Introduction

Welcome to the California Public Utilities Commission (CPUC) website for the environmental review of proposed Sanger Substation Expansion Project. The proposed project will expand Pacific Gas & Electric’s (PG&E) existing Sanger Substation to accommodate a new breaker-and-a-half (BAAH) bus configuration. The substation is located southeast of the City of Fresno in unincorporated Fresno County, at the northwest corner of the intersection of East Jensen Avenue and South McCall Avenue. The application for the Permit to Construct (PTC) was submitted on September 30, 2015 (A. 15-09-012). This site provides access to public documents and information relevant to the CEQA review process. Additional project information and documentation will be posted as it becomes available.

Project Description

Sanger Substation, which was built in 1920, is integral to the Central Valley 115 kV transmission system because it serves as a strategic hub for routing Fresno’s hydro- and natural gas-generated electricity to the Manchester, Barton, Airways, California, Malaga, McCall, and Reedley substations. Sanger Substation’s twelve 115 kV power lines have the capacity to carry approximately 200 MW of generation annually, providing a critical energy path between Fresno metropolitan north and south areas. Sanger Substation will be expanded onto approximately 7 acres adjacent to and generally north and west of the existing substation.

Major components of the Sanger Substation Expansion Project include the following:

Project Location

The proposed project is located in unincorporated Fresno County, approximately 2 miles west of Sanger, California and approximately 3 miles southeast of Fresno. The existing Sanger Substation occupies an approximately 4.5-acre parcel at the northwest corner of East Jensen Avenue and South McCall Avenue. The expansion would cover approximately 7-acres adjacent to and generally north and west of the existing substation. The surrounding area is predominately agriculture and the existing substation is surrounded by vineyards and row crops. The closest rural residence is 200 feet north of the proposed expanded substation.

Application and Proponent’s Environmental Assessment

PG&E filed an application (A.15-09-012) for a PTC and Proponent’s Environmental Assessment (PEA) on September 30, 2015. The PEA provides information to begin the independent environmental review process conducted by the CPUC.

Deficiencies, Data Requests, and Responses

The CPUC is currently reviewing the application and PEA to identify additional data needed from the Applicant to complete the environmental review process. The CPUC submitted data requests to the applicant for specific information to support the environmental review process. Those requests and the Applicant’s responses are included below.

CPUC Report/Request PG&E’s Response Attachments
Deficiency Report No. 1
(Submitted 10/30/2015)
Deficiency Response No. 1
(Received 11/30/2015)
Attachments A to F
(Received 11/30/2015)
Deficiency Report No. 2
(Submitted 12/11/2015)
Deficiency Response No. 2
(Received 01/07/2016)
Attachments A to C
(Received 01/07/2016)
PEA Completeness Letter
(Submitted 01/26/2016)
   
Data Request No. 1
(Submitted 02/04/2016)
Applicant’s Response to Data Request #1 (Received 03/04/2016)

Additional Applicant Response to Data Request #1
Attachment A – Revised Visual Simulation VP7
Attachment B – EDR Radius Map Report with GeoCheck
Attachment C – California Environmental Reporting System (CERS) Submittal Summary
Attachment D – Spill Prevention Control and Countermeasure (SPCC) Plan
Attachment E – Revised Table 3.16-3: Estimated Truck Trips
Data Request No. 2
(Submitted 04/15/2016)
Applicant’s Response to Data Request #2
(Received 04/29/2016)
Attachment A – General Arrangement Illustration

Additional Information

Additional information will be posted as it becomes available. The CPUC, through its Environmental Review Team, in conducting an environmental review of the project. To request additional information, ask a question, or be added to the project mailing list, please contact:

Voicemail: 1 (844) 433-2844 (toll free)
Fax: (415) 396-5326
U.S. Mail or Courier: Billie Blanchard
California Public Utilities Commission
c/o Environment and Ecology Inc.
505 Sansome Street Suite 300
San Francisco, CA 94111
Email: Sanger.CPUC@ene.com