Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 5.0 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat.

Variance Request

Date Requested

Date Issued

Segment

Description

WORK PACKAGE 1 - SEGMENTS 4, 5, and 10

Segment 4

VR #42

3/04/11

3/08/11

4

Additional access road improvements

VR #55

4/12/11

4/20/11

4

Relocate two towers and associated access roads and disturbance areas within ROW

VR #77

7/27/11

8/03/11

4

Two additional Wire Stringing Sites near Towers 35 and 51

VR #79

8/06/11

8/11/11

4

Guard Structure Site near Tower 52

VR #82

8/18/11

8/30/11

4

Wire Stringing Site relocations and new Wire Stringing Site and overland travel routes

VR #86

9/02/11

9/12/11

4

Two Guard Structure Sites

VR #88

9/15/11

9/20/11

4

Allow for the use of six water trucks that do not meet the requirements of MM AQ-1d (also for use on Segments 5 & 10)

VR #92

10/01/11

10/03/11

4

Access road use near Tower 31

VR #98

10/22/11

11/04/11

4

Additional turning radii and road reclassification associated with Tower M73-T3AX

VR #109

12/22/11

1/04/12

4

Additional wire stringing site outside of Antelope Substation

Segment 5

VR #13

11/09/10

11/17/10

5

Additional wire stringing sites

VR #15

11/18/10

11/19/10

5

Additional guard structures between Highway 14 and Sierra Highway

VR #16

11/12/10

11/19/10

5

Realign an existing access road at the southeastern corner of the Vincent Substation 500 kV expansion area

VR #18

11/24/10

12/01/10

5

Continue use of two existing access roads that are approved under a TEWS

VR #19

Revised 11/23/10

12/01/10

5

Additional wire stringing sites

VR #40

3/02/11

3/03/11

5

Additional access road to Tower 29

VR #41

3/04/11

3/08/11

5

Additional access road improvements

VR #45

3/22/11

3/25/11

5

Soil stockpile areas at three locations

VR #48

4/06/11

4/08/11

5

Start of construction prior to Los Angeles County Public Works grading permit issuance

VR #53

4/05/11

4/15/11

5

Permission to build slope stabilization Towers prior to Los Angeles County Public Works Permit

VR #54

4/14/11

4/18/11

5

Soil stockpile area near Tower 27

VR #61

5/11/11

5/13/11

5

Additional access off Godde Hill Road

VR #66

5/26/11

6/06/11

5

Elizabeth Lake access road

VR #70

6/14/11

6/30/11

5

Change in pulling site location at Towers 22, 43, 51a, and 57

VR #76

Revised 7/25/11

8/03/11

5

Relocation of a Wire Stringing Site near Tower 34

VR #88

9/15/11

9/20/11

5

Allow for the use of six water trucks that do not meet the requirements of MM AQ-1d (also for use on Segments 4 & 10)

VR #90

9/26/11

10/03/11

5

Extra workspace for Tower 30

VR #91

9/28/11

10/03/11

5

Addition of mats at Tower 45

VR #93

9/30/11

10/05/11

5

Additional disturbance area near Tower 55A

VR #95

9/30/11

10/12/11

5

Additional disturbance areas at Towers 19, 22, and 25

VR #101

11/02/11

11/04/11

5

Additional workspace at Towers 30, 51a, and 61

VR #102

11/02/11

11/09/11

5

Extra workspace near Tower 18

VR #103

11/04/11

11/09/11

5

Additional Guard Structure Sites

VR #105

11/06/11

11/14/11

5

Additional workspace at Towers 6, 28B, 44, 68, and M113-T3

VR #106

11/09/11

11/17/11

5

Additional workspace and roadways at Tower 30

VR #108

11/18/11

11/22/11

5

Extra workspace near Towers 50, 51A, and 55

VR #111

1/11/12

1/17/12

5

Additional vehicle parking and equipment staging near Tower 25

VR #114

1/24/12

2/03/12

5

Additional disturbance areas at Tower 86

VR #121

3/16/12

3/20/12

5

Additional work area near Tower 19

VR #124

3/26/12

3/30/12

5

Additional disturbance areas near Tower M18-T5

VR #139

1/09/13

1/11/13

5

Road change designation from minimum to medium improvement near Tower 54

Segment 10

VR #36

2/14/11

2/15/11

10 Telecom

Move two wood poles approximately 5 feet out of the drainage along Oak Creek Road

