STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Southern California Edison's
West of Devers Upgrade Project

(Application A.13-10-20, filed October 25, 2013)

   
 

   
Draft Environmental Impact Report / Environmental Impact Statement

These files are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB) and for all .zip archives shown, right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat.
Cover Letter
Cover
Title Page
Table of Contents
Executive Summary (15.2MB)
ES.1 Introduction/Background
ES.2 Summary of Public Involvement Activities
ES.3 Alternatives
ES.4 Summary of Impacts
ES.5 Cumulative Scenario and Impacts
ES.6 Summary Comparison of the Proposed Project and Alternatives
ES.7 Impact Summary Tables for CEQA Impact Significance
Figure ES-1. Proposed Project and Project Vicinity
Figure ES-2. Alternatives Retained
Figure ES-3a. Route Alternatives Eliminated
Figure ES-3b. System Alternatives Eliminated
Figure ES-3c. Alternatives Considered but Not Screened for EIR/EIS Analysis
Figure ES-4a. No Project Alternative Option 1 (8.8MB)
Figure ES-4b. No Project Alternative Option 2
Figure ES-5. Environmentally Superior Alternative
A. Introduction
A.1 History and Overview of Proposed Project
A.2 Purpose and Need for the Proposed Project
A.3 Definition of Connected Actions and Related Projects
A.4 Agency Use of This Document
A.5 Reader's Guide to This EIR/EIS
A.6 References
B. Description of the Proposed Project (11.6MB)
B.1 Introduction and Overview
B.2 Description of Proposed Project Components
B.3 Construction of Proposed Project
B.4 Operations and Maintenance
B.5 Electric and Magnetic Fields Management
B.6 Applicant Proposed Measures
B.7 Connected Actions
B.8 References
Figure B-1. Proposed Project and Project Vicinity
Figure B-2a. Proposed Transmission Line Route - Segment 1
Figure B-2b. Existing and Proposed Corridor Profile - Segment 1
Figure B-3a. Proposed Transmission Line Route - Segment 2
Figure B-3b. Existing and Proposed Corridor Profile - Segment 2
Figure B-4a. Proposed Transmission Line Route - Segment 3
Figure B-4b. Existing and Proposed Corridor Profile - Segment 3
Figure B-5a. Proposed Transmission Line Route - Segment 4
Figure B-5b. Existing and Proposed Corridor Profile - Segment 4
Figure B-6a. Proposed Transmission Line Route - Segment 5
Figure B-6b. Existing and Proposed Corridor Profile - Segment 5
Figure B-6c. Existing and Proposed Corridor Profile - Segment 5
Figure B-7a. Proposed Transmission Line Route - Segment 6
Figure B-7b. Existing and Proposed Corridor Profile - Segment 6
Figure B-8. Existing and Proposed 220 kV Configuration
Figure B-9a. Photos of Existing West of Devers Corridor - Segments 1 and 2
Figure B-9b. Photos of Existing West of Devers Corridor - Segments 3 and 4
Figure B-9c. Photos of Existing West of Devers Corridor - Segments 5 and 6
Figure B-10. Typical 220 kV Transmission Structures
Figure B-11a. Existing Substation Locations
Figure B-11b. Existing Devers Substation Boundary
Figure B-11c. Existing El Casco Substation Boundary
Figure B-11d. Existing Vista Substation Boundary
Figure B-11e. Existing San Bernardino Substation Boundary
Figure B-11f. Existing Etiwanda Substation Boundary
Figure B-11g. Existing Timoteo Substation Boundary
