Draft 7 of Qualifications and Installations
-
Subject: Draft 7 of Qualifications and Installations
-
From: Michele Wynne <mwynne@uoc.com>
-
Date: Fri, 08 May 1998 00:57:41 -0700
Attached are the lastest versions of Sections 1 (Meter Worker
Qualifications) and 2 (Meter Installations).
There are three issues to be reviewed at the May 13th meeting.
1. A new Section I.D on the administration of the meter worker
qualification process.
2. A revised Section I.E with a new look at joint meets in relation to PSWG
proposals.
3. The suggestion in section II.D that installation procedures be developed
for NEW meters.
I plan to spend most of the meeting discussing items 1 and 3 above.
Michele Wynne
310.643.4416
MS Word file
RTF file
MS Word file
RTF file