VR #73

6/01/11

7/08/11

10

Shift in Tower 43 Wire Stringing Site

VR #80

8/10/11

8/12/11

10

Roadway reclassification and modification near Tower 83

VR #81

8/12/11

8/18/11

10

Roadway reclassification and modifications near Towers 48 and 49

VR #87

9/09/11

9/12/11

10

Use of existing roads between 90th Street west and Tower 6

VR #88

9/15/11

9/20/11

10

Allow for the use of six water trucks that do not meet the requirements of MM AQ-1d (also for use on Segments 4 & 5)

VR #89

9/15/11

9/22/11

10

Increased turning radii at Towers 67 and 68, and road improvements at Tower 74

WORK PACKAGE 3 - SEGMENTS 7 AND 8

Segment 7

VR #2

5/25/10

5/27/10

7

Relocation of helicopter landing zone for Segment 7 telecommunications work

VR #3

6/08/10

6/10/10

7

Clarification of Segment 7 Telecom construction operating hours and to work the weekend dates of June 12, 13, 19, and 20, within the City of Irwindale

VR #5

8/20/10

8/20/10

7

Night work for Segment 7 Telecom

VR #21

12/03/10

12/03/10

7

Remove fabric on chain-link fence surrounding Mesa Material Yard because of graffiti (yard also used for Segment 8)

VR #22

11/22/10

12/07/10

7

Additional wire stringing sites

VR #23

12/03/10

12/09/10

7

Ten additional access roads

VR #26

1/06/11

1/06/11

7

Revised disturbance areas in Montebello Hills

VR #27

1/12/11

1/13/11

7

Relocation of interset Tower M54-T3A

VR #31

2/04/11

2/04/11

7

Revised 66 kV underground alignment along Edison Avenue in the City of Chino

VR #46

3/25/11

4/04/11

7

Temporary disturbance areas for underground 66 kV

VR #52

4/11/11

4/14/11

7

Additional access to interset Tower M54-T3A

VR #57

4/07/11

4/25/11

7

Additional improvements to Van Tassel Motorway

VR #60

4/25/11

5/13/11

7

Wire Stringing Site expansions

MOD
VR #60

4/25/11

6/06/11

7

Additional Wire Stringing Site 7.1a

VR #62

5/12/11

5/18/11

7

Soil stockpile area near Tower M27-T3

VR #113

1/11/12

1/27/12

7

Addition of tower work areas in Montebello Hills

VR #115

2/07/12

2/09/12

7

Expansion of wire sites and guard structures

VR #117

2/24/12

3/01/12

7

Wire Stringing Site expansions near Towers M33-T1 and M41-T4

VR #118

3/05/12

3/07/12

7

Access road near Tower M42-T6 and Wire Stringing Site 7.75

VR #119

3/01/12

3/13/12

7

Snub site between Towers M32-T3 and M32-T4

VR #123

3/27/12

3/30/12

7

Additional parking areas at Towers M39-T1 through M39-T3

VR #126

4/17/12

4/20/12

7

Additional area for Wire Stringing Site 7.15

VR #128

5/03/12

5/14/12

7

Changes to Wire Stringing Site and access roads between Towers M30-T1 and M29-T3

VR #136

9/25/12

10/04/12

7

Extra workspace and drainage crossing at Tower M31-T2

VR #137

11/02/12

11/06/12

7

Additional work area for tower M38-T4

VR #140

12/10/12

2/07/13

7

Additional Wire Stringing Site and access road additions

VR #141

1/30/13

2/08/13

7

66 kV Relocation - open taps and hang grounds at Pole No. 1723533 for an outage

VR #152

3/31/14

4/09/14

7

Additional extra workspace for Wire Stringing Site near Tower M30-T2 and Wire Stringing Site 7.13

VR #159

7/31/14

8/15/14

7

Guard structure at Tower M35-T4

VR #160

8/04/14

8/05/14

7

Additional Wire Stringing Site at Tower M36-T2

VR #161

8/14/14

8/29/14

7

Expansion of a guard structure location north of the 60 freeway

VR #162

8/20/14

8/29/14

7

Additional Wire Stringing Site near Tower M37-T3

VR #163

10/02/14

10/02/14

7

Additional Guard Structure Sites near Tower M40-T5

VR #165

11/06/14

11/12/14

7

Additional Guard Structure Site near Mesa Substation

Segment 8

VR #6

8/26/10

8/26/10

8

Work on weekends for Segment 8 Telecom

VR #7

9/10/10

9/16/10

8

New Wire Stringing Sites and pull sites for Segment 8 Phase 1

VR#8

9/16/10

9/16/10

8

Clarification of construction hours for Segment 8 Phase 1

Verbal

10/08/10

10/08/10

8

Wire Stringing Sites for construction on Sunday, October 10, on Segment 8 Phases 2 & 3

