Variance Request
|
Date Requested
|
Date Issued
|
Segment
|
Description
|
WORK PACKAGE 1 - SEGMENTS 4, 5, and 10
|
Segment 4
|
VR
#42
|
3/04/11
|
3/08/11
|
4
|
Additional access road improvements
|
VR
#55
|
4/12/11
|
4/20/11
|
4
|
Relocate two towers and associated access roads and disturbance
areas within ROW
|
VR
#77
|
7/27/11
|
8/03/11
|
4
|
Two additional Wire Stringing Sites near Towers 35 and 51
|
VR
#79
|
8/06/11
|
8/11/11
|
4
|
Guard Structure Site near Tower 52
|
VR
#82
|
8/18/11
|
8/30/11
|
4
|
Wire Stringing Site relocations and new Wire Stringing Site and
overland travel routes
|
VR
#86
|
9/02/11
|
9/12/11
|
4
|
Two Guard Structure Sites
|
VR
#88
|
9/15/11
|
9/20/11
|
4
|
Allow for the use of six water trucks that do not meet the requirements
of MM AQ-1d (also for use on Segments 5 & 10)
|
VR
#92
|
10/01/11
|
10/03/11
|
4
|
Access road use near Tower 31
|
VR
#98
|
10/22/11
|
11/04/11
|
4
|
Additional turning radii and road reclassification associated with
Tower M73-T3AX
|
VR
#109
|
12/22/11
|
1/04/12
|
4
|
Additional wire stringing site outside of Antelope Substation
|
Segment 5
|
VR
#13
|
11/09/10
|
11/17/10
|
5
|
Additional wire stringing sites
|
VR
#15
|
11/18/10
|
11/19/10
|
5
|
Additional guard structures between Highway 14 and Sierra Highway
|
VR
#16
|
11/12/10
|
11/19/10
|
5
|
Realign an existing access road at the southeastern corner of the
Vincent Substation 500 kV expansion area
|
VR
#18
|
11/24/10
|
12/01/10
|
5
|
Continue use of two existing access roads that are approved under
a TEWS
|
VR
#19
|
Revised 11/23/10
|
12/01/10
|
5
|
Additional wire stringing sites
|
VR
#40
|
3/02/11
|
3/03/11
|
5
|
Additional access road to Tower 29
|
VR
#41
|
3/04/11
|
3/08/11
|
5
|
Additional access road improvements
|
VR
#45
|
3/22/11
|
3/25/11
|
5
|
Soil stockpile areas at three locations
|
VR
#48
|
4/06/11
|
4/08/11
|
5
|
Start of construction prior to Los Angeles County Public Works
grading permit issuance
|
VR
#53
|
4/05/11
|
4/15/11
|
5
|
Permission to build slope stabilization Towers prior to Los Angeles
County Public Works Permit
|
VR
#54
|
4/14/11
|
4/18/11
|
5
|
Soil stockpile area near Tower 27
|
VR
#61
|
5/11/11
|
5/13/11
|
5
|
Additional access off Godde Hill Road
|
VR
#66
|
5/26/11
|
6/06/11
|
5
|
Elizabeth Lake access road
|
VR
#70
|
6/14/11
|
6/30/11
|
5
|
Change in pulling site location at Towers 22, 43, 51a, and 57
|
VR
#76
|
Revised 7/25/11
|
8/03/11
|
5
|
Relocation of a Wire Stringing Site near Tower 34
|
VR
#88
|
9/15/11
|
9/20/11
|
5
|
Allow for the use of six water trucks that do not meet the requirements
of MM AQ-1d (also for use on Segments 4 & 10)
|
VR
#90
|
9/26/11
|
10/03/11
|
5
|
Extra workspace for Tower 30
|
VR
#91
|
9/28/11
|
10/03/11
|
5
|
