STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

San Diego Gas & Electric Company's Sunrise Powerlink Project

(Applications A.05-12-014 and A.06-08-010)

   
 

   
Recirculated Draft Environmental Impact Report / Supplemental Draft Environmental Impact Statement


These files are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For faster results in displaying the largest files (see sizes in parentheses below for files over 3.0MB), right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file.
Notice of Availability
Fig. 1. Overview of La Rumorosa Wind Options
Fig. 2. Environmentally Superior Northern Alternative and Modified Environmentally Superior Southern Alternative
1. Introduction
1.1. Legal Requirements for Recirculating or Supplementing a Draft EIR/EIS
1.2. Analysis Included in this Recirculated Draft EIR/Supplemental Draft EIS
1.3. Analysis Not Included in this Recirculated Draft EIR/Supplemental Draft EIS
2. Sempra Presidential Permit and Related Facilities
2.1. Description of Sempra and SDG&E Components
2.2. Biological Resources
2.3. Visual Resources
2.4. Land Use
2.5. Wilderness and Recreation
2.6. Agriculture
2.7. Cultural and Paleontological Resources
2.8. Noise
2.9. Transportation and Traffic
2.10. Public Health and Safety
2.11. Air Quality
2.12. Water Resources
2.13. Geology, Mineral Resources, and Soils
2.14. Socioeconomics, Services, and Utilities
2.15. Fire and Fuels Management
2.16. References
Fig. 2-1. Overview of La Rumorosa Wind Options
Fig. 2-2. Revised SDG&E Jacumba Substation
Fig. 2-3. Sempra Rumorosa Wind Energy Projects and Baja Wind Transmission
Fig. 2-4. New SDG&E 69 kV Transmission Line and Expanded Boulevard Substation
Fig. 2-5. Jacumba Substation: Preliminary General Arrangement
Fig. 2.3-1. SDG&E 69 kV Transmission Line Key Viewpoints
Fig. 2.3-2. Key Viewpoint 79: Old Highway 80 - Existing View (3.7MB)
Fig. 2.3-3. Key Viewpoint 80: Jacumba - Visual Simulation
Fig. 2.3-4. Key Viewpoint 81: Tule Jim Lane - South - Existing View (3.2MB)
Fig. 2.3-4A. SDG&E 69 kV Transmission Line Mitigation Options
Fig. 2.3-5A. Key Viewpoint 82: Old Highway 80 - Existing View
Fig. 2.3-5B. Key Viewpoint 82: Old Highway 80 - Simulation
Fig. 2.3-6. Key Viewpoint 83: Hill Street in Jacumba - Existing View (3.1MB)
Fig. 2.3-7A. Key Viewpoint 84: Table Mountain - Existing View (3.4MB)
Fig. 2.3-7B. Key Viewpoint 84: Table Mountain - Simulation (3.4MB)
Fig. 2.3-8. Key Viewpoint 85: Elliot Mine Area - Existing View (3.7MB)
Fig. 2.3-9. White Star Communication Site - Existing View
Visual Summary Table
3. Revisions to Proposed and Alternative Transmission Line Routes
3.1. Reroutes on the Proposed Project Route
3.2. Reroutes on Northern Route Alternatives
3.3. Reroutes on Southern Route Alternatives

Fig. 3-1. Proposed Project: BLM Gifted Lands Reroute
Fig. 3-2. Proposed Project: Northern Grapevine Canyon Reroute (9.8MB)
Fig. 3-3. Top of the World Substation Alternative Revision (4.1MB)
Fig. 3-4. Santa Ysabel Partial Underground Alternative Revision (3.7MB)
Fig. 3-4A. Santa Ysabel Partial Underground Alternative Revision: Southern Transition Relocation (3.1MB)
Fig. 3-5. Coastal Link System Upgrades Alternative Revision (4.0MB)
Fig. 3-6. Interstate 8 Alternative: Jacumba SWPL Breakaway Point Reroute
Fig. 3-7. Interstate 8 Alternative: BCD Alternative and BCD South Option Revisions
Fig. 3-8. Interstate 8 Alternative: High Meadows Reroute (6.9MB)
Fig. 3-9. Interstate 8 Alternative: Highway 67 Hansen Quarry Reroute (5.5MB)
Fig. 3-10. Modified Route D Alternative: Cameron Reroute
Fig. 3-11. Modified Route D Alternative: PCT Reroute (5.7MB)
Fig. 3-12. Modified Route D Alternative: Western Reroute (3.3MB)
Fig. 3-13. Modified Route D Alternative: Star Valley Option Revision
4. Other Modifications to the Draft EIR/EIS
4.1. Revisions to Cultural Resources Impact Analysis
4.2. Revision to In-Basin Renewable Generation Alternative (SDCPP Component)
4.3. Expanded Workspace for Interstate 8 Alternative
4.4. References

Fig. 4-1. New In-Area All-Source Generation Alternative, San Diego Community Power Project
5. Environmentally Superior Alternatives
5.1. Environmentally Superior Northern Route
5.2. Environmentally Superior Southern Route
5.3. Route Configurations Suggested in Comments on the Draft EIR/EIS

Fig. 5-1. Environmentally Superior Northern Alternative and Modified Environmentally Superior Southern Alternative
Fig. 5-2. SDG&E Enhanced Northern Route and UCAN Modified Southern Route

Appendices
Appendix 1. La Rumorosa Wind Development Project and Jacumba Substations
Description of SCE La Rumorosa Wind Project
Impact Analysis for SCE La Rumorosa Wind Project
Description of Jacumba Substation
Impact Analysis for Jacumba Substation

Fig. B-48
. Indirect Action: La Rumorosa Wind Project (3.9MB)
Fig. B-49. Indirect Action: Border Region Wind Power
Fig. B-50. Indirect Action: Views from La Rumorosa
Fig. B-47. Jacumba Substation
Appendix 2. Excerpts from Comment Letters
A0006 Campo Kumeyaay Nation
A0009 USDA Forest Service
A0011 Padre Dam Municipal Water District
A0015 Rincon Band of Luiseño Indians
A0019 La Jolla Band of Luiseño Indians
A0025 City of Santee
A0028 City Attorney, City of San Diego
B0006 Mussey Grade Road Alliance
B0011 Utility Consumers Action Network
B0012 Powers Engineering
B0041 Center for Biological Diversity & Sierra Club
B0046 EnviroMINE
E0003-E0004 SDG&E
   

This page contains tables and is best viewed with Firefox or Internet Explorer. Please report any problems to the Energy Division web coordinator.

   
 
Project Home Page - CPUC Environmental Information - CPUC Home