Tables

Table 3-1. Right-of-Way Miles and Construction Methods - Point Arena to Sacramento download a PDF

Table 3-2. Right-of-Way Miles and Construction Methods - Sacramento to the California/Nevada Border download a PDF

Table 3-3. Right-of-Way Miles and Construction Methods - San Francisco to Santa Clara download a PDF

Table 3-4. Right-of-Way Miles and Construction Methods - Pittsburg to Sacramento download a PDF

Table 3-5. Right-of-Way Miles and Construction Methods - San Luis Obispo to Bakersfield download a PDF

Table 3-6. Right-of-Way Miles and Construction Methods - San Luis Obispo to Los Osos Loop download a PDF

Table 3-7. Right-of-Way Miles and Construction Methods - Riverside to the California/Arizona Border download a PDF

Table 3-8. Right-of-Way Miles and Construction Methods - Los Angeles to Riverside download a PDF

Table 3-9. Right-of-Way Miles and Construction Methods - Los Angeles to Anaheim download a PDF

Table 4.III-1. Ambient Air Quality Standards Applicable in California download a PDF

Table 4.III-2. California Air Basins and Local Air Districts Crossed by the Project Routes download a PDF

Table 4.III-3. Air Quality Requirement Attainment Status by Pollutant and Air Basin download a PDF

Table 4.IV-1. Vegetation, Wetland, and Wildlife Field Surveys Conducted for Each Project Route download a PDF

Table 4.IV-2. Noxious Weed Species of Concern download a PDF

Table 4.V-1. Paleontological Sensitivity of Geologic Units Potentially Occurring in the Project Study Area download a PDF

Table 4.VIII-1. Beneficial Uses of Major Waterbodies along the Project Routes download a PDF

Table 4.XI-1. Maximum Allowable Ambient Noise Exposure for Various Land Uses download a PDF

Table 5-1. Sensitive or Protected Resources Identified at the Regenerator/OP-AMP Station Sites during Field Surveys and Site Visits download a PDF

Table 5.III-1. Construction Emission Offset Significance Thresholds download a PDF

Table 5.III-2. Estimated Construction Emissions Associated with Typical Fiber Optic Cable Installation Projects download a PDF

Table 5.III-3. Operational Emissions Associated with a 255-hp Diesel Generator download a PDF

Table 5.XI-1. Summary of Construction Noise Sources download a PDF

Table 5.XI-2. Estimated Noise in the Vicinity of an Active Construction Site download a PDF