Addition of mats at Tower 45
|
VR
#93
|
9/30/11
|
10/05/11
|
5
|
Additional disturbance area near Tower 55A
|
VR
#95
|
9/30/11
|
10/12/11
|
5
|
Additional disturbance areas at Towers 19, 22, and 25
|
VR
#101
|
11/02/11
|
11/04/11
|
5
|
Additional workspace at Towers 30, 51a, and 61
|
VR
#102
|
11/02/11
|
11/09/11
|
5
|
Extra workspace near Tower 18
|
VR
#103
|
11/04/11
|
11/09/11
|
5
|
Additional Guard Structure Sites
|
VR
#105
|
11/06/11
|
11/14/11
|
5
|
Additional workspace at Towers 6, 28B, 44, 68, and M113-T3
|
VR
#106
|
11/09/11
|
11/17/11
|
5
|
Additional workspace and roadways at Tower 30
|
VR
#108
|
11/18/11
|
11/22/11
|
5
|
Extra workspace near Towers 50, 51A, and 55
|
VR
#111
|
1/11/12
|
1/17/12
|
5
|
Additional vehicle parking and equipment staging near Tower 25
|
VR
#114
|
1/24/12
|
2/03/12
|
5
|
Additional disturbance areas at Tower 86
|
VR
#121
|
3/16/12
|
3/20/12
|
5
|
Additional work area near Tower 19
|
VR
#124
|
3/26/12
|
3/30/12
|
5
|
Additional disturbance areas near Tower M18-T5
|
VR
#139
|
1/09/13
|
1/11/13
|
5
|
Road change designation from minimum to medium improvement near
Tower 54
|
Segment 10
|
VR
#36
|
2/14/11
|
2/15/11
|
10 Telecom
|
Move two wood poles approximately 5 feet out of the drainage along
Oak Creek Road
|
VR
#73
|
6/01/11
|
7/08/11
|
10
|
Shift in Tower 43 Wire Stringing Site
|
VR
#80
|
8/10/11
|
8/12/11
|
10
|
Roadway reclassification and modification near Tower 83
|
VR
#81
|
8/12/11
|
8/18/11
|
10
|
Roadway reclassification and modifications near Towers 48 and 49
|
VR
#87
|
9/09/11
|
9/12/11
|
10
|
Use of existing roads between 90th Street west and Tower 6
|
VR
#88
|
9/15/11
|
9/20/11
|
10
|
Allow for the use of six water trucks that do not meet the requirements
of MM AQ-1d (also for use on Segments 4 & 5)
|
VR
#89
|
9/15/11
|
9/22/11
|
10
|
Increased turning radii at Towers 67 and 68, and road improvements
at Tower 74
|
WORK PACKAGE 3 - SEGMENTS 7 AND 8
|
Segment 7
|
VR
#2
|
5/25/10
|
5/27/10
|
7
|
Relocation of helicopter landing zone for Segment 7 telecommunications
work
|
VR
#3
|
6/08/10
|
6/10/10
|
7
|
Clarification of Segment 7 Telecom construction operating hours
and to work the weekend dates of June 12, 13, 19, and 20, within
the City of Irwindale
|
VR
#5
|
8/20/10
|
8/20/10
|
7
|
Night work for Segment 7 Telecom
|
VR
#21
|
12/03/10
|
12/03/10
|
7
|
Remove fabric on chain-link fence surrounding Mesa Material Yard
because of graffiti (yard also used for Segment 8)
|
VR
#22
|
11/22/10
|
12/07/10
|
7
|
Additional wire stringing sites
|
VR
#23
|
12/03/10
|
12/09/10
|
7
|
Ten additional access roads
|
VR
#26
|
1/06/11
|
1/06/11
|
7
|
Revised disturbance areas in Montebello Hills
|
VR
#27
|
1/12/11
|
1/13/11
|
7
|
Relocation of interset Tower M54-T3A
|
VR
#31