VR #10

10/08/10

10/13/10

8

Additional Wire Stringing Sites, Segment 8 Phase 2 & 3

VR #11

10/01/10

10/15/10

8

Relief from focused biological survey requirements because of restricted property access, Segment 8 Phase 1

VR #12

10/06/10

10/15/10

8

Additional Wire Stringing Sites, Segment 8 Phase 1

VR #14

11/17/10

11/19/10

8

Additional Shoofly pole in Tonner Canyon, Segment 8 Phase 1

VR #17

Revised
11/17/10

11/22/10

8

Additional 66 kV material storage near Rio Hondo and Chino Substations

VR #20

11/30/10

12/02/10

8

Revised alignment of an access road for safer access to tower sites on Segment 8 Phase 1

VR #21

12/03/10

12/03/10

8

Remove fabric on chain-link fence surrounding Mesa MY because of graffiti (also on Segment 7)

VR #24

12/17/10

12/20/10

8

Use of an existing concrete parking area/pad in Tonner Canyon as a helicopter landing zone and equipment staging and parking area, Segment 8 Phase 1

VR #25

12/17/10

12/20/10

8

Revision to the Tower Work Area for Tower M73-T2, Segment 8 East (Phase 3)

VR #31

2/04/11

2/04/11

8

Revised 66 kV underground alignment along Edison Avenue in the City of Chino

VR #33

2/08/11

2/10/11

8

Access route to Tower M0-T6, Segment 8 Phase 2

VR #35

2/14/11

2/14/11

8

Access to additional Wire Stringing Sites between Oaks Avenue and Tower M46-T7b, Segment 8 Phase 3

VR #38

2/23/11

2/25/11

8

Expansion of Wire Stringing Site for Segment 8 Phase 4 work

VR #43

3/03/11

3/10/11

8

Additional access to Tower M2-T2, Segment 8 Phase 2

VR #44

3/16/11

3/18/11

8

Tower M2-T5 and access road shift within SCE ROW, Segment 8 Phase 2

VR #47

4/05/11

4/06/11

8

Wire Stringing Sites for Tower M2-T2, Segment 8 Phase 2

VR #48

4/06/11

4/08/11

8

Start of construction prior to Los Angeles County Public Works grading permit issuance, Segment 8 Phase 1

VR #49

4/06/11

4/08/11

8

Extended work hours on Segment 8 Phase 2

VR #50

4/05/11

4/13/11

8

Turnouts along Sanome Mountain Way, Segment 8 Phase 1

VR #51

3/29/11

4/13/11

8

Six additional Wire Stringing Sites on Segment 8 Phases 2 and 3

VR #53

4/05/11

4/15/11

8

Permission to build slope stabilization Towers prior to Los Angeles County Public Works Permit, Segment 8 Phases 1 and 4

VR #58

5/02/11

5/05/11

8

Tower M48-T4 access road, Segment 8 Phase 4

VR #59

5/06/11

5/09/11

8

Additional parking, staging, and turn-around areas at Towers M49-T1 and M59-T2, Segment 8 Phase 1

VR #63

5/19/11

5/23/11

8

Change to previously approved access road at Tower M61-T1, Segment 8 Phase 1

VR #64

5/23/11

6/06/11

8

Extra workspace to accommodate wire tagging areas, Segment 8 Phase 4

VR #65

5/25/11

6/06/11

8

Extra parking, staging and turnaround at Tower M48-T3, Segment 8 Phase 4

VR #67

5/27/11

6/06/11

8

Additional workspace near Tower M23-T2A, Segment 8 Phase 1

VR #71

6/27/11

7/06/11

8

Extra workspace at Towers M57-T2 and M57-T3, Segment 8 Phase 1

VR #72

7/01/11

7/08/11

8

Additional workspace at the I-605 Shoofly area, Segment 8 Phase 4

VR #78

8/03/11

8/04/11

8

Relief from focused biological survey requirements because of restricted property access, Segment 8 Phase 1 (CDFG approval provided)

