STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Lodi Gas Storage Project
Environmental Review

List of Figures
The figures listed below are numbered and correspond to the appropriate section of the document.

These files are in PDF format. If you don't yet have a version of Acrobat Reader
installed on your system, please go to the Adobe site to download Acrobat Reader 4.0.
Also, users of Microsoft's IE will want to download Acrobat Reader 4.0
in order to use all the features of these files.

ES-1 Project Location (657K)
ES-2 Conceptual Cross-Section of Lodi Gas Storage Field (17K)
ES-3 Project and Alternative Locations (2.7MB)
2-1 Project Location (657K )
2-2 Field Map (4.6MB)
2-3 3D Rendering of Well Pad with Well Heads and Piping (4.5MB)
2-4 Typical Gas Injection/Withdrawal Well (1.2MB)
2-5 Separation Facility Plot Plan (668K)
2-6 Photographs of Typical Separation Facility Equipment (2.3MB)
2-7 Photographs of Typical Separation Facility Equipment (3.5MB)
2-8 Compressor Facility Site Plan (972K)
2-9a Proposed Project (2.8MB)
2-9b Proposed Project (2MB)
2-9c Proposed Project (2.5MB)
2-10 Typical Urban Construction Spread for Transmission Pipeline Installation (1000K)
2-11 Typical Rural Construction Spread for Transmission Pipeline Installation (965K)
2-12a Public Right-of-Way Route Alternative (3.2MB)
2-12b Public Right-of-Way Route Alternative (2MB)
2-12c Public Right-of-Way Route Alternative (2.7MB)
2-13 Alternate Compressor Facility Site Plan (1MB)
2-14a Existing Pipeline Corridor Alternative (3.4MB)
2-14b Existing Pipeline Corridor Alternative (2.2MB)
2-14c Existing Pipeline Corridor Alternative (2.7MB)
2-15a Composite Route Alternative (3.5MB)
2-15b Composite Route Alternative (1.7MB)
2-15c Composite Route Alternative (3MB)
3.3-1 Generalize Geologic Section and View of the Central Valley (1.7MB)
3.3-2 Valley Geologic Structure (1.2MB)
3.3-3 Surficial Geologic Deposits (8.1MB)
3.3-4 General Fault Activity Map (3MB)
3.4-1 Flood Zones Section 1 of 3 (4.4MB)
3.4-2 Flood Zones Section 2 of 3 (4MB)
3.4-3 Flood Zones Section 3 of 3 (3.9MB)
3.8-1 Energy and Mineral Resources (2.2MB)
3.10-1 Additional Sound Measurement Locations (245K)
3.12-1 Photo Simulation (5.5MB)
3.12-2 Photo Simulation (6.1MB)
3.12-3 Photo Simulation (5.7MB)
  