|
2/04/11
|
2/04/11
|
7
|
Revised 66 kV underground alignment along Edison Avenue in the
City of Chino
|
VR
#46
|
3/25/11
|
4/04/11
|
7
|
Temporary disturbance areas for underground 66 kV
|
VR
#52
|
4/11/11
|
4/14/11
|
7
|
Additional access to interset Tower M54-T3A
|
VR
#57
|
4/07/11
|
4/25/11
|
7
|
Additional improvements to Van Tassel Motorway
|
VR
#60
|
4/25/11
|
5/13/11
|
7
|
Wire Stringing Site expansions
|
MOD
VR #60
|
4/25/11
|
6/06/11
|
7
|
Additional Wire Stringing Site 7.1a
|
VR
#62
|
5/12/11
|
5/18/11
|
7
|
Soil stockpile area near Tower M27-T3
|
VR
#113
|
1/11/12
|
1/27/12
|
7
|
Addition of tower work areas in Montebello Hills
|
VR
#115
|
2/07/12
|
2/09/12
|
7
|
Expansion of wire sites and guard structures
|
VR
#117
|
2/24/12
|
3/01/12
|
7
|
Wire Stringing Site expansions near Towers M33-T1
and M41-T4
|
VR
#118
|
3/05/12
|
3/07/12
|
7
|
Access road near Tower M42-T6 and Wire Stringing Site
7.75
|
VR
#119
|
3/01/12
|
3/13/12
|
7
|
Snub site between Towers M32-T3 and M32-T4
|
VR
#123
|
3/27/12
|
3/30/12
|
7
|
Additional parking areas at Towers M39-T1 through
M39-T3
|
VR
#126
|
4/17/12
|
4/20/12
|
7
|
Additional area for Wire Stringing Site 7.15
|
VR
#128
|
5/03/12
|
5/14/12
|
7
|
Changes to Wire Stringing Site and access roads between Towers
M30-T1 and M29-T3
|
VR
#136
|
9/25/12
|
10/04/12
|
7
|
Extra workspace and drainage crossing at Tower M31-T2
|
VR
#137
|
11/02/12
|
11/06/12
|
7
|
Additional work area for tower M38-T4
|
VR
#140
|
12/10/12
|
2/07/13
|
7
|
Additional Wire Stringing Site and access road additions
|
VR
#141
|
1/30/13
|
2/08/13
|
7
|
66 kV Relocation - open taps and hang grounds at Pole No. 1723533
for an outage
|
VR
#152
|
3/31/14
|
4/09/14
|
7
|
Additional extra workspace for Wire Stringing Site near Tower M30-T2
and Wire Stringing Site 7.13
|
VR
#159
|
7/31/14
|
8/15/14
|
7
|
Guard structure at Tower M35-T4
|
VR
#160
|
8/04/14
|
8/05/14
|
7
|
Additional Wire Stringing Site at Tower M36-T2
|
VR
#161
|
8/14/14
|
8/29/14
|
7
|
Expansion of a guard structure location north of the 60 freeway
|
VR
#162
|
8/20/14
|
8/29/14
|
7
|
Additional Wire Stringing Site near Tower M37-T3
|
VR
#163
|
10/02/14
|
10/02/14
|
7
|
Additional Guard Structure Sites near Tower M40-T5
|
VR
#165
|
11/06/14
|
11/12/14
|
7
|
Additional Guard Structure Site near Mesa Substation
|
Segment 8
|
VR
#6
|
8/26/10
|
8/26/10
|
8
|
Work on weekends for Segment 8 Telecom
|
VR
#7
|
9/10/10
|
9/16/10
|
8
|
New Wire Stringing Sites and pull sites for Segment 8 Phase 1
|
VR#8
|
9/16/10
|
9/16/10
|
8
|
Clarification of construction hours for Segment 8 Phase 1
|
Verbal
|
10/08/10
|
10/08/10
|
8
|
Wire Stringing Sites for construction on Sunday, October 10, on
Segment 8 Phases 2 & 3
|
VR
#10
|
10/08/10
|
10/13/10
