ES-1 |
Project Location (657K) |
ES-2 |
Conceptual Cross-Section of Lodi Gas Storage Field (17K) |
ES-3 |
Project and Alternative Locations (2.7MB) |
2-1 |
Project Location (657K ) |
2-2 |
Field Map (4.6MB) |
2-3 |
3D Rendering of Well Pad with Well Heads and Piping (4.5MB) |
2-4 |
Typical Gas Injection/Withdrawal Well (1.2MB) |
2-5 |
Separation Facility Plot Plan (668K) |
2-6 |
Photographs of Typical Separation Facility Equipment
(2.3MB) |
2-7 |
Photographs of Typical Separation Facility Equipment
(3.5MB) |
2-8 |
Compressor Facility Site Plan (972K) |
2-9a |
Proposed Project (2.8MB) |
2-9b |
Proposed Project (2MB) |
2-9c |
Proposed Project (2.5MB) |
2-10 |
Typical Urban Construction Spread for Transmission Pipeline
Installation (1000K) |
2-11 |
Typical Rural Construction Spread for Transmission Pipeline
Installation (965K) |
2-12a |
Public Right-of-Way Route Alternative (3.2MB) |
2-12b |
Public Right-of-Way Route Alternative (2MB) |
2-12c |
Public Right-of-Way Route Alternative (2.7MB) |
2-13 |
Alternate Compressor Facility Site Plan (1MB) |
2-14a |
Existing Pipeline Corridor Alternative (3.4MB) |
2-14b |
Existing Pipeline Corridor Alternative (2.2MB) |
2-14c |
Existing Pipeline Corridor Alternative (2.7MB) |
2-15a |
Composite Route Alternative (3.5MB) |
2-15b |
Composite Route Alternative (1.7MB) |
2-15c |
Composite Route Alternative (3MB) |
3.3-1 |
Generalize Geologic Section and View of the Central Valley
(1.7MB) |
3.3-2 |
Valley Geologic Structure (1.2MB) |
3.3-3 |
Surficial Geologic Deposits (8.1MB) |
3.3-4 |
General Fault Activity Map (3MB) |
3.4-1 |
Flood Zones Section 1 of 3 (4.4MB) |
3.4-2 |
Flood Zones Section 2 of 3 (4MB) |
3.4-3 |
Flood Zones Section 3 of 3 (3.9MB) |
3.8-1 |
Energy and Mineral Resources (2.2MB) |
3.10-1 |
Additional Sound Measurement Locations (245K) |
3.12-1 |
Photo Simulation (5.5MB) |
3.12-2 |
Photo Simulation (6.1MB) |
3.12-3 |
Photo Simulation (5.7MB) |