VR #83

7/26/11

8/30/11

8

Access road for Towers MA1-T2 and MA1-T4, Segment 8 Phase 4

VR #84

8/30/11

9/01/11

8

Access road and staging area for Towers M54-T1 and M54-T2, Segment 8 Phase 4

VR #85

7/15/11

9/12/11

8

Additional guard structure sites at Fullerton Road and Wire Stringing Sites at Towers M51-T2, M51-T3, M50-T1, M45-T4 and M6-T2, Segment 8 Phase 4

VR #94

9/28/11

10/12/11

8

Widen the curve of an access road leading to Tower M56-T4, Segment 8 Phase 1

VR #96

10/12/11

10/17/11

8

Guard structure site and access road to Tower MA1-T3, Segment 8 Phase 4

VR #97

10/06/11

10/21/11

8

Telecom wire sites at Rose Hills

VR #99

10/20/11

11/01/11

8

Extra Workspace for topsoil salvage at Tower M56-T3, Segment 8 Phase 1

VR #100

9/28/11

11/04/11

8

Twenty-four staging and turnaround areas, Segment 8 Phase 4

MOD #1
VR #100

9/05/14

9/17/14

8

Addition of helicopter landing at pre-approved sites, Segment 8 Phase 4

MOD #2
VR #100

11/26/14

12/02/14

8

Additional temporary road widening to access Wire Stringing Site, Segment 8 Phase 4

MOD #3
VR #100

12/09/14

01/13/15

8

Use of approved staging area as helicopter landing zone near Tower M49-T4, Segment 8 Phase 4

VR #104

11/02/11

11/09/11

8

Use of 605 Shoofly as Contractor Yard, Segment 8 Phase 4

VR #107

11/16/11

11/18/11

8

Use of Contractor yard previously approved as TEWS in Chino, 66 kV

VR #110

1/13/12

1/10/12

8

Widen road near Towers M55-T2 and M56-T1, Segment 8 Phase 1

VR #112

1/12/12

1/17/12

8

Permanent removal of the fabric screening surrounding the Mira Loma Contractor Yard

VR #116

1/27/12

3/01/12

8

Additional Guard Structure Sites at Towers M64-T4 and M64-T5, Segment 8 Phase 1

VR #122

2/22/12

3/30/12

8

Running Branch Road staging area, Segment 8 Phase 1

VR #127

4/04/12

4/23/12

8

Use of existing roads in Rose Hills & Sanitations District, Segment 8 Phase 4

VR #129

5/01/12

Denied
5/16/12

8

Relief from focused biological survey requirements because of restricted property access, Rose Hills, Segment 8 Phase 4

VR #132

6/20/12

7/22/12

8

Curve widening along existing access roads, modified Wire Stringing Sites and access at Towers M45-T4/M6-T2 and M45-T5, Segment 8 Phase 4

VR #134

8/24/12

8/29/12

8

Landfill access to Tower M45-T1, Segment 8 Phase 4

VR #135

8/22/12

9/12/12

8

Tower M45-T5 access road curve widening and pull-outs, Segment 8 Phase 4

VR #142

2/11/13
Additional info submitted 5/28/13

6/05/13

8

Additional work areas and access roads, Segment 8 Phases 1 and 4

VR #143

5/23/13

6/05/13

8

Additional access roads, guard structures, and distribution clearances, Segment 8 Phase 3

VR #145

8/15/13

8/23/13

8

Extra workspace near Tower M57-T2 in Tonner Canyon, Segment 8 Phase 1

VR #146

9/09/13

9/26/13

8

Use of two pull-outs for parking equipment near Towers M44-T3 and M43-T3, Segment 8 Phase 4

VR #148

10/26/13

11/07/13

8

Additional parking areas near Tower M57-T1 in Tonner Canyon, Segment 8 Phase 1

VR #149

2/22/12 resubmitted 9/27/13

11/12/13

8

Extra workspace at Tower M60-T1, Segment 8 Phase 1

VR #151

3/27/14

4/03/14

8

Temporary use of existing access road to Tower M7-T1, Segment 8 Phase 4

VR #153

4/07/14

4/09/14

8

Additional space for wire stringing in Rose Hills Cemetery, Segment 8 Phase 4

VR #154

4/07/14

4/11/14

8

Additional space for wire stringing near Tower M55-T1, Segment 8 Phase 4

VR #156

6/17/14

7/17/14

8

Additional Wire Stringing Site east of Tower M53-T3, Segment 8 Phase 4

VR #157

6/27/14

7/17/14

8

Additional Wire Stringing Site near Wire Stringing Site 8-4.22, Segment 8 Phase 4