|
8
|
Additional Wire Stringing Sites, Segment 8 Phase 2 & 3
|
VR
#11
|
10/01/10
|
10/15/10
|
8
|
Relief from focused biological survey requirements because of restricted
property access, Segment 8 Phase 1
|
VR
#12
|
10/06/10
|
10/15/10
|
8
|
Additional Wire Stringing Sites, Segment 8 Phase 1
|
VR
#14
|
11/17/10
|
11/19/10
|
8
|
Additional Shoofly pole in Tonner Canyon, Segment 8 Phase 1
|
VR
#17
|
Revised
11/17/10
|
11/22/10
|
8
|
Additional 66 kV material storage near Rio Hondo and Chino
Substations
|
VR
#20
|
11/30/10
|
12/02/10
|
8
|
Revised alignment of an access road for safer access to tower sites
on Segment 8 Phase 1
|
VR
#21
|
12/03/10
|
12/03/10
|
8
|
Remove fabric on chain-link fence surrounding Mesa MY because of
graffiti (also on Segment 7)
|
VR
#24
|
12/17/10
|
12/20/10
|
8
|
Use of an existing concrete parking area/pad in Tonner Canyon as
a helicopter landing zone and equipment staging and parking area,
Segment 8 Phase 1
|
VR
#25
|
12/17/10
|
12/20/10
|
8
|
Revision to the Tower Work Area for Tower M73-T2,
Segment 8 East (Phase 3)
|
VR
#31
|
2/04/11
|
2/04/11
|
8
|
Revised 66 kV underground alignment along Edison Avenue in
the City of Chino
|
VR
#33
|
2/08/11
|
2/10/11
|
8
|
Access route to Tower M0-T6, Segment 8 Phase 2
|
VR
#35
|
2/14/11
|
2/14/11
|
8
|
Access to additional Wire Stringing Sites between Oaks Avenue and
Tower M46-T7b, Segment 8 Phase 3
|
VR
#38
|
2/23/11
|
2/25/11
|
8
|
Expansion of Wire Stringing Site for Segment 8 Phase 4 work
|
VR
#43
|
3/03/11
|
3/10/11
|
8
|
Additional access to Tower M2-T2, Segment 8 Phase 2
|
VR
#44
|
3/16/11
|
3/18/11
|
8
|
Tower M2-T5 and access road shift within SCE ROW,
Segment 8 Phase 2
|
VR
#47
|
4/05/11
|
4/06/11
|
8
|
Wire Stringing Sites for Tower M2-T2, Segment 8
Phase 2
|
VR
#48
|
4/06/11
|
4/08/11
|
8
|
Start of construction prior to Los Angeles County Public Works
grading permit issuance, Segment 8 Phase 1
|
VR
#49
|
4/06/11
|
4/08/11
|
8
|
Extended work hours on Segment 8 Phase 2
|
VR
#50
|
4/05/11
|
4/13/11
|
8
|
Turnouts along Sanome Mountain Way, Segment 8 Phase 1
|
VR
#51
|
3/29/11
|
4/13/11
|
8
|
Six additional Wire Stringing Sites on Segment 8 Phases 2 and 3
|
VR
#53
|
4/05/11
|
4/15/11
|
8
|
Permission to build slope stabilization Towers prior to Los Angeles
County Public Works Permit, Segment 8 Phases 1 and 4
|
VR
#58
|
5/02/11
|
5/05/11
|
8
|
Tower M48-T4 access road, Segment 8 Phase 4
|
VR
#59
|
5/06/11
|
5/09/11
|
8
|
Additional parking, staging, and turn-around areas at Towers M49-T1
and M59-T2, Segment 8 Phase 1
|
VR
#63
|
5/19/11
|
5/23/11
|
8
|
Change to previously approved access road at Tower M61-T1,
Segment 8 Phase 1
|
VR
#64
|
5/23/11
|
6/06/11
|
8
|
Extra workspace to accommodate wire tagging areas, Segment 8 Phase 4
