Variances

Approved Variances Summary Table Sorted by Variance No. (descending order)

Variance
Description
Date Approved
Variance 7&8 San Gabriel River Crossing.

04/30/99

Variance 6 Allow for suspension of the SFPP Carson to Norwalk Pipeline on the existing Sante Fe Avenue roadway bridge over Compton Creek, instead of boring under the creek, Los Angeles County.

04/19/99

Variance 5 Allow for open cut construction (rather than boring) at two locations

02/18/99

Variance 4 Allow for open cut construction (rather than boring) through the railroad track crossing on Victoria Street, Los Angeles County

02/11/99

Variance 3b Allow for open cut construction (rather than boring) through the intersection of Alondra Boulevard and Lakewood Boulevard, City of Bellflower

02/05/99

Variance 3a Open Cut Crossings at Five Locations

01/29/99

Variance 2 Allow for a two-spread construction scenario for the SFPP Carson to Norwalk Pipeline Project.

12/21/98

Variance 1 Relocation of the project pipeline through the City of Paramount 11/06/98