Attached are copies of the final draft of Sections 3 (Meter Maintenance), 4 (Meter Testing) and 5 (Meter Calibration). At the May 13 PSWG Group 4 Meter Installation, etc. meeting these sections will be approved for submittal to the Plenary. Michele Wynne 310.643.4416