CPUC Seal

PDF: Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC.

LARGE FILES: Files 3 MB or larger have sizes shown in parentheses. For best results when displaying large files, right-click the link and click "Save Target As". This will download the file to your computer. Browse to the save location and double-click the file to open it in Acrobat.

WEBSITE INFO: This page is best viewed with Mozilla Firefox or Internet Explorer. Please report any problems to the Energy Division web coordinator.

Introduction

Welcome to the California Public Utilities Commission (CPUC) website for the California Environmental Quality Act (CEQA) review of proposed construction of the Southern California Edison Company (SCE) Santa Barbara County Reliability Project (SBCRP or proposed project). SCE filed an application [Application No. A.12-10-018] for a Permit to Construct (PTC) with the CPUC to rebuild and upgrade a portion of its transmission infrastructure in Santa Barbara and Ventura Counties between the City of San BuenaVentura (Ventura) and the City of Carpinteria. In accordance with CEQA, the CPUC, as the Lead Agency, is preparing an environmental review document to evaluate the proposed project. This site provides access to public documents and information relevant to the CEQA review process.

Background

In 1998, SCE determined the need to increase reliability by reinforcing its existing 66 kilovolt (kV) subtransmission system in northwestern Ventura County and southeastern Santa Barbara County to meet customer electrical demand within the electrical needs area (ENA) during emergency conditions while also enhancing operational flexibility. The ENA includes the cities of Goleta, Carpinteria, and Santa Barbara, and adjacent areas of unincorporated southern Santa Barbara County (Figure 1-1). Customers in northwest Ventura County would also benefit from the modernized facilities.

SCE commenced construction activities within the proposed project area in 1999 under the assumption that the construction activities were exempt from permitting pursuant to CPUC General Order 131-D and the California Coastal Act (California Public Resources Code § 30000 et seq.). Between 1999 and 2004, the following construction activities occurred:

  1. Some substation modifications were completed at the Carpinteria, Goleta, Isla Vista, Ortega, and Santa Clara Substations;
  2. New subtransmission structures and 66 kV conductor were installed in Segment 1 from Santa Clara Substation to Casitas Substation, and the existing 66 kV conductor was removed;
  3. New subtransmission structures and 66 kV conductor were installed in Segment 2 from Casitas Substation to the ‘Y’ (the point along the corridor where Segments 2, 3B, and 4 converge) located near Casitas Pass just west of Lake Casitas in Ventura County, and the existing 66 kV conductor was removed;
  4. New subtransmission structures and 66 kV conductor were installed in Segment 3A from Carpinteria Substation to the Santa Barbara/Ventura County line, and existing wood subtransmission structures were removed or topped;
  5. Subtransmission structures in Segments 1 and 2 were partially removed; and
  6. Two footings for tubular steel poles (TSPs), two lightweight steel (LWS) H-frames, one LWS pole, and two switches at the Getty Tap location were installed, and two wood H-frames and one wood pole were removed.

In 2004, Coastal Commission staff determined that these construction activities did not qualify for an Exemption from a Local Coastal Development Permit (CDP) and construction ceased. In 2012, SCE submitted an application to the CPUC for a permit to construct the SBCRP in order to complete the previous construction activities and to the Coastal Commission to obtain a CDP for the required portions of the proposed project.

Project Description

Major components of the proposed SBCRP would include:

  1. Reconstructing existing 66 kV subtransmission facilities within existing and new utility rights-of-way between the existing Santa Clara Substation in Ventura County and the existing Carpinteria Substation located in the City of Carpinteria in Santa Barbara County (Segments 4 and 3B);
  2. Modifying subtransmission, substation, and/or telecommunications equipment within the existing Carpinteria, Casitas, Getty, Goleta, Ortega, Santa Barbara, Santa Clara, and Ventura Substations; and
  3. Installing fiber optic telecommunications equipment for the protection, monitoring and control of subtransmission and substation equipment along Segments 1,2, and 4 and at Carpinteria, Casitas, Santa Clara, and Ventura Substations.

The proposed project components have been divided into discrete geographic segments to facilitate discussions.

