20-50 kW Workshop Report



Attached is the Workshop Report on 20-50 kW topics

The following attachments are also included:

AttachB.doc contains pre-workshop comments from all parties

AttachC.doc contains the meter cost data prepared by parties at the request
of the Energy Division

AttachD.doc contains the workshop sign-in list

Finally, we hope to hear from the Commission sometime next week regarding
whether the comment period will be shortened from 3 weeks to 2 weeks.  For
now, parties should assume they have 3 weeks to comment.

 <<AttachC.xls>>  <<AttachB.doc>>  <<AttachD.doc>>  <<20to50kW_Report.doc>> 