VIII. ENERGY AND MINERAL RESOURCES

  1. The project is not energy consumptive. Minor amounts of fuel would be required for construction. A minor amount of electricity would be required for site lighting. The project would have no conflict with adopted energy conservation plans and no impact would occur. The project would have the beneficial impact of improving the reliability of electric power service.
  1. The project would use a variety of widely available non-renewable materials for construction of the facilities including aggregate, asphalt, iron and related minerals used in steel, mineral oil, and fuel to power construction vehicles and equipment. Long term operation would require only a minor amount of fuel for site inspection vehicles. Proposed construction and operation of the facility would not involve the wasteful use of non-renewable resources; no impact would occur.
  1. The site has no known mineral, oil, gas, geothermal or aggregate resources. The project would not affect the availability of these resources; no impact would occur.
TOP
Forward to Next Section
(Hazards)
Back to Previous Section
(Biological Resources)
Back to Vasona Substation Main Page PG&E Substation Projects Main Page CPUC Home Page