CPUC Seal  

STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

PacifiCorp’s Morrison Creek Substation Project

(Application A.07-07-018, filed July 20, 2007)

 

Draft Initial Study / Mitigated Negative Declaration

acrobat

Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC.
Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB), right-click the file's link, click "Save Target As" to download
the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat.

 

Full Document (25.1mb)

Cover

Table of Contents

Executive Summary

1. Project Description (11.6mb)

2. Environmental Checklist and Discussion

  2.1 Aesthetics (11.6mb)
2.2 Agricultural Resources
2.3 Air Quality
2.4 Biological Resources
2.5 Cultural Resources
2.6 Geology, Soils, and Seismicity
2.7 Hazards and Hazardous Materials
2.8 Hydrology and Water Quality
2.9 Land Use and Planning
2.10 Mineral Resources
2.11 Noise
2.12 Population and Housing
2.13 Public Services
2.14 Recreation
2.15 Transportation and Traffic
2.16 Utilities and Service Systems
2.17 Mandatory Findings of Significance
 

3. Environmental Determination

4. Report Preparers

5. Mitigation Monitoring, Reporting, and Compliance Program

Appendices

A. Electric and Magnetic Fields

B. Construction Emission Estimates

C. Biological Resources - Special Status Species

D. Certificate of Service and Distribution List

website information

This page contains tables and is best viewed with Firefox or Internet Explorer.
Please report any problems to the Energy Division web coordinator.

   
   
 

Project Home Page - CPUC Environmental Information - CPUC Home - Top