project Description

Major components of the Mesa Substation Project include the following: Construction of the Mesa Substation Project is anticipated to begin in April 2016 and would take approximately 4.5 years.

Project Location

The Proposed Project is located in Los Angeles County, California, primarily in the City of Monterey Park where the existing Mesa Substation would be demolished and the new Mesa Substation would be constructed. Other major components will be located within portions of Monterey Park, Montebello, Rosemead, South El Monte, Commerce, Bell Gardens, Pasadena and in portions of unincorporated Los Angeles County. In addition, work within the existing perimeter fencelines at various existing substations includes the following:

For Additional Information

To request additional information or to be added to the mailing list, please contact us by email, fax, or phone, as follows:

Project email: Mesa.CPUC@ene.com
Project fax: 415-398-5326
Project voicemail: (844) 538-6992 (toll free)

The CPUC’s Project Manager is:

Lisa Orsaba, CPUC Project Manager
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CA 94102
Email: Lisa.Orsaba@cpuc.ca.gov
Tel.: (415) 703-1966