|
VR
#65
|
5/25/11
|
6/06/11
|
8
|
Extra parking, staging and turnaround at Tower M48-T3,
Segment 8 Phase 4
|
VR
#67
|
5/27/11
|
6/06/11
|
8
|
Additional workspace near Tower M23-T2A, Segment 8
Phase 1
|
VR
#71
|
6/27/11
|
7/06/11
|
8
|
Extra workspace at Towers M57-T2 and M57-T3,
Segment 8 Phase 1
|
VR
#72
|
7/01/11
|
7/08/11
|
8
|
Additional workspace at the I-605 Shoofly area, Segment
8 Phase 4
|
VR
#78
|
8/03/11
|
8/04/11
|
8
|
Relief from focused biological survey requirements because of restricted
property access, Segment 8 Phase 1 (CDFG approval provided)
|
VR
#83
|
7/26/11
|
8/30/11
|
8
|
Access road for Towers MA1-T2 and MA1-T4,
Segment 8 Phase 4
|
VR
#84
|
8/30/11
|
9/01/11
|
8
|
Access road and staging area for Towers M54-T1 and
M54-T2, Segment 8 Phase 4
|
VR
#85
|
7/15/11
|
9/12/11
|
8
|
Additional guard structure sites at Fullerton Road and Wire Stringing
Sites at Towers M51-T2, M51-T3, M50-T1,
M45-T4 and M6-T2, Segment 8 Phase 4
|
VR
#94
|
9/28/11
|
10/12/11
|
8
|
Widen the curve of an access road leading to Tower M56-T4,
Segment 8 Phase 1
|
VR
#96
|
10/12/11
|
10/17/11
|
8
|
Guard structure site and access road to Tower MA1-T3,
Segment 8 Phase 4
|
VR
#97
|
10/06/11
|
10/21/11
|
8
|
Telecom wire sites at Rose Hills
|
VR
#99
|
10/20/11
|
11/01/11
|
8
|
Extra Workspace for topsoil salvage at Tower M56-T3,
Segment 8 Phase 1
|
VR
#100
|
9/28/11
|
11/04/11
|
8
|
Twenty-four staging and turnaround areas, Segment 8 Phase 4
|
MOD
#1
VR #100
|
9/05/14
|
9/17/14
|
8
|
Addition of helicopter landing at pre-approved sites, Segment 8
Phase 4
|
MOD
#2
VR #100
|
11/26/14
|
12/02/14
|
8
|
Additional temporary road widening to access Wire Stringing Site,
Segment 8 Phase 4
|
MOD
#3
VR #100
|
12/09/14
|
01/13/15
|
8
|
Use of approved staging area as helicopter landing zone near Tower
M49-T4, Segment 8 Phase 4
|
VR
#104
|
11/02/11
|
11/09/11
|
8
|
Use of 605 Shoofly as Contractor Yard, Segment 8 Phase 4
|
VR
#107
|
11/16/11
|
11/18/11
|
8
|
Use of Contractor yard previously approved as TEWS in Chino, 66 kV
|
VR
#110
|
1/13/12
|
1/10/12
|
8
|
Widen road near Towers M55-T2 and M56-T1,
Segment 8 Phase 1
|
VR
#112
|
1/12/12
|
1/17/12
|
8
|
Permanent removal of the fabric screening surrounding the Mira
Loma Contractor Yard
|
VR
#116
|
1/27/12
|
3/01/12
|
8
|
Additional Guard Structure Sites at Towers M64-T4
and M64-T5, Segment 8 Phase 1
|
VR
#122
|
2/22/12
|
3/30/12
|
8
|
Running Branch Road staging area, Segment 8 Phase 1
|
VR
#127
|
4/04/12
|
4/23/12
|
8
|
Use of existing roads in Rose Hills & Sanitations District,
Segment 8 Phase 4
|
VR #129
|
5/01/12
|
Denied
5/16/12
|
8
|
Relief from focused biological survey requirements because of restricted
property access, Rose Hills, Segment 8 Phase 4
