CALIFORNIA PUC > Energy > California Environmental Quality Act > Current Projects Pacific Gas and Electric CompanyFulton-Fitch Mountain Reconductoring Project(Application No. A.15-12-005)Last Update: August 14, 2018 NOTE: Linked files presented on this page are in PDF format. To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For faster results in displaying the larger files, right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file. |
Welcome to the California Public Utilities
Commission (CPUC) website for the California Environmental Quality Act
(CEQA) review of Pacific Gas and Electric Company’s
(PG&E’s) Fulton-Fitch Mountain Reconductoring Project
(project). This site provides access to
public documents and information relevant to the CEQA environmental
review process. On December 3, 2015, PG&E submitted an application (A.15-12-005) to the CPUC for a Permit to Construct (PTC) the project. On December 14, 2017, the CPUC issued its Decision (D.17-12-012) to approve the project and grant PG&E a PTC. Information about the CPUC’s proceedings for the project are available here. Construction of the project began in June 2018 and is expected to continue until May 2019. QUICK LINKSMitigation Monitoring, Compliance, and Reporting Plan Construction and Mitigation Monitoring Proponent's
Environmental
Assessment Mitigation Monitoring, Compliance, and Reporting PlanA Mitigation Monitoring, Compliance, and Reporting Plan (MMCRP) was prepared by the CPUC to ensure compliance with applicant proposed measures and mitigation measures approved in the Final Initial Study/Mitigated Negative Declaration (IS/MND). The MMCRP provides guidelines and standardizes procedures for environmental compliance during project implementation. The procedures define the reporting relationships, the roles and responsibilities of the project's environmental compliance team members, compliance reporting procedures, and the communication protocol. The final MMCRP is available below.MMCRP Appendix A - Project Detail Maps Appendix B - Final Applicant Proposed Measures and Mitigation Measures Appendix C - Summary Tracking Tables Appendix D - Project Personnel and Contact Information (Confidential) Appendix E - Forms Construction and Mitigation MonitoringMitigation PlansMitigation plans that have been reviewed and approved by the CPUC can be viewed here. Notices to Proceed Notice to Proceed (NTP) requests and approvals are provided below.
Minor Project Refinements The CPUC reviews PG&E’s requests for Minor Project Refinements (MPRs) in accordance with the process outlined in the MMCRP. MPR requests and approvals are provided below.
Environmental ReviewPetition for ModificationOn June 29, 2018, PG&E submitted a Petition for Modification (PFM) to the CPUC requesting changes to the approved project, including replacing an additional 21 TSPs in the Southern Segment between Fulton Substation and Shiloh Ranch Regional Park. A copy of the PFM request is available here. PG&E's PFM is under review. Final Initial Study/Mitigated Negative Declaration Comments on the Draft IS/MND were submitted to the CPUC during the public review period ending on August 21, 2017. The CPUC’s responses to the comments received are presented in Chapter 5 of the Final IS/MND. The Final IS/MND was published on October 11, 2017. The conclusions of the Draft IS/MND remain unchanged in the Final IS/MND; the proposed project would not have a significant effect on the environment. The Final IS/MND can be viewed here. On December 14, 2017, the CPUC issued its Decision (D.17-12-012) to approve the project and grant PG&E a PTC. Information about the CPUC’s proceedings for the project is available here. Draft Initial Study/Mitigated Negative Declaration On July 21, 2017, the CPUC released a Notice of Intent (NOI) to adopt a Mitigated Negative Declaration (MND) for the proposed project based on the findings of an Initial Study (IS) that was prepared pursuant to California Public Resources Code § 21000 et seq. The Draft IS/MND shows that all project-related environmental impacts could be reduced to a less-than-significant level with the incorporation of minor revisions to the proposed project and feasible mitigation measures, which PG&E has agreed to implement should CPUC approve the project. The Draft Initial Study/Mitigated Negative Declaration (IS/MND) was circulated for a 30-day public review period. The comment period closed on August 21, 2017. The NOI and Draft IS/MND are available by clicking on the following links: BackgroundPG&E proposes to reinforce the electric transmission system in central Sonoma County by replacing the conductor on a 9.9-mile-long section of the Fulton-Hopland 60-kV Power Line (Fulton-Hopland line) between the Fulton Substation and Fitch Mountain Substation. The project includes replacing poles and conductor along the Fulton-Hopland line and making modifications to Fitch Mountain Substation.The project is subject to CEQA review because the CPUC has been presented with a discretionary action to approve or deny PG&E’s PTC application. The CPUC is required to analyze potential environmental impacts associated with the project and present the findings in an environmental document for public review and comment. This website provides access to public documents and information relevant to the CEQA review process. Project OverviewThe 9.9-mile-long project alignment is comprised of the Southern Segment, Northern Segment, and Fitch Mountain Substation. Proposed actions at each location are summarized as follows:
