STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

PG&E
Proposed Jefferson-Martin 230 kV Transmission Project

(Application No. A-02-09-043, filed September 30, 2002)

   

Application and Proponent's Environmental Assessment

These files are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC.
 
Application
Errata to Application Exhibit F
Chapter 1—Executive Summary
Chapter 2—Project Description
  Chapter 2 Figures
2-1 Regional Project Location
2-2 Existing Transmission System Within Vicinity of Project Area
2-3 North of San Mateo - Historical Forecast Summer Peak Demand (in main file)
2-4 Results Analysis of Three Load Forecast Scenarios (in main file)
2-5 Cumulative Probability of Need for Jefferson-Martin 230 kV Project (in main file)
2-6 Proposed Transmission Line Route, Proposed Transition Station Location, and Existing Substations with Proposed Modifications
2-7 Typical Heavy Angle Lattice Steel Tower
2-8 Typical Tangent Lattice Steel Tower
2-9 Typical Tangent Tubular Steel Pole
2-10 Typical Duct Bank Installation of 230 kV Single Circuit Solid Dielectric Cable
2-11 Typical Reduced Height Duct Bank Within Paved Streets (in Areas with Depth Restrictions)
2-12 Typical Reduced Width Duct Bank Within Paved Streets (in Areas with Depth Restrictions)
2-13 Typical Underground Construction Process within Roadways
2-14 Transition Station
2-15 Jefferson Substation Proposed Modifications
2-16 Martin Substation Proposed Modifications
2-17 Project Schedule
Chapter 3—Alternatives to the Proposed Project
  Chapter 3 Figures
3-1 Proposed and Alternative Routes
Chapter 4—Impact Assessment Summary
Chapter 5—Land Use, Recreation, and Agricultural Resources
  Chapter 5 Figures
5-1 General Plan Land Use Designation for Segment 1
5-2 General Plan Land Use Designations for Segments 2, 3, 4, and 5
5-3 Existing Land Use—PG&E Jefferson-Martin Project (Maps 1-11):
  Map 1   Map 2   Map 3   Map 4   Map 5   Map 6   Map 7   Map 8   Map 9   Map 10   Map 11
Chapter 6—Biology
  Chapter 6 Additional Tables
6-1 Summary of Vegetation Types Present by Project Element for the Overhead Portion of the PG&E Jefferson-Martin 230 kV Transmission Project
6-4 Potential for Special Status Wildlife Species to Occur within the Jefferson-Martin 230 kV Transmission Line Project Area
6-5 Evaluation of Impacts to Special Status Wildlife Species within the Jefferson-Martin 230 kV Transmission Line Project Area
  Chapter 6 Figures
6-1 Location of Water Drainages and Potential Wetlands
Chapter 7—Cultural Resources
Chapter 8—Visual Resources
  Chapter 8 Figures
8-1 Landscape Features
8-2 Photo Viewpoint Locations
8-3 Photographs of Project Route and Surroundings
(19 pages, one file)
8-4 thru 8-21 Existing Views and Visual Simulations
(18 items, one file)
Chapter 9—Hydrology and Water Quality
  Chapter 9 Figures
9-1 Major Surface Waterbodies and Watersheds
9-2 Floodplains and Flood Inundation
9-3 Colma Creek Flood Plain
9-4 Crystal Springs Dam Inundation Area
9-5 Groundwater Basins
Chapter 10—Geology and Mineral Resources
  Chapter 10 Figures
10-1 Mapped Faults in Project Vicinity, Segment 1
10-2 Mapped Faults in Project Vicinity, Segments 2, 3, 4, and 5
Chapter 11—Hazards and Hazardous Materials
Chapter 12—Population and Housing, Public Services, and Utilities and Service Systems
  Chapter 12 Figures
12-1 Public Services Within the Vicinity of the Proposed Project
Chapter 13—Transportation/Traffic
Chapter 14—Air Quality
Chapter 15—Noise
  Chapter 15 Figures
15-1 Noise Monitoring Locations and Sensitive Receptor Locations
15-2 Martin Substation Isophonic Distribution Before Modifications (in main file)
15-3 Martin Substation Isophonic Distribution After Modifications (in main file)
Chapter 16—Corona and Induced Current Effects
Chapter 17—Cumulative Impacts
Chapter 18—Growth-Inducing Effects
Chapter 19—Mitigation Monitoring Plan

Appendices
A. Project Description and Engineering Information:
  A-1.  Construction Methods Report Table
  A-2.  Tower List
  A-3.  Cable-Pulling Sites Table
  A-4.  Agency Consultation
  A-5.  Supplementary Guide for Application of the Criteria for San Francisco
  A-6.  Load Serving Capability Forecasts
B. Biological Resources:
  B-1.  Tree Ordinances: San Mateo County and Town of Hillsborough
  B-2.  Town of Hillsborough Tree Removal Guidelines
  B-3.  Location of Special-Status Species Observed During Species Surveys:
    - Figure: California Red-Legged Frog Habitat Assessment & Survey Results
    - Figure: Known Occurrences of Special Status Species
  B-4.  Vertebrate Species Detected During Biological Surveys
  B-5.  Vegetation Types Present Within the Tower Study Areas for the Overhead Portion of the PG&E Jefferson-Martin 230 kV Transmission Project
  B-6.  Vegetation Types Present Within the Cable Pulling Sites for the Overhead Portion of the PG&E Jefferson-Martin 230 kV Transmission Project
  B-7.  Vegetation Types Present Within the Proposed Access Roads and Temporary Bridge for the Overhead Portion of the PG&E Jefferson-Martin 230 kV Transmission Project
  B-8.  Potentially Jurisdictional Wetlands and Other Aquatic Resources for the Overhead Portion of the PG&E Jefferson-Martin 230 kV Transmission Project
  B-9.  Potentially Jurisdictional Wetlands and Other Aquatic Resources within the Underground Portion of the PG&E Jefferson-Martin 230 kV Transmission Project
  B-10.  Impacts to Potentially Jurisdictional Wetlands and Other Aquatic Resources for the Overhead Portion of the PG&E Jefferson-Martin 230 kV Transmission Project
  B-11.  Impacts to Potentially Jurisdictional Wetlands and Other Aquatic Resources within the Underground Portion of the PG&E Jefferson-Martin 230 kV Transmission Project
  B-12.  Erosion Control and Restoration Plan for Disturbed Areas of the San Francisco 230 kV Transmission Line
  B-12 - Photographs 1-26
C. Cultural Resources:
  C-1.  Supplemental Information
  C-2.  Proposed Native American Burial Protection Plan
D. Visual Resources:
  D-1.  Visual Character Photo Inventory
  D-2.  Filoli Estate Map
  D-3.  Visual Simulation Methods
E. Hazards and Hazardous Materials:
  E-1.  EDR Report Executive Summary
  E-2.  EDR Focus Maps
  E-3.  Table 1 - List of Significant Sites
  E-4.  Table 2 - Agency Abbreviations for List of Significant Sites
F. Corona and Induced-Current Effects
G. Cumulative Impacts
H. List of Preparers
I. Affected Property Owners
J. Glossary
 

This page contains tables and is best viewed with Netscape or Internet Explorer. Please report any problems to the Energy Division web coordinator.

   
 
Project Home Page - Project Area & Map
 
CPUC Environmental Information - CPUC Home