Figure B-11h. Existing Tennessee Substation Boundary
Figure B-12. 220 kV Substation Profile
Figure B-13. Proposed Relocated Subtransmission and Distribution Line Route
Figure B-14a. Typical 66 kV Tubular Steel Pole Structures
Figure B-14b. Typical Light-Weight Steel and Wood Poles
Figure B-15a. Proposed Telecommunication Routes - Sheet 1 of 5
Figure B-15b. Proposed Telecommunication Routes - Sheet 2 of 5
Figure B-15c. Proposed Telecommunication Routes - Sheet 3 of 5
Figure B-15d. Proposed Telecommunication Routes - Sheet 4 of 5
Figure B-15e. Proposed Telecommunication Routes - Sheet 5 of 5
Figure B-16. Proposed Staging Yard Locations
Figure B-17. Typical Retaining and Mechanically Stabilized Earth Walls
Figure B-18. Typical Shoo-Fly Structures
Figure B-19. Typical Subtransmission Duct Bank
Figure B-20. Typical Subtransmission Vault
Figure B-21. Typical Distribution Duct Bank
Figure B-22. Typical Distribution Vault
Figure B-23. Typical Telecommunications Duct Bank
Figure B-24. Typical Manhole Design
Figure B-25. Palen Solar Power Project
Figure B-26. Desert Harvest Solar Project
Figure B-27. Blythe Mesa Solar Project
C. Alternatives (3.4MB)
C.1 Alternatives Development and Screening Process
C.2 Alternatives Screening Methodology
C.3 Summary of Screening Results
C.4 Alternatives Evaluated in this EIR/EIS
C.5 Alternatives Eliminated from Full EIR/EIS Evaluation
C.6 No Project / No Action Alternative
C.7 References
Figure C-1. Alternatives Retained
Figure C-2a. Route Alternatives Eliminated
Figure C-2b. System Alternatives Eliminated
Figure C-2c. Alternatives Considered but Not Screened for EIR/EIS Analysis
Figure C-3. Tower Relocation Alternative
Figure C-4. Iowa Street 66 kV Alternative
Figure C-5. Phased Build Alternative
Figure C-6a. No Project/No Action Alternative Option 1 (7.9MB)
Figure C-6b. No Project/No Action Alternative Option 2
D.1 Introduction to Environmental Analysis
D.1.1 Organization of Each Section
D.1.2 Alternatives
D.1.3 CEQA and NEPA Requirements
D.1.4 Impact Analysis and Mitigation Measures
D.1.5 Analysis of Connected Actions
D.1.6 Cumulative Impact Assessment
D.1.7 Other CEQA and NEPA Requirements
D.2 Agriculture (3.6MB)
D.2.1 Environmental Setting / Affected Environment
D.2.2 Applicable Regulations, Plans, and Standards
D.2.3 Environmental Impacts of the Proposed Project
D.2.4 Environmental Impacts of Project Alternatives
D.2.5 Environmental Impacts of No Project / No Action Alternative
D.2.6 Mitigation Monitoring, Compliance, and Reporting
D.2.7 References
Figure D.2-1a. Farmland in Project Corridor, Segment 1
Figure D.2-1b. Farmland in Project Corridor, Segment 2
Figure D.2-1c. Farmland in Project Corridor, Segment 3
Figure D.2-1d. Farmland in Project Corridor, Segment 3 & 4
Figure D.2-1e. Farmland in Project Corridor, Segment 4
Figure D.2-1f. Farmland in Project Corridor, Segment 4
Figure D.2-1g. Farmland in Project Corridor, Segment 4 & 5
Figure D.2-1h. Farmland in Project Corridor, Segment 4 & 5
Figure D.2-1i. Farmland in Project Corridor, Segment 5
Figure D.2-1j. Farmland in Project Corridor, Segment 6
Figure D.2-1k. Farmland in Project Corridor, Segment 6
D.3 Air Quality
D.3.1 Environmental Setting / Affected Environment