Application and Proponent's
Environmental
Assessment
|
CPUC
Deficiency Report
|
PG&E
Response and Status
|
Deficiency
Report #1
(December 23, 2015) |
Response #1 (January 22, 2016) Table of Responses #1 Attachment: Revised Typical Structure Drawings Attachment: Air Quality and Greenhouse Gas Calculations Attachment: EDR Report Attachment: New Affected Properties Spreadsheet Response #1A (January 25, 2016) Letter #1A Attachment: Biological Resources Technical Report (GANDA 2012) (Confidentiality Withdrawn) Attachment: Addendum #1 to the Biological Resources Technical Report (TRC 2015) (Confidentiality Withdrawn) Attachment: Raptor Survey (TRC 2015) (Confidentiality Withdrawn) Attachment: Bat Survey (TRC 2015) (Confidentiality Withdrawn) Attachment: Wetland Delineation Report (TRC 2015) (Confidentiality Withdrawn) Attachment: Water Crossing Mapping (GANDA 2016) (Confidentiality Withdrawn) Attachment: Paleontological Report (TRC 2015) (Confidentiality Withdrawn) Attachment: GIS data for project elements, biological resources, and wetland and water resources (Confidential) Response #1B (January 29, 2016) Letter #1B Attachment: Detailed Map Book (Confidentiality Withdrawn) Attachment: Existing General Arrangement Plans (Confidentiality Withdrawn) Attachment: GIS data for project elements, biological resources, and wetland and water resources (Confidential) Response #1C (February 5, 2016) Email #1C Attachment: Project Map Response #1D (February 26, 2016) Attachment: Detailed Project Map Response #1E (July 8, 2016) Letter #1E Attachment: Cultural Survey Memo (TRC 2016) (Confidential) Attachment: Addendum #2 to the Biological Resources Technical Report (TRC 2016) (Confidentiality Withdrawn) |
Response #1 (March 18, 2016) Table of Responses #1 Attachment: GIS data for alternate workspaces and access routes (Confidential) Response #2 (April 1, 2016) Attachment: Preliminary Helicopter Use Plan Response #3 (April 22, 2016) Attachment: Revised DRAFT Wetland Delineation Report (TRC 2016) (Confidentiality Withdrawn) |
|
Response
#1 (April 26, 2016)
Letter #1 Attachment: Cultural Memo RE P-49-001179 and APM CR-1 (Confidential Information Redacted) |
|
Response
(August 23, 2016)
Letter #1 (Note: Materials where PG&E withdrew claims of confidentiality under PUC Section 583 are marked above) |
CPUC
Data Needs
|
PG&E
Response and Status
|
Response #1 (July 8, 2016)
Table of Responses #1 Summary of Project Emissions: Air Quality, Greenhouse Gas Helicopter Emissions Calculations: Air Quality, Greenhouse Gas SF6-Insulated Breaker Emissions: Greenhouse Gas Construction Equipment List |
|
Response #1 (October 12, 2016)
Table of Responses #1 Attachment: Control Building Draft Sketch Attachment: Preliminary Construction Plan for PS-6 Attachment: Calculations and CalEEMod Files (TRC 2016) Attachment: Maps from Addendum #2 to Biological Resources Technical Report (TRC 2016) Attachment: Special-Status Plant Survey Memo (GANDA 2016) Attachment: FAA Expired Determinations Attachment: Updates to the Revised Wetland Delineation Report (TRC 2016) Attachment: PG&E Windsor Substation Project Location Map Response #2 (October 17, 2016) Attachment: GIS data for project elements, biological resources, and wetland and water resources (Confidential) |
|
Response #1 (December 2, 2016)
Table of Responses #1 Response #2 (December 23, 2016) Attachment: Updated GIS data (Confidential) Response #3 (January 13, 2017) Attachment: Addendum #3 to the Biological Resources Technical Report (TRC 2016) |
|
Response #1 (April 6, 2017)
Table of Responses #1 Response #2 (April 11, 2017) Attachment: Additional Cultural Resources Survey Report (Confidential) Response #3 (May 30, 2017) Attachment: GIS data for project elements, biological resources, cultural resources, and wetland and water resources (Confidential) Response #4 (May 31, 2017) Attachment: Biological Reconnaissance Survey for Work Areas (TRC 2017) Attachment: Memo regarding SW3 at Pole 62 (TRC 2017) Attachment: Memo regarding Aquatic Resources Assessment (GANDA 2017) |
Fax
(650) 373 - 1211
CPUC Project Manager
Mailing Address
Lisa Orsaba
California Public Utilities Commission
505 Van Ness Ave, 4th Floor
San Francisco CA, 94102Formal Comment
Mailing AddressCalifornia Public Utilities Commission
Attn: Fulton-Fitch Mountain
c/o Panorama Environmental, Inc.
717 Market Street, Suite 650
San Francisco, CA, 94103
Related
Links:
|
|