These files are in Portable Document Format (PDF).
To view them, you will need to download the free Adobe
Acrobat Reader if it is not already installed on your PC.
Note: For faster results in displaying the largest files
(files over 5.0MB are marked "large" below), right-click
the file's link, click "Save Target As" to download
the file to your hard drive, then double-click the downloaded file.
Except as noted with an asterisk (*), the following documents are
available at 28 libraries and offices
in the project area.
SDG&E Biological
Assessment (October 2008)*
USFWS Biological Opinion
(January 2009)* (large)
BLM Section
106 Programmatic Agreement letter*
Notices of Appeal
to the U.S. Department of Interior’s Office of Hearings & Appeals
at the Interior Board of Land Appeals:*
Perkins
Coie LLP on behalf of Viejas Band of Kumeyaay Indians (March 23,
2009)
Backcountry Against Dumps,
Protect Our Community Foundation, East County Community Action Coalition,
Donna Tisdale: Notice of
Appeal (March 23, 2009). Request
for a Stay (March 23, 2009)
Katheryn
Rhodes and Conrad Hartsell, M.D. (March 11, 2009)
Notice of Availability
for the Recirculated Draft EIR/EIS (July 8, 2008)
Notice of Additional
Public Participation Hearings, postcard (April 2008)
Notice of Availability
for the Draft EIR/EIS (January 3, 2008)
Comment letters received on
the Modified Route D Alternative from mid-June to October 2007
Comment letters received in
response to the May 16, 2007 Notice on the Modified Route D
Alternative*
CPUC/BLM Notice Regarding
an Additional EIR/EIS Alternative to the Proposed Sunrise Powerlink
Project (May 16, 2007)
Scoping Report, Part 2
(April 2, 2007)
Notice of Availability
for Scoping Report, Part 2
Notice Regarding
Conclusions on EIR/EIS Alternatives to the Proposed Sunrise Powerlink
Project (March 16, 2007)
Figure
1. Imperial Valley Link Alternatives
Figure 2.
Anza-Borrego Link Alternatives
Figure 3. Central
Link Alternatives
Figure 4.
Inland Valley Link Alternatives
Figure
5. Coastal Link Alternatives Retained
Figure
6. Coastal Link Alternatives Eliminated
Figure
7. Southwest Powerlink Alternatives
Notice of Second
Round of Scoping Meetings on Alternatives to the Proposed Sunrise
Powerlink Project (January 22, 2007)
Figure 1.
Sunrise Powerlink Project Overview
Figure 2. Imperial Valley
Link Alternatives
Figure 3. Anza-Borrego Link
Alternatives
Figure 4. Central Link Alternatives
Figure 5. Inland Valley Link
Alternatives
Figure 6. Coastal Link Alternatives
Retained
Figure 7. Coastal Link Alternatives
Eliminated
Figure 8. Southwest Powerlink
Alternatives
Figure 9. Non-Wires Alternatives
Figure 10. System Alternatives
Scoping Report, Part 1
(November 29, 2006)
Notice of Availability for
Scoping Report, Part 1 (November 2006)
Notice of Preparation
(NOP) (September 15, 2006)
Figure 1.
Proposed Project Overview
Figure 2. Imperial Valley
Link
Figure 3. Anza-Borrego Link
Figure 4A. Central Link
Figure 4B. Proposed Central
East Substation
Figure 5A. Inland Valley
Link
Figure 5B. Detail of Ramona
Area
Figure 6A. Coastal Link
Figure 6B. Rancho Peñasquitos
Detail
Figure 7. SDG&E Alternatives
Fully Evaluated and Carried Forward in PEA
Figure 8. SDG&E Alternatives
Considered and Eliminated
Notice of Intent
(August 31, 2006)
SDG&E's
Application and Proponent's Environmental Assessment (August 4,
2006).
|