D.3.2 Applicable Regulations, Plans, and Standards
D.3.3 Environmental Impacts of the Proposed
D.3.4 Environmental Impacts of Project Alternatives
D.3.5 Environmental Impacts of No Project / No Action Alternative
D.3.6 Mitigation Monitoring, Compliance, and Reporting
D.3.7 References
Figure D.3-1. Federal Ozone Nonattainment and Class 1 Areas
D.4 Biological Resources - Vegetation
D.4.1 Environmental Setting / Affected Environment
D.4.2 Applicable Regulations, Plans, and Standards
D.4.3 Environmental Impacts of the Proposed Project
D.4.4 Environmental Impacts of Project Alternatives
D.4.5 Environmental Impacts of No Project / No Action Alternative
D.4.6 Mitigation Monitoring, Compliance, and Reporting
D.4.7 References
D.5 Biological Resources - Wildlife
D.5.1 Environmental Setting / Affected Environment
D.5.2 Applicable Regulations, Plans, and Standards
D.5.3 Environmental Impacts of the Proposed
D.5.4 Environmental Impacts of Project Alternatives
D.5.5 Environmental Impacts of No Project / No Action Alternative
D.5.6 Mitigation Monitoring, Compliance, and Reporting
D.5.7 References
D.6 Climate Change
D.6.1 Environmental Setting / Affected Environment
D.6.2 Applicable Regulations, Plans, and Standards
D.6.3 Environmental Impacts of the Proposed Project
D.6.4 Environmental Impacts of Project Alternatives
D.6.5 Environmental Impacts of No Project / No Action Alternative
D.6.6 Mitigation Monitoring, Compliance, and Reporting
D.6.7 References
D.7 Cultural Resources
D.7.1 Environmental Setting / Affected Environment
D.7.2 Applicable Regulations, Plans, and Standards
D.7.3 Environmental Impacts of the Proposed Project
D.7.4 Environmental Impacts of Project Alternatives
D.7.5 Environmental Impacts of No Project / No Action Alternative
D.7.6 Mitigation Monitoring, Compliance, and Reporting
D.7.7 References
D.8 Socioeconomics and Environmental Justice
D.8.1 Environmental Setting / Affected Environment
D.8.2 Applicable Regulations, Plans, and Standards
D.8.3 Environmental Impacts of the Proposed Project
D.8.4 Environmental Impacts of Project Alternatives
D.8.5 Environmental Impacts of No Project / No Action Alternative
D.8.6 Mitigation Monitoring, Compliance, and Reporting
D.8.7 References
Figure D.8-1. Census Tracts Used in Socioeconomic Analysis
Figure D.8-2. Census Tracts Meeting Environmental Justice Criteria
D.9 Geology and Soils (4.0MB)
D.9.1 Environmental Setting / Affected Environment
D.9.2 Applicable Regulations, Plans, and Standards
D.9.3 Environmental Impacts of the Proposed Project
D.9.4 Environmental Impacts of Project Alternatives
D.9.5 Environmental Impacts of No Project / No Action Alternative
D.9.6 Mitigation Monitoring, Compliance, and Reporting
D.9.7 References
Figure D.9-1. Geologic Map
Figure D.9-2. Soil Distribution
Figure D.9-3. Active Faults and Historic Earthquakes
Figure D.9-4a. Segment 1 Fault Crossings
Figure D.9-4b. Segment 2 Fault Crossings
Figure D.9-4c. Segment 3 Fault Crossings
Figure D.9-4d. Segment 4 Fault Crossings
Figure D.9-4e. Segment 5 Fault Crossings
Figure D.9-4f. Segment 6 Fault Crossings
D.10 Hazards and Hazardous Materials
D.10.1 Environmental Setting / Affected Environment
D.10.2 Applicable Regulations, Plans, and Standards
D.10.3 Environmental Impacts of the Proposed Project