|
VR
#132
|
6/20/12
|
7/22/12
|
8
|
Curve widening along existing access roads, modified Wire Stringing
Sites and access at Towers M45-T4/M6-T2 and M45-T5,
Segment 8 Phase 4
|
VR
#134
|
8/24/12
|
8/29/12
|
8
|
Landfill access to Tower M45-T1, Segment 8 Phase 4
|
VR
#135
|
8/22/12
|
9/12/12
|
8
|
Tower M45-T5 access road curve widening and pull-outs,
Segment 8 Phase 4
|
VR
#142
|
2/11/13
Additional info submitted 5/28/13
|
6/05/13
|
8
|
Additional work areas and access roads, Segment 8 Phases 1 and 4
|
VR
#143
|
5/23/13
|
6/05/13
|
8
|
Additional access roads, guard structures, and distribution clearances,
Segment 8 Phase 3
|
VR
#145
|
8/15/13
|
8/23/13
|
8
|
Extra workspace near Tower M57-T2 in Tonner Canyon,
Segment 8 Phase 1
|
VR
#146
|
9/09/13
|
9/26/13
|
8
|
Use of two pull-outs for parking equipment near Towers M44-T3
and M43-T3, Segment 8 Phase 4
|
VR
#148
|
10/26/13
|
11/07/13
|
8
|
Additional parking areas near Tower M57-T1 in Tonner
Canyon, Segment 8 Phase 1
|
VR
#149
|
2/22/12 resubmitted 9/27/13
|
11/12/13
|
8
|
Extra workspace at Tower M60-T1, Segment 8 Phase 1
|
VR
#151
|
3/27/14
|
4/03/14
|
8
|
Temporary use of existing access road to Tower M7-T1,
Segment 8 Phase 4
|
VR
#153
|
4/07/14
|
4/09/14
|
8
|
Additional space for wire stringing in Rose Hills Cemetery, Segment
8 Phase 4
|
VR
#154
|
4/07/14
|
4/11/14
|
8
|
Additional space for wire stringing near Tower M55-T1,
Segment 8 Phase 4
|
VR
#156
|
6/17/14
|
7/17/14
|
8
|
Additional Wire Stringing Site east of Tower M53-T3,
Segment 8 Phase 4
|
VR
#157
|
6/27/14
|
7/17/14
|
8
|
Additional Wire Stringing Site near Wire Stringing Site 8-4.22,
Segment 8 Phase 4
|
VR
#158
|
7/01/14
|
7/17/14
|
8
|
Use of alternative access road to Tower M70-T3/T4;
currently approved under TEWS, Segment 8 Phase 3
|
VR
#164
|
9/02/14
|
10/10/14
|
8
|
Helicopter Landing Zone near Tower M69-T2, Segment
8 Phase 3
|
VR
#166
|
10/31/14
|
11/18/14
|
8
|
Temporary area for water tanks in two locations for 500 kV Underground
|
VR
#167
|
2/06/15
|
2/20/15
|
8
|
Temporary water pipeline for 500 kV Underground
|
|
10/09/15
|
10/21/15
|
8
|
Use of two existing access roads and three
additional wire setup sites on 500 kV Underground |
|
11/23/15
|
11/24/15
|
8
|
Use of additional disturbance areas |
|
12/07/15
|
12/09/15
|
8
|
Use of an additional wire setup site north
of M65-T3 |
|
12/24/15
|
1/05/16
|
8
|
Installation of temporary aboveground water
pipeline to support HDD operations |
MTWC #5 |
7/13/16
|
7/26/16
|
8
|
Foot access to foundation outside approved
disturbance area and temporary fencing. |
WORK PACKAGE 2 - SEGMENTS 6 AND 11 (NON-ANF LANDS)
|
Segment 6
|
|
3/30/12
|
Rescinded
|
6A
|
Corral relocation near Tower 12
|
VR
#130
|
6/05/12
|
6/12/12