VR #158

7/01/14

7/17/14

8

Use of alternative access road to Tower M70-T3/T4; currently approved under TEWS, Segment 8 Phase 3

VR #164

9/02/14

10/10/14

8

Helicopter Landing Zone near Tower M69-T2, Segment 8 Phase 3

VR #166

10/31/14

11/18/14

8

Temporary area for water tanks in two locations for 500 kV Underground

VR #167

2/06/15

2/20/15

8

Temporary water pipeline for 500 kV Underground

10/09/15
10/21/15
8
Use of two existing access roads and three additional wire setup sites on 500 kV Underground
11/23/15
11/24/15
8
Use of additional disturbance areas
12/07/15
12/09/15
8
Use of an additional wire setup site north of M65-T3
12/24/15
1/05/16
8
Installation of temporary aboveground water pipeline to support HDD operations
MTWC #5
7/13/16
7/26/16
8
Foot access to foundation outside approved disturbance area and temporary fencing.

WORK PACKAGE 2 - SEGMENTS 6 AND 11 (NON-ANF LANDS)

Segment 6

 

3/30/12

Rescinded

6A

Corral relocation near Tower 12

VR #130

6/05/12

6/12/12

6A

Use of additional access road near Towers 11 and 12

VR #131

6/03/12

6/06/12

6A

Placement of two generators and additional road use in Aliso Canyon to provide power during distribution line outage

VR #133

7/18/12

8/07/12

6A and 6C

Guy wire staking outside of disturbance areas to provide stability of suspended loads

VR #147

10/09/13

10/17/13

6A

Use of existing access roads for equipment staging

Segment 11

VR #74

7/22/11

7/28/11

11A

Modification of Guard Structure Sites

VR #75

7/25/11

8/03/11

11A

Equipment AQ-1d compliance

VR #144

7/17/13

8/07/13

11B

Pedestrian access to distribution line via trails

VR #150

11/20/13

12/11/13

11C

Additional work areas near Tower 5

VR #155

6/03/14

6/20/14

11C

Use of additional spur roads and pull outs

TRTP SUBSTATIONS

VR #1

3/25/10

3/26/10

Vincent

Expand grading area of Vincent substation by 15 feet for temporary turnaround areas for equipment

VR #4

8/11/10

8/13/10

Vincent

Utilize a fire hydrant along an unpaved spur road and also place two 10,000-gallon elevated water storage tanks adjacent to the hydrant

VR #32

2/04/11

2/07/11

Whirlwind

Temporary offsite equipment loading/unloading and parking areas

VR #34

 

2/11/11

Whirlwind

Temporary concrete slab within work area of VR #32

TRTP YARDS

VR #9

9/14/10

9/20/10

Yard 28 and Rancho Vista Yard

Hotwork (welding and cutting) at Yard 28 and Rancho Vista Yard

VR #28

1/14/11

1/19/11

Vincent South

Grading at Vincent South Material Yard

VR #29

1/14/11

1/19/11

Rodeo North and South

Additional parking areas at Rodeo North and South Contractor Yards

VR #30

1/28/11

1/28/11

Vincent North

Grading at Vincent North Material Yard

VR #37

2/19/11

2/24/11

Yard 75

Modification to Yard 75 boundaries

VR #39

3/01/11

3/03/11

All Yards

Replace fence fabric screening with slats for safety reasons during high wind events

VR #56

4/13/11

4/20/11

Vincent North & Vincent South

Installation of temporary power poles to provide power to Vincent North and Vincent South Material Yards

VR #120

3/02/12

3/15/12

Vincent North

Access for pedestrian gate at Vincent North Yard

VR #125

3/27/12

4/06/12

Vincent North & Vincent South

Additional power and associated disturbance areas needed at Vincent North and Vincent South Material Yards

VR #138

10/29/12

11/20/12

Vincent South

Expansion of the Vincent South Material Yard

MISCELLANEOUS

VR #68

5/10/11
Revised 6/14/11

6/24/11

All

Allow continued use of approved TEWS access roads if nesting birds subsequently move in

VR #69

6/14/11

6/27/11

All

Variance to MM AQ-1d

   