D.10.4 Environmental Impacts of Project Alternatives
D.10.5 Environmental Impacts of No Project / No Action Alternative
D.10.6 Mitigation Monitoring, Compliance, and Reporting
D.10.7 References
D.11 Land Use and BLM Realty (6.6MB)
D.11.1 Environmental Setting / Affected Environment
D.11.2 Applicable Regulations, Plans, and Standards
D.11.3 Environmental Impacts of the Proposed Project
D.11.4 Environmental Impacts of Project Alternatives
D.11.5 Environmental Impacts of No Project / No Action Alternative
D.11.6 Mitigation Monitoring, Compliance, and Reporting
D.11.7 References
Figure D.11-1a. General Plan Land Use, Segment 1
Figure D.11-1b. General Plan Land Use, Segment 2
Figure D.11-1c. General Plan Land Use, Segment 3
Figure D.11-1d. General Plan Land Use, Segments 3 & 4
Figure D.11-1e. General Plan Land Use, Segment 4
Figure D.11-1f. General Plan Land Use, Segment 4
Figure D.11-1g. General Plan Land Use, Segments 4 & 5
Figure D.11-1h. General Plan Land Use, Segments 4 & 5
Figure D.11-1i. General Plan Land Use, Segment 5
Figure D.11-1j. General Plan Land Use, Segment 6
Figure D.11-1k. General Plan Land Use, Segment 6
Figure D.11-2a. Zoning, Segment 1
Figure D.11-2b. Zoning, Segment 2
Figure D.11-2c. Zoning, Segment 3
Figure D.11-2d. Zoning, Segment 3 & 4
Figure D.11-2e. Zoning, Segment 4
Figure D.11-2f. Zoning, Segment 4
Figure D.11-2g. Zoning, Segment 4 & 5
Figure D.11-2h. Zoning, Segment 4 & 5 (7.7MB)
Figure D.11-2i. Zoning, Segment 5
Figure D.11-2j. Zoning, Segment 6 (13.0MB)
Figure D.11-2k. Zoning, Segment 6 (5.7MB)
D.12 Mineral Resources
D.12.1 Environmental Setting / Affected Environment
D.12.2 Applicable Regulations, Plans, and Standards
D.12.3 Environmental Impacts of the Proposed Project
D.12.4 Environmental Impacts of Project Alternatives
D.12.5 Environmental Impacts of No Project / No Action Alternative
D.12.6 Mitigation Monitoring, Compliance, and Reporting
D.12.7 References
D.13 Noise
D.13.1 Environmental Setting / Affected Environment
D.13.2 Applicable Regulations, Plans, and Standards
D.13.3 Environmental Impacts of the Proposed Project
D.13.4 Environmental Impacts of Project Alternatives
D.13.5 Environmental Impacts of No Project / No Action Alternative
D.13.6 Mitigation Monitoring, Compliance, and Reporting
D.13.7 References
Figure D.13-1. Noise Monitoring Locations
D.14 Paleontological Resources
D.14.1 Environmental Setting / Affected Environment
D.14.2 Applicable Regulations, Plans, and Standards
D.14.3 Environmental Impacts of the Proposed Project
D.14.4 Environmental Impacts of Project Alternatives
D.14.5 Environmental Impacts of No Project / No Action Alternative
D.14.6 Mitigation Monitoring, Compliance, and Reporting
D.14.7 References
D.15 Recreation (10.5MB)
D.15.1 Environmental Setting / Affected Environment
D.15.2 Applicable Regulations, Plans, and Standards
D.15.3 Environmental Impacts of the Proposed Project
D.15.4 Environmental Impacts of Project Alternatives
D.15.5 Environmental Impacts of No Project / No Action Alternative
D.15.6 Mitigation Monitoring, Compliance, and Reporting
D.15.7 References
Figure D.15-1a. Recreational Resources, Segment 1
Figure D.15-1b. Recreational Resources, Segment 2
Figure D.15-1c. Recreational Resources, Segment 3