|
6A
|
Use of additional access road near Towers 11 and 12
|
VR
#131
|
6/03/12
|
6/06/12
|
6A
|
Placement of two generators and additional road use in Aliso Canyon
to provide power during distribution line outage
|
VR
#133
|
7/18/12
|
8/07/12
|
6A and 6C
|
Guy wire staking outside of disturbance areas to provide stability
of suspended loads
|
VR
#147
|
10/09/13
|
10/17/13
|
6A
|
Use of existing access roads for equipment staging
|
Segment 11
|
VR
#74
|
7/22/11
|
7/28/11
|
11A
|
Modification of Guard Structure Sites
|
VR
#75
|
7/25/11
|
8/03/11
|
11A
|
Equipment AQ-1d compliance
|
VR
#144
|
7/17/13
|
8/07/13
|
11B
|
Pedestrian access to distribution line via trails
|
VR
#150
|
11/20/13
|
12/11/13
|
11C
|
Additional work areas near Tower 5
|
VR
#155
|
6/03/14
|
6/20/14
|
11C
|
Use of additional spur roads and pull outs
|
TRTP SUBSTATIONS
|
VR
#1
|
3/25/10
|
3/26/10
|
Vincent
|
Expand grading area of Vincent substation by 15 feet for temporary
turnaround areas for equipment
|
VR
#4
|
8/11/10
|
8/13/10
|
Vincent
|
Utilize a fire hydrant along an unpaved spur road and also place
two 10,000-gallon elevated water storage tanks adjacent to the hydrant
|
VR
#32
|
2/04/11
|
2/07/11
|
Whirlwind
|
Temporary offsite equipment loading/unloading and parking areas
|
VR
#34
|
|
2/11/11
|
Whirlwind
|
Temporary concrete slab within work area of VR #32
|
TRTP YARDS
|
VR
#9
|
9/14/10
|
9/20/10
|
Yard 28 and Rancho Vista Yard
|
Hotwork (welding and cutting) at Yard 28 and Rancho Vista Yard
|
VR
#28
|
1/14/11
|
1/19/11
|
Vincent South
|
Grading at Vincent South Material Yard
|
VR
#29
|
1/14/11
|
1/19/11
|
Rodeo North and South
|
Additional parking areas at Rodeo North and South Contractor Yards
|
VR
#30
|
1/28/11
|
1/28/11
|
Vincent North
|
Grading at Vincent North Material Yard
|
VR
#37
|
2/19/11
|
2/24/11
|
Yard 75
|
Modification to Yard 75 boundaries
|
VR
#39
|
3/01/11
|
3/03/11
|
All Yards
|
Replace fence fabric screening with slats for safety reasons during
high wind events
|
VR
#56
|
4/13/11
|
4/20/11
|
Vincent North & Vincent South
|
Installation of temporary power poles to provide power to Vincent
North and Vincent South Material Yards
|
VR
#120
|
3/02/12
|
3/15/12
|
Vincent North
|
Access for pedestrian gate at Vincent North Yard
|
VR
#125
|
3/27/12
|
4/06/12
|
Vincent North & Vincent South
|
Additional power and associated disturbance areas needed at Vincent
North and Vincent South Material Yards
|
VR
#138
|
10/29/12
|
11/20/12
|
Vincent South
|
Expansion of the Vincent South Material Yard
|
MISCELLANEOUS
|
VR
#68
|
5/10/11
Revised 6/14/11
|
6/24/11
|
All
|
Allow continued use of approved TEWS access roads if nesting birds
subsequently move in
|
VR
#69
|
6/14/11
|
6/27/11
|
All
|
Variance to MM AQ-1d
|