STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Southern California Edison's
Eldorado-Lugo-Mohave Series Capacitor Project

Application A.18-05-007, filed May 2, 2018

   
 

   
Proponent's Environmental Assessment

These files are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 10MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat.
VOLUME 1 (36MB)

Detailed Tables of Contents for Each Volume
Acronyms and Abbreviations

Chapter 1: PEA Summary
1.1 Project Components
1.2 Project Location
1.3 Project Needs and Alternatives
1.4 Agency Coordination
1.5 PEA Contents
1.6 PEA Conclusions
1.7 Public Outreach

Chapter 2: Project Purpose and Needs and Objectives
2.1 Overview
2.2 Project Objectives
2.3 References

Chapter 3: Project Description
3.1 Project Location
3.2 Existing System
3.3 Project Objectives
3.4 Proposed Project
3.5 Project Components
3.6 Right-of-Way Requirements
3.7 Construction
3.8 Operation and Maintenance
3.9 Applicant-Proposed Measures
3.10 Generator Interconnection Facilities Description
3.11 Generator Interconnection Facilities Construction
3.12 Other Major Components Description
3.13 Other Major Components Construction
3.14 Decommissioning
3.15 Project Alternatives Components Description
Attachment 3-A: Discrepancy Work Areas
Attachment 3-B: Tower Modifications Associated with Optical Ground Wire Installation
Attachment 3-C: Construction Equipment and Workforce Estimates

VOLUME 2


PART 1
(28MB)
Chapter 4: Environmental Impact Assessment Summary
4.0 Introduction
4.1 Aesthetics

Attachment 4.1-A:
Characterization Photographs (17MB)
Attachment 4.1-B: BLM Visual Contrast Rating Worksheets
Attachment 4.1-C: Visual Simulations (29MB)

PART 2 (10MB)
4.2 Agriculture and Forestry Resources
4.3 Air Quality
4.4 Biological Resources

PART 3 (11MB)
4.5 Cultural Resources
4.6 Geology and Soils
4.7 Greenhouse Gas Emissions
4.8 Hazards and Hazardous Materials

VOLUME 3


Chapter 4: Environmental Impact Assessment Summary
(cont.)

PART 1 (17MB)
4.9 Hydrology and Water Quality
4.10 Land Use and Planning

PART 2 - Section 4.10 Attachments (61MB)
Attachment 4.10-A: Existing Land Uses Within 1 Mile of the Proposed Project
Attachment 4.10-B: Relevant Land Use Plans and Policies Consistency Analysis
Attachment 4.10-C: General Plan Designations Within 1 Mile of the Proposed Project
Attachment 4.10-D: Zoning Designations Within 1 Mile of the Proposed Project

PART 3 (11MB)
4.11 Mineral Resources
4.12 Noise
4.13 Population and Housing
4.14 Public Services
4.15 Recreation
4.16 Transportation and Traffic
4.17 Utilities and Service Systems
4.18 Cumulative Analysis
4.19 Growth-Inducing Impacts

VOLUME 4


Chapter 5: Detailed Discussion of Significant Impacts
5.1 Applicant-Proposed Measures to Minimize Significant Effects
5.2 Description of Project Alternatives and Impact Analysis
5.3 Growth-Inducing Impacts
5.4 Suggested Applicant-Proposed Measures to Address GHG Emissions
5.5 Mandatory Findings of Significance
5.6 Irreversible and Irretrievable Commitment of Resources
5.7 References

Chapter 6: Other Process-Related Data Needs

VOLUME 5 - Appendices


Appendix A. California Environmental Quality Act Checklist
Appendix B. List of Preparers
Appendix C. Agency Consultation
Appendix D. Public Involvement
Appendix E. Detailed Route Map:  PART 1 (36MB)   PART 2 (28MB)
Appendix F. Air Quality Calculations

VOLUME 6
- Appendices (cont.)

Appendix G. Biological Resources Technical Report
Attachment A - Figures (33MB)
Attachment B - Special-Status Plant Species Survey Report (60MB)
Attachment C - Supplemental Special-Status Plant Species Survey Report
Attachment D - Least Bell's Vireo and Southwestern Willow Flycatcher Survey Report
Attachment E - Desert Tortoise Pre-Project Survey Report (38MB)
Attachment F - Addendum to the Desert Tortoise Pre-Project Survey Report
Attachment G - Second Addendum to the Desert Tortoise Pre-Project Survey Report
Attachment H - Preliminary Jurisdictional Delineation Report: PART 1 (53MB)  PART 2 (56MB)  PART 3 (60MB)
Attachment I - Supplemental Preliminary Jurisdictional Delineation Report (46MB)

VOLUME 7
- Appendices (cont.)

Appendix H. Cultural Resources Reports - Confidential
Appendix I. Hazardous Materials Records Search Results (25MB)


VOLUME 8
- Appendices (cont.)

Appendix J. Jurisdictional Delineation Maps (47MB)
Appendix K. Noise Technical Report
Appendix L. Traffic Study
Appendix M. Water Usage Study

   

This page contains tables and is best viewed with Firefox or Internet Explorer. Please report any problems to the Energy Division web coordinator.

   
 
Project Home Page - CPUC Environmental Information - CPUC Home