Figure D.15-1d. Recreational Resources, Segment 3 & 4
Figure D.15-1e. Recreational Resources, Segment 4
Figure D.15-1f. Recreational Resources, Segment 4
Figure D.15-1g. Recreational Resources, Segment 4 & 5
Figure D.15-1h. Recreational Resources, Segment 4 & 5
Figure D.15-1i. Recreational Resources, Segment 5
Figure D.15-1j. Recreational Resources, Segment 6
Figure D.15-1k. Recreational Resources, Segment 6 (5.7MB)
D.16 Transportation and Traffic
D.16.1 Environmental Setting / Affected Environment
D.16.2 Applicable Regulations, Plans, and Standards
D.16.3 Environmental Impacts of the Proposed Project
D.16.4 Environmental Impacts of Project Alternatives
D.16.5 Environmental Impacts of No Project / No Action Alternative
D.16.6 Mitigation Monitoring, Compliance, and Reporting
D.16.7 References
D.17 Utilities and Public Services
D.17.1 Environmental Setting / Affected Environment
D.17.2 Applicable Regulations, Plans, and Standards
D.17.3 Environmental Impacts of the Proposed Project
D.17.4 Environmental Impacts of Project Alternatives
D.17.5 Environmental Impacts of No Project / No Action Alternative
D.17.6 Mitigation Monitoring, Compliance, and Reporting
D.17.7 References
D.18 Visual Resources (21.7MB)
D.18.1 Environmental Setting / Affected Environment
D.18.2 Applicable Regulations, Plans, and Standards
D.18.3 Environmental Impacts of the Proposed Project
D.18.4 Environmental Impacts of Project Alternatives
D.18.5 Environmental Impacts of No Project / No Action Alternative
D.18.6 Mitigation Monitoring, Compliance, and Reporting
D.18.7 References
Figure D.18-1. Viewshed Analysis Segment 1
Figure D.18-2. Viewshed Analysis Segment 2
Figure D.18-3. Viewshed Analysis Segment 3
Figure D.18-4. Viewshed Analysis Segment 4
Figure D.18-5. Viewshed Analysis Segment 5
Figure D.18-6. Viewshed Analysis Segment 6
Figure D.18-7A. Linear Viewpoint Map - Interstate 10 - West
Figure D.18-7B. Linear Viewpoint Map - Interstate 10 - East
Figure D.18-7C. Linear Viewpoint Map - San Timoteo Canyon
Figure D.18-8A. KOP 1 - Mission Road at ROW - Existing View
Figure D.18-8B. KOP 1 - Mission Road at ROW - Visual Simulation
Figure D.18-9A. KOP 2 - Canyon Vista Drive - Existing View
Figure D.18-9B. KOP 2 - Canyon Vista Drive - Visual Simulation
Figure D.18-9C. KOP 2 - Canyon Vista Drive - Visual Simulation
Figure D.18-10A. KOP 3 - Pilgrim Road - Existing View
Figure D.18-10B. KOP 3 - Pilgrim Road - Visual Simulation
Figure D.18-11A. KOP 4 - San Timoteo Canyon Road - Existing Road
Figure D.18-11B. KOP 4 - San Timoteo Canyon Road - Visual Simulation
Figure D.18-11C. KOP 4 - San Timoteo Canyon Road - Visual Simulation
Figure D.18-12A. KOP 5 - Boros Boulevard - Existing View
Figure D.18-12B. KOP 5 - Boros Boulevard - Visual Simulation
Figure D.18-13A. KOP 6 - Stetson Community Park - Existing View
Figure D.18-13B. KOP 6 - Stetson Community Park - Visual Simulation
Figure D.18-14A. KOP 7 - Solera Oakmont Clubhouse - Existing View
Figure D.18-14B. KOP 7 - Solera Oakmont Clubhouse - Visual Simulation
Figure D.18-15A. KOP 8 - The Estates - Existing View
Figure D.18-15B. KOP 8 - The Estates - Visual Simulation
Figure D.18-16A. KOP 9 - Cedar Hollow Road - Existing View
Figure D.18-16B. KOP 9 - Cedar Hollow Road - Visual Simulation