Segment 1:
Spans from Santa Clara Substation in the east to Casitas Substation in the west.
Segment 2:
Spans from Casitas Substation in the east to the ‘Y’ in the west.
Segment 3A:
Spans from Carpinteria Substation in the west to the Santa Barbara County/Ventura County border in the east.
Segment 3B:
Spans from the Santa Barbara County/Ventura County border in the west to the ‘Y’ in the east.
Segment 4:
Spans from the ‘Y’ in the east to Carpinteria Substation in the west.
Segment 5:
Spans between Segment 3B and Segment 4. Conductor and tower removal only.
Getty Tap:
The ‘Getty Tap’ is located approximately in the middle of Segment 1.

Construction of the SBCRP would take approximately 2 years.

Figure 1-1: Regional Location and Electrical Needs Area of the Proposed Project shows an overview of the proposed project route and the ENA.

Application and Proponent’s Environmental Assessment (PEA)

The application and PEA for the SBCRP may be viewed here.

Deficiency and Completeness Letters

Deficiency Letter #1 (November 19, 2012)

Deficiency Letter #2 (January 11, 2013)

Application Deemed Complete Letter (March 4, 2013)

SCE Responses to Deficiency Letters

SCE Response to Deficiency Letter #1 (December 21, 2012)

SCE Response to Deficiency Letter #2 (February 11, 2013)

SCE Response to Deficiency Letter #2 – Cumulative (February 22, 2013)

Public Scoping and Notice of Preparation of an Environmental Impact Report

The CPUC published a Notice of Preparation (NOP) of an Environmental Impact Report (EIR) or Initial Study/Mitigated Negative Declaration (IS/MND) for the proposed project to the State Clearinghouse, responsible and trustee agencies, other agencies, tribes, elected officials, organizations, owners and occupants of contiguous properties, residents, and other interested parties on April 23, 2013. The circulated NOP opened a 30-day public comment period on the scope and content of the document from April 23, 2013 to May 23, 2013. The CPUC’s Energy Division conducted a public scoping meeting for the proposed project on May 7, 2013 at the Carpinteria City Hall Council Chambers (5775 Carpinteria Avenue in Carpinteria, California) to provide interested parties the opportunity to learn more about the proposed project, ask questions, and submit comments.

The public review and comment period for the NOP ended at 5:00 pm, May 23, 2013. A summary of the scoping process and comments received during the scoping period is included in the final Scoping Report, which is available here.

Environmental Impact Report

Draft EIR

As the CEQA Lead Agency, the CPUC prepared a Draft EIR for the proposed project in accordance with CEQA. The Notice of Availability (NOA) and the Draft EIR may be viewed here.

Hardcopies of the Draft EIR are also available at the following repositories:

Final EIR

Following the 45-day public review period and public meeting for the Draft EIR (see below), the CPUC will then prepare a Final EIR that will include and respond to comments received on the Draft EIR. When completed, the Final EIR will be posted here as well as the repositories listed above.

Public Review and Public Meeting

The CPUC will receive comments on the Draft EIR for a 45-day period starting September 26, 2014, and ending November 12, 2014. Written comments on the Draft EIR may be submitted using any of the following methods:

Email: SBCRP.CPUC@ene.com
Fax: 415-398-5326
Mail: Santa Barbara County Reliability Project
        c/o Ecology and Environment, Inc.
        505 Sansome Street, Suite 300
        San Francisco, CA 94111

The CPUC will hold a public meeting to explain the proposed project, discuss the proposed project’s significant impacts, and receive comments on the Draft EIR from the public. Information regarding the public meeting is provided below:

October 29, 2014
6:00pm to 8:00pm
Carpinteria City Hall
5775 Carpinteria Ave.
Carpinteria, CA 93013

For Additional Information

To request additional information or to be added to the mailing list, please contact us by email, fax, or phone, as follows:

Project email: SBCRP.CPUC@ene.com
Project fax: 415-398-5326
Project voicemail: (855) 894-8054 (toll free)

The CPUC’s Project Manager is:

Jensen Uchida, CPUC Project Manager
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CA 94102
Email: Jensen.Uchida@cpuc.ca.gov
Tel.: (415) 703-5484