CALIFORNIA PUC > Energy > California Environmental Quality Act > Current Projects Pacific Gas and Electric CompanyFulton-Fitch Mountain Reconductoring Project(Application No. A.15-12-005)Last Update: July 31, 2017 NOTE: Linked files presented on this page are in PDF format. To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For faster results in displaying the larger files, right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file. |
Welcome to the California Public Utilities Commission (CPUC) website for the California Environmental Quality Act (CEQA) review of Pacific Gas and Electric Company’s (PG&E’s) proposed Fulton-Fitch Mountain Reconductoring Project (proposed project). PG&E submitted an application to the CPUC for a Permit to Construct (PTC) for the project on December 3, 2015. This site provides access to public documents and information relevant to the CEQA environmental review process. QUICK LINKSProponent's
Environmental
Assessment Environmental ReviewDraft Initial Study/Mitigated Negative Declaration Publication (*NEW*)On July 21, 2017, the CPUC released a Notice of Intent (NOI) to adopt a Mitigated Negative Declaration (MND) for the Fulton-Fitch Mountain Reconductoring Project based on the findings of an Initial Study (IS) that was prepared pursuant to California Public Resources Code § 21000 et seq. The Draft IS/MND shows that all project-related environmental impacts could be reduced to a less-than-significant level with the incorporation of minor revisions to the proposed project and feasible mitigation measures, which PG&E has agreed to implement should CPUC approve the project. The NOI and Draft IS/MND are available by clicking on the following links: Public and Agency CommentsThe Draft IS/MND is being circulated for a 30-day public review period, July 21, 2017 through August 21, 2017. The public may submit comments and concerns regarding the proposed project and the adequacy of the Draft IS/MND. Written comments on the Draft IS/MND must be postmarked or received by fax or email no later than August 21, 2017. Comments submitted during the formal comment period will be addressed in the Final IS/MND, as required by CEQA. The CPUC will not consider anonymous comments. Individual respondents may request confidentiality. If you wish to withhold your name or street address from public review, you must state this prominently at the beginning of your written comment. Such requests will be honored to the extent allowed by law. All submissions from organizations and businesses, and from individuals identifying themselves as representatives or officials of organizations or businesses, will be publicly disclosed in their entirety. Written comments on the Draft IS/MND should be submitted by U.S. mail, fax, or email to:
California Public
Utilities Commission
Attn: Fulton-Fitch Mountain Reconductoring Project c/o Panorama Environmental, Inc. One Embarcadero Center, Suite 740 San Francisco, CA 94111 Fax: (650) 373-1211 Email: fulton2fitch@panoramaenv.com
BackgroundPG&E proposes to reinforce the electric transmission system in central Sonoma County by replacing the conductor on a 9.8-mile-long section of the Fulton-Hopland 60-kV Power Line (Fulton-Hopland line) between the Fulton Substation and Fitch Mountain Substation. The project would include replacing poles along 8 miles of the Fulton-Hopland line, replacing conductor on 1.4 miles of the Geysers #12-Fulton 230-kV Transmission Line (one of two circuits), and making modifications to Fitch Mountain Substation.The proposed project is subject to CEQA review because the CPUC has been presented with a discretionary action to approve or deny PG&E’s PTC application. Before making a decision about PG&E’s application, the CPUC is required to analyze potential environmental impacts associated with the proposed project and present the findings in an environmental document for public review and comment. This website provides access to public documents and information relevant to the CEQA review process. Project OverviewThe 9.8-mile-long project alignment is comprised of the Southern Segment, Northern Segment, and Fitch Mountain Substation. Proposed actions at each location are summarized as follows:
Application and Proponent's
Environmental
Assessment
|
CPUC
Deficiency Report
|