Figure D.18-17A. KOP 10 - Bluff Street - Existing View
Figure D.18-17B. KOP 10 - Bluff Street - Visual Simulation
Figure D.18-18A. KOP 11 - Hathaway Street - Existing View
Figure D.18-18B. KOP 11 - Hathaway Street - Visual Simulation
Figure D.18-19A. KOP 12 - Morongo Community Center - Existing View
Figure D.18-19B. KOP 12 - Morongo Community Center - Visual Simulation
Figure D.18-20A. KOP 13 - Haugen-Lehman Way - Existing View
Figure D.18-20B. KOP 13 - Haugen-Lehman Way - Visual Simulation
Figure D.18-21A. KOP 14 - PCT Parking Lot - Existing View
Figure D.18-21B. KOP 14 - PCT Parking Lot - Visual Simulation
Figure D.18-22A. KOP 15 - Whitewater Canyon Road - Existing View
Figure D.18-22B. KOP 15 - Whitewater Canyon Road - Visual Simulation
Figure D.18-23A. KOP 16 - Painted Hills Road - Existing View
Figure D.18-23B. KOP 16 - Painted Hills Road - Visual Simulation
Figure D.18-24A. KOP 17 - Southbound SR 62 - Existing View
Figure D.18-24B. KOP 17 - Southbound SR 62 - Visual Simulation
Figure D.18-25A. KOP 18 - Northbound Iowa Street - Existing View
Figure D.18-25B. KOP 18 - Northbound Iowa Street - Visual Simulation
D.19 Water Resources and Hydrology (5.1MB)
D.19.1 Environmental Setting / Affected Environment
D.19.2 Applicable Regulations, Plans, and Standards
D.19.3 Environmental Impacts of the Proposed Project
D.19.4 Environmental Impacts of Project Alternatives
D.19.5 Environmental Impacts of No Project / No Action Alternative
D.19.6 Mitigation Monitoring, Compliance, and Reporting
D.19.7 References
Figure D.19-1a. Hydrologic Features: Groundwater Basins, Floodplains, and Streams
Figure D.19-1b. Hydrologic Features:
Groundwater Basins, Floodplains, and Streams
Figure D.19-1c. Hydrologic Features:
Groundwater Basins, Floodplains, and Streams
Figure D.19-1d. Hydrologic Features:
Groundwater Basins, Floodplains, and Streams
Figure D.19-1e. Hydrologic Features:
Groundwater Basins, Floodplains, and Streams
Figure D.19-1f. Hydrologic Features:
Groundwater Basins, Floodplains, and Streams
Figure D.19-1g. Hydrologic Features:
Groundwater Basins, Floodplains, and Streams
Figure D.19-1h. Hydrologic Features:
Groundwater Basins, Floodplains, and Streams
Figure D.19-1i. Hydrologic Features:
Groundwater Basins, Floodplains, and Streams
D.20 Wildland Fire
D.20.1 Environmental Setting / Affected Environment
D.20.2 Applicable Regulations, Plans, and Standards
D.20.3 Environmental Impacts of the Proposed Project
D.20.4 Environmental Impacts of Project Alternatives
D.20.5 Environmental Impacts of No Project / No Action Alternative
D.20.6 Mitigation Monitoring, Compliance, and Reporting
D.20.7 References
Figure D.20-1. Fire Protection Responsibility Areas
Figure D.20-2. Fire Hazard Severity Zones
Figure D.20-3. Fire History
D.21 Electrical Interference and Safety
D.21.1 Environmental Setting / Affected Environment
D.21.2 Applicable Regulations, Plans, and Standards
D.21.3 Environmental Impacts of the Proposed Project
D.21.4 Environmental Impacts of Project Alternatives
D.21.5 Environmental Impacts of No Project / No Action Alternative
D.21.6 Mitigation Monitoring, Compliance, and Reporting
D.21.7 References
E. Cumulative Scenario and Impacts (4.0MB)
E.1 Introduction and Methodology
