STATE
OF
CALIFORNIA PUC > Energy > California Environmental Quality Act > Current Projects Pacific Gas & ElectricFulton-Fitch Mountain Reconductoring Project(Application No. A.15-12-005)Last Update: August 8, 2016 NOTE: Linked files presented on this page are in PDF format. To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For faster results in displaying the larger files, right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file. |
Welcome to the California Public Utilities Commission (CPUC) website for the California Environmental Quality Act (CEQA) review of Pacific Gas and Electric Company’s (PG&E’s) proposed Fulton-Fitch Mountain Reconductoring Project (project). PG&E submitted an application to the CPUC for a Permit to Construct (PTC) for the project on December 3, 2015. This site provides access to public documents and information relevant to the CEQA environmental review process. QUICK LINKSProponent's
Environmental
Assessment Public Meetings, Questions, and Comments BackgroundPG&E proposes to reinforce the electric transmission system in central Sonoma County by replacing the conductor on a 9.9-mile-long section of the Fulton-Hopland 60 kV Power Line (Fulton-Hopland line) between the Fulton Substation and Fitch Mountain Substation. The project would include replacing poles along 8.1 miles of the Fulton-Hopland line, replacing conductor on 1.3 miles of the Geysers #12-Fulton 230 kV Transmission Line (Geysers #12-Fulton line), and making modifications to Fitch Mountain Substation.The proposed project is subject to CEQA review because the CPUC has been presented with a discretionary action to approve or deny PG&E’s PTC application. Before making a decision about PG&E’s application, the CPUC is required to analyze potential environmental impacts associated with the project and present the findings in an environmental document for public review and comment. This website provides access to public documents and information relevant to the CEQA review process. Project OverviewThe 9.9-mile-long project alignment is comprised of the Southern Segment (1.8 miles), Northern Segment (8.1 miles), and Fitch Mountain Substation. Proposed project components at each location are summarized as follows:
Application and Proponent's Environmental
Assessment
|
CPUC
Deficiency Report
|
PG&E
Response and Status
|
Deficiency
Report #1
(December 23, 2015) |
Response #1 (January 22, 2016)* Table of Responses #1 Attachment PD-08: Revised Typical Structure Drawings Attachment AQ/GHG-01: Air Quality and Greenhouse Gas Calculations Attachment HHM-01: EDR Report Attachment LUP-01: New Affected Properties Spreadsheet Response #1A (January 25, 2016)* Letter #1A Attachment PD-06: Detailed Workspaces and Facility Locations (Confidential) Attachment PD-07: Structure Locations, Details, and Unique IDs (Confidential) Attachment PD-09: Substation Modifications (Confidential) Attachment PD-11: Staging Areas (Confidential) Attachment PD-12: Access Roads and Footpaths (Confidential) Attachment PD-14: Vegetation Clearance (Confidential) Attachment BR-01: Wetland Delineation Report (Confidential) Attachment BR-02: Biological Survey Reports (Confidential) Attachment C/PR-01: Cultural Resources Report (Confidential) Attachment C/PR-02: Paleontological Report (Confidential) Response #1B (January 29, 2016) Letter #1B Attachment: Detailed Map Book (Confidential) Attachment: Existing General Arrangement Plans (Confidential) Response #1C (February 5, 2016) Email #1C Attachment: Project Map Response #1D (February 26, 2016) Attachment: Detailed Project Map Response #1E (July 8, 2016) Letter #1E Attachment: Cultural Survey Memo (Confidential) Attachment: Biology Addendum (Confidential) |
Response #1 (March 18, 2016) Table of Responses #1 Response #2 (April 1, 2016) Attachment: Preliminary Helicopter Use Plan Response #3 (April 22, 2016) Attachment: DRAFT Delineation of Waters of the United States (Confidential) |
|
Response
#1 (April 26, 2016)
Letter #1 |
CPUC
Data Needs
|
PG&E
Response and Status
|
Response #1 (July 8, 2016)
Table of Responses #1 Summary of Project Emissions: Air Quality, Greenhouse Gas Helicopter Emissions Calculations: Air Quality, Greenhouse Gas SF6-Insulated Breaker Emissions: Greenhouse Gas Construction Equipment List |
Date/Time |
Location | Description |
Meeting
Materials |
Wednesday,
August 24, 2016 6:30 PM - 8:00 PM |
Windsor Community Center 9291 Old Redwood Highway, Building 200 Windsor, CA 95492 |
The
CPUC, as lead agency under the California Environmental Quality Act
(CEQA), will hold an informational meeting for the public, to describe
PG&E’s proposed project and the CEQA process. |
Meeting Notice Fact Sheet |
Fax
(650) 373 - 1211
CPUC Project Manager
Mailing Address
Lisa Orsaba
California Public Utilities Commission
505 Van Ness Ave, 4th Floor
San Francisco CA , 94102Formal Comment
Mailing Addressc/o Panorama Environmental, Inc.
1 Embarcadero Center, Suite 740
San Francisco, CA, 94111
Related
Links:
|
|