PG&E
Response and Status
|
Deficiency
Report #1
(December 23, 2015) |
Response #1 (January 22, 2016) Table of Responses #1 Attachment: Revised Typical Structure Drawings Attachment: Air Quality and Greenhouse Gas Calculations Attachment: EDR Report Attachment: New Affected Properties Spreadsheet Response #1A (January 25, 2016) Letter #1A Attachment: Biological Resources Technical Report (GANDA 2012) (Confidentiality Withdrawn) Attachment: Addendum #1 to the Biological Resources Technical Report (TRC 2015) (Confidentiality Withdrawn) Attachment: Raptor Survey (TRC 2015) (Confidentiality Withdrawn) Attachment: Bat Survey (TRC 2015) (Confidentiality Withdrawn) Attachment: Wetland Delineation Report (TRC 2015) (Confidentiality Withdrawn) Attachment: Water Crossing Mapping (GANDA 2016) (Confidentiality Withdrawn) Attachment: Paleontological Report (TRC 2015) (Confidentiality Withdrawn) Attachment: GIS data for project elements, biological resources, and wetland and water resources (Confidential) Response #1B (January 29, 2016) Letter #1B Attachment: Detailed Map Book (Confidentiality Withdrawn) Attachment: Existing General Arrangement Plans (Confidentiality Withdrawn) Attachment: GIS data for project elements, biological resources, and wetland and water resources (Confidential) Response #1C (February 5, 2016) Email #1C Attachment: Project Map Response #1D (February 26, 2016) Attachment: Detailed Project Map Response #1E (July 8, 2016) Letter #1E Attachment: Cultural Survey Memo (TRC 2016) (Confidential) Attachment: Addendum #2 to the Biological Resources Technical Report (TRC 2016) (Confidentiality Withdrawn) |
Response #1 (March 18, 2016) Table of Responses #1 Attachment: GIS data for alternate workspaces and access routes (Confidential) Response #2 (April 1, 2016) Attachment: Preliminary Helicopter Use Plan Response #3 (April 22, 2016) Attachment: Revised DRAFT Wetland Delineation Report (TRC 2016) (Confidentiality Withdrawn) |
|
Response
#1 (April 26, 2016)
Letter #1 Attachment: Cultural Memo RE P-49-001179 and APM CR-1 (Confidential Information Redacted) |
|
Response
(August 23, 2016)
Letter #1 (Note: Materials where PG&E withdrew claims of confidentiality under PUC Section 583 are marked above) |
CPUC
Data Needs
|
PG&E
Response and Status
|
Response #1 (July 8, 2016)
Table of Responses #1 Summary of Project Emissions: Air Quality, Greenhouse Gas Helicopter Emissions Calculations: Air Quality, Greenhouse Gas SF6-Insulated Breaker Emissions: Greenhouse Gas Construction Equipment List |
|
Response #1 (October 12, 2016)
Table of Responses #1 Attachment: Control Building Draft Sketch Attachment: Preliminary Construction Plan for PS-6 Attachment: Calculations and CalEEMod Files (TRC 2016) Attachment: Maps from Addendum #2 to Biological Resources Technical Report (TRC 2016) Attachment: Special-Status Plant Survey Memo (GANDA 2016) Attachment: FAA Expired Determinations Attachment: Updates to the Revised Wetland Delineation Report (TRC 2016) Attachment: PG&E Windsor Substation Project Location Map Response #2 (October 17, 2016) Attachment: GIS data for project elements, biological resources, and wetland and water resources (Confidential) |
|
Response #1 (December 2, 2016)
Table of Responses #1 Response #2 (December 23, 2016) Attachment: Updated GIS data (Confidential) Response #3 (January 13, 2017) Attachment: Addendum #3 to the Biological Resources Technical Report (TRC 2016) |
|
Response #1 (April 6, 2017)
Table of Responses #1 Response #2 (April 11, 2017) Attachment: Additional Cultural Resources Survey Report (Confidential) Response #3 (May 30, 2017) Attachment: GIS data for project elements, biological resources, cultural resources, and wetland and water resources (Confidential) Response #4 (May 31, 2017) Attachment: Biological Reconnaissance Survey for Work Areas (TRC 2017) Attachment: Memo regarding SW3 at Pole 62 (TRC 2017) Attachment: Memo regarding Aquatic Resources Assessment (GANDA 2017) |
Fax
(650) 373 - 1211
CPUC Project Manager
Mailing Address
Lisa Orsaba
California Public Utilities Commission
505 Van Ness Ave, 4th Floor
San Francisco CA, 94102Formal Comment
Mailing AddressCalifornia Public Utilities Commission
Attn: Fulton-Fitch Mountain
c/o Panorama Environmental, Inc.
1 Embarcadero Center, Suite 740
San Francisco, CA, 94111