E.2 Cumulative Projects
E.3 Cumulative Impact Analysis for the Proposed Project
E.4 Cumulative Impact Analysis of Alternatives
E.5 References
Figure E-1a. Cumulative Projects
Figure E-1b. DRECP Transmission Technical Group Map for Preferred Alternative
Figure E-2a. Cumulative Future 500 kV Corridor Profile - Segment 2
Figure E-2b. Cumulative Future 500 kV Corridor Profile - Segment 3
Figure E-2c. Cumulative Future 500 kV Corridor Profile - Segment 4
Figure E-2d. Cumulative Future 500 kV Corridor Profile - Segment 6
Figure E-3a. KOP 2 - Canyon Vista Drive - Cumulative Simulation
Figure E-3b. KOP 4 - San Timoteo Canyon Road - Cumulative Simulation
Figure E-3c. KOP 7 - Solera Oakmont Clubhouse - Cumulative Simulation
Figure E-3d. KOP 12 - Morongo Community Center - Cumulative Simulation
Figure E-3e. KOP 13 - Haugen-Lehman Way - Cumulative Simulation
F. Other CEQA and NEPA Requirements
F.1 Growth-Inducing Effects
F.2 Significant Irreversible and Irretrievable Changes
F.3 Significant Environmental Effects that Cannot be Avoided if the Proposed Project is Implemented
F.4 Relationship Between Short-Term Uses and Long-Term Productivity of the Environment
F.5 Energy Conservation
F.6 References
G. Comparison of Alternatives
G.1 Introduction
G.2 Regulatory Requirements for Alternatives Comparison
G.3 Comparison Methodology
G.4 Comparison of Alternatives
G.5 Definition of the CPUC Environmentally Superior Alternative
G.6 No Project / No Action Alternative Compared to the Environmentally Superior Alternative
Figure G-1. Environmentally Superior Alternative
H. Mitigation Monitoring and Reporting
H.1 Authority for the MMCRP
H.2 Organization of the MMCRP
H.3 Roles and Responsibilities
H.4 Dispute Resolution
H.5 General Monitoring Procedures
I. Public Participation and Consultation
I.1 Introduction
I.2 EIR/EIS Scoping Process
I.3 Draft EIR/EIS Public Review Period
I.4 EIR/EIS Mailing List
I.5 Notice of Availability
I.6 EIR/EIS Information and Repository Sites
I.7 Consultation Processes for ESA Section 7, NHPA Section 106, and Indian Tribes
J. Glossary, Acronyms, Abbreviations
K. Index

APPENDICES
Appendix 1. Project Description Information
Appendix 1A - Structure Height Tables
Appendix 1B - FAA Hazard Marking Evaluations
Appendix 1C - Construction Equipment and Workforce Estimates
Appendix 2. Detailed Project Maps
Appendix 3. SCE-Morongo ROW Agreement - Appendix J of SCE's Application A.13-10-020
Appendix 4. EMF Field Management Plan
Appendix 5. Alternatives Screening Report
Attachment 1 - Phased Build Alternative Supporting Data
Attachment 2 - Project Alternatives Assessment - A Power Flow Analysis
Attachment 3 - Existing structures Design Review
Appendix 6. Air Quality
Appendix 7. Biological Resources
Tables of Special Status Plants and Wildlife
Biological Resources Figures
Appendix 8. Cultural Resources
Appendix 9. Policy Screening Report
Appendix 10. Visual Resources
Appendix 11. EIR/EIS Information Contacts
Appendix 12. Preparers and Reviewers
Appendix 13. Recipients of the EIR/EIS
   

This page contains tables and is best viewed with Firefox or Internet Explorer. Please report any problems to the Energy Division web coordinator.

   
 
Project Home Page - CPUC Environmental Information - CPUC Home